TenderDekho Logo
Active GEM

Indian Army Flame Sensor and Control Equipment Tender 2026 Rajasthan procurement for Temperature Controller and Controller Box

Bid Publish Date

05-Sep-2026, 11:40 am

Bid End Date

15-Sep-2026, 12:00 pm

Progress

Issue05-Sep-2026, 11:40 am
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for the supply of six critical fire-safety and control components: FLAME SENSOR, IGNITION ELECTRODE, NOZZLE FUEL, RELAY, TEMPERATURE CONTROLLER, and CONTROLLER BOX. The contract scope is limited to the supply of goods, with a potential multi-item package across these categories. Bidder must submit PAN, GSTIN, cancelled cheque, and EFT mandate as part of Vendor Code creation. The tender implicates a two-year warranty post final acceptance and a 3-year turnover assessment requirement. The unique aspect includes advance sample approval within 5 days of award and potential delivery timeline adjustments if the buyer delays sample approval. The opportunity lies in government procurement for defense equipment, with a need for materials that pass material test certificates and lab verification. The lack of explicit location in the data suggests a nationwide or unspecified deployment, but the organizational focus remains the Indian Army’s equipment supply chain.

Technical Specifications & Requirements

  • Items: FLAME SENSOR, IGNITION ELECTRODE, NOZZLE FUEL, RELAY, TEMPERATURE CONTROLLER, CONTROLLER BOX
  • Sample clause: submit advance samples within 5 days; approval or list of modifications within 5 days; bulk supply to follow approved specs; potential delay adjustments without LD
  • Certification: Material Test Certificate required; buyer lab testing determines acceptance
  • Warranty: 2 years from final acceptance or post-installation testing
  • Financial: Turnover criteria stated for last three years; audited statements or CA/Cost Accountant certificate
  • Scope: Only supply of goods; no installation requirements specified
  • EMD: Not specified in data; requires vendor documentation (PAN, GST, EFT mandate)
  • BoQ: 6 items listed; no quantities defined
  • Delivery terms: Not explicitly defined; contract framework allows deviation if buyer approval of samples delays

Terms, Conditions & Eligibility

  • EMD and exact turnover thresholds are not specified in the provided data; bidder must meet minimum average turnover criteria as per the bid document
  • Documents required: PAN, GSTIN, cancelled cheque, EFT mandate; additional typical bid docs implied (audited financials, experience certificates)
  • Sample/testing: advance sample submission within 5 days; acceptance criteria determined by buyer’s lab results
  • Warranty: 2-year warranty from acceptance/installation completion
  • Payment terms: Not detailed in data; standard defense procurement terms likely apply
  • Sample logistics: samples provided by contractor at no cost for testing; bulk manufacture contingent on approval
  • Termination: Buyer may terminate for major deviations after notifying deviations
  • Reliability: Isolated data; ensure compliance with standard material test procedures

Key Specifications

    • Product names: FLAME SENSOR; IGNITION ELECTRODE; NOZZLE FUEL; RELAY; TEMPERATURE CONTROLLER; CONTROLLER BOX
    • Warranty: 2 years from final acceptance or post-installation testing
    • Testing: Material Test Certificate required; buyer lab results govern acceptance
    • Turnover: minimum average annual turnover for last 3 years to be provided via audited statements or CA/Cost Accountant certificate
    • Sample timeline: submit advance sample within 5 days of award; buyer to approve or request modifications within 5 days

Terms & Conditions

  • Key Term 1: Advance sample submission within 5 days of contract award

  • Key Term 2: Material Test Certificate required with supply for acceptance

  • Key Term 3: 2-year warranty from final acceptance/commissioning

Important Clauses

Payment Terms

Not specified in data; expect standard defense procurement terms and submission of vendor banking details with EFT mandates

Delivery Schedule

Delivery timeline to be refixed if buyer delays approval of advance samples; no LD mentioned for sample delays

Penalties/Liquidated Damages

Not specified; contract allows termination for major deviations after notifying seller

Bidder Eligibility

  • Must provide PAN, GSTIN, and EFT mandate

  • Turnover: three-year average turnover as per bid document (audited or CA certificate)

  • Compliance with Material Test Certificate and lab acceptance

Tender Data

Bid Details

Quantity

12

Category

FLAME SENSOR

Bid Type

Two Packet Bid

Bid Validity

15 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

2 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FLAME SENSOR , IGNITION ELECTRODE , NOZZLE FUEL , RELAY , TEMPERATURE CONTROLLER , CONTROLLER BOX

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Srinagar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SrinagarSrinagar--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9850198.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

FLAME SENSOR

FLAME SENSOR

2 nos Delivery: 15 days
#2

IGNITION ELECTRODE

IGNITION ELECTRODE

2 nos Delivery: 15 days
#3

NOZZLE FUEL

NOZZLE FUEL

2 nos Delivery: 15 days
#4

RELAY

RELAY

2 nos Delivery: 15 days
#5

TEMPERATURE CONTROLLER

TEMPERATURE CONTROLLER

2 nos Delivery: 15 days
#6

CONTROLLER BOX

CONTROLLER BOX

2 nos Delivery: 15 days

Categories 14

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Material Test Certificate to be sent with supply

6

Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years

7

OEM authorizations (if applicable) and vendor code creation documents

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for flame sensor and controller equipment tender in India Army 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide turnover evidence for last three years via audited statements or CA certificate; attach Material Test Certificate with supply; advance samples required within 5 days of award, with 5-day modification cycle before bulk supply; warranty is 2 years post-acceptance.

What documents are required for Indian Army weapon system components tender 2026

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate; turnover proof for last 3 years; Material Test Certificate; supplier may need OEM authorization; samples for testing to be provided after award; bid pricing must cover all cost components for goods supply.

What are the technical specs for FLAME SENSOR and controller items in this bid

Specifications list six item categories: FLAME SENSOR, IGNITION ELECTRODE, NOZZLE FUEL, RELAY, TEMPERATURE CONTROLLER, CONTROLLER BOX; exact electrical/thermal specs are not published; materials must pass Material Test Certificate; approvals hinge on buyer lab results.

When is the sample submission deadline for advance approval in this tender

Advance samples must be submitted within 5 days of contract award; buyer will approve or request modifications within 5 days; if buyer delays, the delivery timeline is adjusted accordingly without LD.

What is the warranty period for supplied goods in the Indian Army procurement

The warranty period is 2 years from the date of final acceptance or after installation/commissioning where applicable; this warranty covers defects and performance as per contract specifications and testing outcomes.

What determines acceptance of supplied items in this defense tender

Acceptance is determined by the buyer lab via Material Test Certificate; items must conform to contract specifications; deviations may trigger rejection or require fresh samples; success hinges on passing lab tests and the approved sample baseline.

What are the turnover requirements for bidders in this procurement

Bidder must show a minimum average annual turnover for the last three years as per bid document, supported by audited balance sheets or CA/Cost Accountant certificate; if the company is under three years old, turnover is calculated from after-formation years.

What is the scope of supply for this Indian Army tender

Scope is strictly supply of goods for six categories: FLAME SENSOR, IGNITION ELECTRODE, NOZZLE FUEL, RELAY, TEMPERATURE CONTROLLER, and CONTROLLER BOX; installation and commissioning are not explicitly included unless stated in the contract.