TenderDekho Logo
Active GEM

Open Tender for Mill mein lage scraper hetu discharge chute ke jo bhag kamzor evam kat gaye hain. unhe kaatkar hata in MUZAFFARNAGAR, UTTAR PRADESH

Bid Publish Date

07-Aug-2026, 2:31 pm

Bid End Date

17-Aug-2026, 3:00 pm

EMD

₹240

Value

₹16,57,196

Location

MUZAFFARNAGAR , UTTAR PRADESH

Progress

Issue07-Aug-2026, 2:31 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

2064

Category

Mill mein lage scraper hetu discharge chute ke jo bhag kamzor evam kat gaye hain. unhe kaatkar hatana tatha nai 12 mm ki plate se taiyar kar punah sthapit karna. Sath hi scraper ko

Bid Type

Two Packet Bid

Categories 120

AGITATORS SIMPLEX PUMPS WORM PUMPS WIND MILL ENERGY PROJECT ANGLE IMPELLERS HOT AIR BLOWERS AXLE ALTERNATOR ANVIL HOUSEHOLD ITEM RING STRUCTURE FABRICATION COOLING FAN BUCKET ELEVATOR PERISTALTIC PUMPS TUBE AND FITTING AIR COOLED ENGINE DESERT COOLER SEALLESS PUMPS PAN MIXER HEAVY EQUIPMENT COMPONENT MIXERS PARTS AND ACCESSORIES WHEAT FLOUR AGRICULTURE EQUIPMENT STEEL FURNITURE CHANNEL WELL TESTING EQUIPMENTS BANANA OIL REGENERATION INDUSTRIAL WHEEL PLUMBER BLOCK BOILERS PUG MILL ROLLERS PUMP SPARE PARTS GRINDER HEATER SYNCHRONOUS MOTORS AIR DUCT MILITARY VEHICLE BED PUMPS NOZZLE SLUDGE PUMPS POWER CENTRIFUGAL MACHINE WATER METERS RECLAIMER AC PIPES PAPER AND PRINTING SERVICES BLASTING MACHINE ALLOY STEEL TRIPPER CUM STACKER GINNING OIL TREATMENT OF DRINKING WATER SKILLED MANPOWER FOOTWEARS ROTATING PISTON PUMPS AIR BLOWER BRANDY SKILLED PERSONNEL ALTERNATING CURRENT MOTOR BANJOES PNEUMATIC IDLER WHEEL AROMATIC SPIRIT ROTARY CAM PUMPS AC MOTORS DRINKING WATER SYSTEM SEED AND FEED EQUIPMENT BOX VALVE CENTRIFUGAL COMPRESSORS FILTER RETAINERS GEAR TROLLEY CHAFF CUTTER FUME HOODS ERECTION OF STRUCTURAL DRINKING WATER SUPPLY WORM GEAR BALANCE MIXER TURBINE PUMPS FLUE GAS STEAM GENERATOR STEAM PUMPS VACUUM CENTRIFUGES OVER HEAD TANK POLLUTION CONTROL SYSTEM DREDGE PUMPS FIBERS THREADS AND YARNS GAS BURNERS PROGRESSIVE CAVITY PUMPS DUCTING BRIDGE TRANSITION METALS AXIAL SPLIT PUMPS IMPACT WRENCH OVERHEAD STIRRERS TUBE WELL FABRICATOR SCRAP METAL SANITARY PUMPS MACHINE CHIMNEY SUPPLY OF SCRUBBER MODBUS SOLID ROCKET MOTORS METAL SCRAP STRUCTURE HYDRAULIC PEB PIPES FAN METAL PRODUCTS BAR STRING INSTRUMENTS SHOE ACCESSORIES BARREL MANUFACTURING SERVICES

N/a announces a tender for Mill mein lage scraper hetu discharge chute ke jo bhag kamzor evam kat gaye hain. unhe kaatkar hata in MUZAFFARNAGAR, UTTAR PRADESH. Quantity: 2064. Submission Deadline: 17-08-2026 15: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

PUNJAB NATIONAL BANK

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Muzaffarnagar

Delivery Pincodes

251316

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mukesh Kumar Verma251316,THE GANGA KISAN SAHKARI CHINI MILLS LTD MORNA MUZAFFARNAGAR PIN 251316 GST NO= 09AAAJT0456F1Z4 CONTACT NO 8840425682, 7880888915, 7880888912MuzaffarnagarUttar Pradesh251316390-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9708038.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 66 Items Sign in for GEM prices

#1

Mill mein lage scraper hetu discharge chute ke jo bhag kamzor evam kat gaye hain. unhe kaatkar hatana tatha nai 12 mm ki plate se taiyar kar punah sthapit karna. Sath hi scraper ko

Mill mein lage scraper hetu discharge chute ke jo bhag kamzor evam kat gaye hain. unhe kaatkar hatana tatha nai 12 mm ki plate se taiyar kar punah sthapit karna. Sath hi scraper ko baandhne hetu profile ke anusar hole wali plate lagakar/welding karke fix karna evam karya poorn hone ke pashchat trial dena.

3 per nos Delivery: 90 days
#2

Cane carrier ke galeghise runner base ko kaat kar hatana. 100 mm ke channel se box banakar runner base ko lagana evam fit karna va purane channel ko nikal kar

Cane carrier ke gale/ghise runner base ko kaat kar hatana. 100 mm ke channel se box banakar runner base ko lagana evam fit karna va purane channel ko nikal kar seedha karke palat kar lagana.

70 per meter Delivery: 90 days
#3

Cane unloader ke purane ghisekate 4050 mm size ke sq. bar ko kaat kar hatana tatha yathasthan poorv ki bhanti naye sq. bar ko lagana evam santoshjanak trial dena.

Cane unloader ke purane ghise/kate 40/50 mm size ke sq. bar ko kaat kar hatana tatha yathasthan poorv ki bhanti naye sq. bar ko lagana evam santoshjanak trial dena.

90 per meter Delivery: 90 days
#4

Cane carrierrake carrierbagasse elevatorR.B.C. ke ghisekate runner ko kaatkar hatana. uske sthan par purane ko palat kar athva naye runner ko poorvanusar lagana.

Cane carrier/rake carrier/bagasse elevator/R.B.C. ke ghise/kate runner ko kaatkar hatana. uske sthan par purane ko palat kar athva naye runner ko poorvanusar lagana.

300 per meter Delivery: 90 days
#5

Cane carrierrake carrierR.B.C. ityadi chains ke side ki katighisikamzor plate ko kaatkar hatana. uske sthan par purani athva nai plate ko lagana.

Cane carrier/rake carrier/R.B.C. ityadi chains ke side ki kati/ghisi/kamzor plate ko kaatkar hatana. uske sthan par purani athva nai plate ko lagana.

110 per sq mtr Delivery: 90 days
#6

Fibrizer hood ki side ki ghisikamzor plates ko kaatkar nikalna tatha yathasthan nai plate ko lagakar andar va bahar se welding kar santoshjanak trial dena.

Fibrizer hood ki side ki ghisi/kamzor plates ko kaatkar nikalna tatha yathasthan nai plate ko lagakar andar va bahar se welding kar santoshjanak trial dena.

3 per ton Delivery: 90 days
#7

Bagasse baling machine ki sampoorn overhauling. testing evam trial dena.

Bagasse baling machine ki sampoorn overhauling. testing evam trial dena.

1 lumpsum Delivery: 90 days
#8

S.R.C.I.R.C. ki purani racks ki vanchhit marammat karna.

S.R.C./I.R.C. ki purani racks ki vanchhit marammat karna.

120 per nos Delivery: 90 days
#9

Bagasse elevatorR.B.C. ki chains ki nai racks sample anusar taiyar karna.

Bagasse elevator/R.B.C. ki chains ki nai racks sample anusar taiyar karna.

45 per nos Delivery: 90 days
#10

T.R.P.F. ke galekamzor bottomtop cover ko badalne ke liye naye cover poorvanusar banakar lagana evam santoshjanak trial dena.

T.R.P.F. ke gale/kamzor bottom/top cover ko badalne ke liye naye cover poorvanusar banakar lagana evam santoshjanak trial dena.

10 per cover Delivery: 90 days
#11

S.R.C.I.R.C. ke galekamzor tail end boots ko kaatkar hatana tatha sample anusar 8.010.0 mm moti puraninai plate se taiyar kar lagana evam leak.proof welding kar santoshjanak trial dena.

S.R.C./I.R.C. ke gale/kamzor tail end boots ko kaatkar hatana tatha sample anusar 8.0/10.0 mm moti purani/nai plate se taiyar kar lagana evam leak.proof welding kar santoshjanak trial dena.

4 per boot Delivery: 90 days
#12

Cane unloaders ke panjon ke vibhinn parts ko dismantle karna. dismantle kiye gaye grabs ke sabhi parts ki vanchhit marammat karna. fingers par ni

Cane unloaders ke panjon ke vibhinn parts ko dismantle karna. dismantle kiye gaye grabs ke sabhi parts ki vanchhit marammat karna. fingers par nirdeshanusar hardfacing kar panjon ka punah assembly karna.

3 per nos Delivery: 90 days
#13

Mills ke compound imbibition hetu lagi juice tray mein se galikamzor juice tray ko kaatkar hatana. nai plate se sample anusar taiyar kar yathasthan lagana evam samast connection karna.

Mills ke compound imbibition hetu lagi juice tray mein se gali/kamzor juice tray ko kaatkar hatana. nai plate se sample anusar taiyar kar yathasthan lagana evam samast connection karna.

3 per nos Delivery: 90 days
#14

Cane carrierS.R.C.I.R.C. tatha bagasse elevator chains ko upar uthne se rokne ke liye lagi hui guides mein se ghisikamzor guides ko kaatkar hatana. nirdeshanusar nai guide taiyar

Cane carrier/S.R.C./I.R.C. tatha bagasse elevator chains ko upar uthne se rokne ke liye lagi hui guides mein se ghisi/kamzor guides ko kaatkar hatana. nirdeshanusar nai guide taiyar kar yathasthan lagakar santoshjanak trial dena.

22 per guide Delivery: 90 days
#15

Cane unloaders ke bridgetrolley drive ke ghisekate wheels ko nirdeshanusar welding karna.

Cane unloaders ke bridge/trolley drive ke ghise/kate wheels ko nirdeshanusar welding karna.

22 per nos Delivery: 90 days
#16

T.R.P.F. ke galekamzor donali chutes ko kaatkar hatana tatha purane anusar naye donali chute fabricate kar yathasthan erection karna.

T.R.P.F. ke gale/kamzor donali chutes ko kaatkar hatana tatha purane anusar naye donali chute fabricate kar yathasthan erection karna.

3 per chute suit Delivery: 90 days
#17

Cane carrier ke liye lagi idler wheel par nirdeshanusar M.S. ke ring fabricate kar lagana.

Cane carrier ke liye lagi idler wheel par nirdeshanusar M.S. ke ring fabricate kar lagana.

10 per nos Delivery: 90 days
#18

Mill head stock evam T.R.P.F. head stock ke beech nirdeshanusar 25.0 mm plate se support banakar lagana.

Mill head stock evam T.R.P.F. head stock ke beech nirdeshanusar 25.0 mm plate se support banakar lagana.

8 per nos Delivery: 90 days
#19

Fibrizer ke purane hammer shanks ko nirdeshanusar welding evam hardfacing kar marammat karna evam balance karna.

Fibrizer ke purane hammer shanks ko nirdeshanusar welding evam hardfacing kar marammat karna evam balance karna.

72 per nos Delivery: 90 days
#20

Cane chopperleveller ke gale huekamzor hoods ko kaatkar hatana tatha nai plate se naya folding type banakar lagana.

Cane chopper/leveller ke gale hue/kamzor hoods ko kaatkar hatana tatha nai plate se naya folding type banakar lagana.

2 per ton Delivery: 90 days
#21

Fibrizer ke pocketed type anvil plate ki pockets ki tooti plates ko nai plates se badalna. mudi hui plates ko seedha karna tatha welding kar taiyar karke nirdeshanusar hardfacing karna.

Fibrizer ke pocketed type anvil plate ki pockets ki tooti plates ko nai plates se badalna. mudi hui plates ko seedha karna tatha welding kar taiyar karke nirdeshanusar hardfacing karna.

1 lumpsum Delivery: 90 days
#22

Cane levellerchopper ke rotor assembly ki ghisi hubbo ke working side evam top sides ko welding kar samatal karna evam nirdeshanusar hardfacing karna.

Cane leveller/chopper ke rotor assembly ki ghisi hubbo ke working side evam top sides ko welding kar samatal karna evam nirdeshanusar hardfacing karna.

1 lumpsum Delivery: 90 days
#23

Cane unloaders par lage reduction gear evam motors ke kamzor beds ko kaatkar naye modify karke naye bed banakar lagana tatha gear evam motor ka alignment kar trial dena.

Cane unloaders par lage reduction gear evam motors ke kamzor beds ko kaatkar naye modify karke naye bed banakar lagana tatha gear evam motor ka alignment kar trial dena.

3 per hp Delivery: 90 days
#24

Cane carrier ki structure ke galekamzor columns ko nirdeshanusar plate lagakar welding kar majbooti pradan karna.

Cane carrier ki structure ke gale/kamzor columns ko nirdeshanusar plate lagakar welding kar majbooti pradan karna.

8 per nos Delivery: 90 days
#25

Mill rollers mein sample anusar juice ring fabricate kar fit karna.

Mill rollers mein sample anusar juice ring fabricate kar fit karna.

16 per nos Delivery: 90 days
#26

T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna.

T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna.

4 per chute suit Delivery: 90 days
#27

Mills ke galekamzor juice receiving tank ko kaatkar hatana. 8.010.0 mm moti plate se sample anusar tank fabricate kar yathasthan fit karna evam samast connection kar leak.proof trial dena.

Mills ke gale/kamzor juice receiving tank ko kaatkar hatana. 8.0/10.0 mm moti plate se sample anusar tank fabricate kar yathasthan fit karna evam samast connection kar leak.proof trial dena.

3 per tank Delivery: 90 days
#28

Mill ke juice receiving tank ke galekamzor bottom cone ko kaatkar hatana. sample anusar naya cone fabricate kar yathasthan fit karna. samast connection poorv ki bhanti karke leak.proof trial dena.

Mill ke juice receiving tank ke gale/kamzor bottom cone ko kaatkar hatana. sample anusar naya cone fabricate kar yathasthan fit karna. samast connection poorv ki bhanti karke leak.proof trial dena.

3 per nos Delivery: 90 days
#29

Mill juice tray se gutter ke madhya lage 10Inch12 Inch size ke galekamzor pipes ko kaatkar hatana tatha unke sthan par S.S. ke naye pipe fabricate kar fit karna evam leak.proof trial dena.

Mill juice tray se gutter ke madhya lage 10Inch/12 Inch size ke gale/kamzor pipes ko kaatkar hatana tatha unke sthan par S.S. ke naye pipe fabricate kar fit karna evam leak.proof trial dena.

4 per nos Delivery: 90 days
#30

S.R.C.I.R.C. ki bottom trough mein 3.00 mm motai ki S.S. plate se lining kar leak.proof welding karna.

S.R.C./I.R.C. ki bottom trough mein 3.00 mm motai ki S.S. plate se lining kar leak.proof welding karna.

50 per square feet sq ft Delivery: 90 days
#31

Boiler par feed pump no. 01 ka jo bed hil gaya hai use ukhadkar naya bed banakar lagana evam sambandhit connection kar trial dena.

Boiler par feed pump no. 01 ka jo bed hil gaya hai use ukhadkar naya bed banakar lagana evam sambandhit connection kar trial dena.

1 lumpsum Delivery: 90 days
#32

Boiler station par purani I.D. fan ki ducting mein chimney se pehle naipurani plate se damper leak.proof banana tatha poori welding karna jisse nai I.D. chalne par chimney se back hawa na aaye.

Boiler station par purani I.D. fan ki ducting mein chimney se pehle nai/purani plate se damper leak.proof banana tatha poori welding karna jisse nai I.D. chalne par chimney se back hawa na aaye.

4 per nos Delivery: 90 days
#33

Teeno wet scrubber ke pumps ke nipple reducers tatha inki gali pipe lines ko kaatkar hatana tatha naye pipe lines ko lagana tatha samast connection poorv ki bhanti karke leak.proof welding karna.

Teeno wet scrubber ke pumps ke nipple reducers tatha inki gali pipe lines ko kaatkar hatana tatha naye pipe lines ko lagana tatha samast connection poorv ki bhanti karke leak.proof welding karna.

3 per scrubber Delivery: 90 days
#34

Wet scrubber ki venturi ke andar samast nozzles ko kholna. kharab nozzles ko hatana evam naye nozzle lagana tatha samast connection poorv ki bhanti karna.

Wet scrubber ki venturi ke andar samast nozzles ko kholna. kharab nozzles ko hatana evam naye nozzle lagana tatha samast connection poorv ki bhanti karna.

3 per scrubber Delivery: 90 days
#35

Service tank se wet scrubber tak back wash hetu purani boiler tubes se nai pipe taiyar karna evam pipe line mein nai valve tatha clamp lagakar samast connection karna.

Service tank se wet scrubber tak back wash hetu purani boiler tubes se nai pipe taiyar karna evam pipe line mein nai valve tatha clamp lagakar samast connection karna.

1 lumpsum Delivery: 90 days
#36

T.R.P.F. ke neeche se mill juice tray mein juice lane wali tray mein se kamzor evam gali juice tray ko kaatkar hatana. nai banakar chalana.

T.R.P.F. ke neeche se mill juice tray mein juice lane wali tray mein se kamzor evam gali juice tray ko kaatkar hatana. nai banakar chalana.

3 per nos Delivery: 90 days
#37

Boilers ke galekamzor ash chutes ko kaatkar hatana. puraninai plate se purane anusar naye chutes fabricate kar yathasthan fit karna.

Boilers ke gale/kamzor ash chutes ko kaatkar hatana. purani/nai plate se purane anusar naye chutes fabricate kar yathasthan fit karna.

6 per chute suit Delivery: 90 days
#38

Air heaters. economizer. F.D.I.D. fans ke inletoutlet athva suctiondelivery ke galekamzor dampers ki vanchhit marammat kar theek karna.

Air heaters. economizer. F.D./I.D. fans ke inlet/outlet athva suction/delivery ke gale/kamzor dampers ki vanchhit marammat kar theek karna.

18 per nos Delivery: 90 days
#39

Boilers ke drum mein lagne wale internal steam filter ke lage frames evam jaliyon ko badalne ke liye naye frame banakar jali fit karna.

Boilers ke drum mein lagne wale internal steam filter ke lage frames evam jaliyon ko badalne ke liye naye frame banakar jali fit karna.

3 per jali Delivery: 90 days
#40

I.D. fans se chimney ke beech ki galikamzor flue gas ducting ko kaatkar hatana. inke sthan par 5.06.0 mm moti plate se banakar lagana. leak.proof trial dena.

I.D. fans se chimney ke beech ki gali/kamzor flue gas ducting ko kaatkar hatana. inke sthan par 5.0/6.0 mm moti plate se banakar lagana. leak.proof trial dena.

2 per ton Delivery: 90 days
#41

Bagassilo fan ke kamzor. sample anusar naye impeller taiyar karna. casing ki vanchhit marammat karna evam safal trial dena evam naya banana.

Bagassilo fan ke kamzor. sample anusar naye impeller taiyar karna. casing ki vanchhit marammat karna evam safal trial dena evam naya banana.

1 per nos Delivery: 90 days
#42

I.D.F.D. fans ki casing mein lage suction cone mein se galekamzor cones ko kaatkar hatana. naye cone sample anusar banakar lagana. safal trial dena.

I.D./F.D. fans ki casing mein lage suction cone mein se gale/kamzor cones ko kaatkar hatana. naye cone sample anusar banakar lagana. safal trial dena.

5 per cone Delivery: 90 days
#43

Boiler feed tank ke andar lagi baffle plates ki gali kamzor jaliperforated sheet ko badalna.

Boiler feed tank ke andar lagi baffle plates ki gali kamzor jali/perforated sheet ko badalna.

5 per jali Delivery: 90 days
#44

Boiler No. 1. 2 va 3 ke galekamzor bagasse feeding chutes ko kaatkar hatana tatha vanchhit marammat karna.

Boiler No. 1. 2 va 3 ke gale/kamzor bagasse feeding chutes ko kaatkar hatana tatha vanchhit marammat karna.

4 per chute suit Delivery: 90 days
#45

20 Ton kshamata ke Boiler No. 1 va 2 ki furnace mein F.D. ki atirikt hawa dene ke liye bahar se lage air headers mein se galekamzor headers ko naye headers se badalna.

20 Ton kshamata ke Boiler No. 1 va 2 ki furnace mein F.D. ki atirikt hawa dene ke liye bahar se lage air headers mein se gale/kamzor headers ko naye headers se badalna.

4 per header Delivery: 90 days
#46

Air heater se I.D. fans ke beech ki galikamzor ducting ko kaatkar 56 mm moti plate se ducting taiyar kar lagana.

Air heater se I.D. fans ke beech ki gali/kamzor ducting ko kaatkar 5/6 mm moti plate se ducting taiyar kar lagana.

5 per ton Delivery: 90 days
#47

Bagasse elevator mein bagasse se bagassilo filtration ke liye lagi perforated jaliyon mein se kshatigrast jaliyon ko hatakar nai jali fit karna.

Bagasse elevator mein bagasse se bagassilo filtration ke liye lagi perforated jaliyon mein se kshatigrast jaliyon ko hatakar nai jali fit karna.

3 per nos Delivery: 90 days
#48

20 Ton kshamata ke Boiler No. 1 va 2 ke economizer coilstubes ko neeche utarna. tubes ki antarik evam bahya safai uparant tubes ki manak pressure par hydraulic testing karna.

20 Ton kshamata ke Boiler No. 1 va 2 ke economizer coils/tubes ko neeche utarna. tubes ki antarik evam bahya safai uparant tubes ki manak pressure par hydraulic testing karna. testing uparant tubes ko upar chadha kar economizer ke band baandhkar leak.proof kar economizers ki santoshjanak hydraulic testing dena.

2 per job lumpsum Delivery: 90 days
#49

S.R.C.I.R.C. ke galekamzor trough ke channelplate ko kaatkar hatana tatha nirdeshanusar fabricate kar yathasthan lagana.

S.R.C./I.R.C. ke gale/kamzor trough ke channel/plate ko kaatkar hatana tatha nirdeshanusar fabricate kar yathasthan lagana.

2 ek job lumpsum Delivery: 90 days
#50

Boilers ki chimney ki strengthening hetu angle iron ke rings banakar lagana.

Boilers ki chimney ki strengthening hetu angle iron ke rings banakar lagana.

20 per ring lumpsum Delivery: 90 days
#51

Cane unloader ke truss type bridge structure jo kamzor evam kshatigrast hai ko naye channel. angle va plate lagakar avashyak strengthening kar santoshjanak strength pradan karna.

Cane unloader ke truss type bridge structure jo kamzor evam kshatigrast hai ko naye channel. angle va plate lagakar avashyak strengthening kar santoshjanak strength pradan karna.

1 per nos Delivery: 90 days
#52

S.R.C.I.R.C. chains ki block type chain ki links ke dono siron ke oval hueghis kar badh gaye holes ko weld karna. tatha attachment mein baandhkar pin ke size ke hole karna evam faces par

S.R.C./I.R.C. chains ki block type chain ki links ke dono siron ke oval hue/ghis kar badh gaye holes ko weld karna. tatha attachment mein baandhkar pin ke size ke hole karna evam faces par grinding kar samatal karna.

450 prati link Delivery: 90 days
#53

S.R.C.I.R.C. chains ki block type chain ki links par rack baandhne ke liye lagi attachment jo ghis kar kamzor ho gayi hai tatha holes badh gaye hain. use kaatkar hatana evam 12 mm moti

S.R.C./I.R.C. chains ki block type chain ki links par rack baandhne ke liye lagi attachment jo ghis kar kamzor ho gayi hai tatha holes badh gaye hain. use kaatkar hatana evam 12 mm moti plate se attachment link poorv ki bhanti taiyar kar links par weld karna. drawing anusar holes drill kar taiyar karna.

300 prati link Delivery: 90 days
#54

Teeno unloaders par jaane ke alag se purane angle channel se plateform rasta banana.

Teeno unloaders par jaane ke alag se purane angle channel se plateform rasta banana.

1 lumpsum Delivery: 90 days
#55

I.D. fan casing. air heater cellducting. economizer cell ke galekamzor bhagon ko badalna.

I.D. fan casing. air heater cell/ducting. economizer cell ke gale/kamzor bhagon ko badalna.

45 prati varg meter sq mtr Delivery: 90 days
#56

S.R.C.I.R.C. ki bottom trough evam boot ki M.S. ki purani plate ko kaatkar hatana. nai plate lagakar trough va boot ko leak.proof karna tatha iske upar S.S. ki 3 mm motai ki plate lagakar

S.R.C./I.R.C. ki bottom trough evam boot ki M.S. ki purani plate ko kaatkar hatana. nai plate lagakar trough va boot ko leak.proof karna tatha iske upar S.S. ki 3 mm motai ki plate lagakar boot evam trough ki lining karna evam santoshjanak trial dena.

1 ek job lumpsum Delivery: 90 days
#57

S.R.C.I.R.C. chains hetu 25 mm moti plate se sample anusar nai rack fabricate karna. holes drill kar dono siron par upar.neeche chain ke rollers ko kaatkar support lagakar taiyar karna.

S.R.C./I.R.C. chains hetu 25 mm moti plate se sample anusar nai rack fabricate karna. holes drill kar dono siron par upar.neeche chain ke rollers ko kaatkar support lagakar taiyar karna.

25 per rack Delivery: 90 days
#58

T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna.

T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna.

4 per chute suit Delivery: 90 days
#59

Cane unloader mein trolley ka jo 250 mm channel beech mein bend ho gaya hai use nikal kar line level karna. usmein structure ki strengthening karna. usmein

Cane unloader mein trolley ka jo 250 mm channel beech mein bend ho gaya hai use nikal kar line level karna. usmein structure ki strengthening karna. usmein gala/ghisa runner square bar fit karna evam diagonal check karna tatha wheel ka line level karna.

3 per nos Delivery: 90 days
#60

Mill va power house ki crane ke charon wheel kholkar safai evam bearing check karna. tatha sabhi plumber block mein greasing karna. jo bearing kharab nikle use mill

Mill va power house ki crane ke charon wheel kholkar safai evam bearing check karna. tatha sabhi plumber block mein greasing karna. jo bearing kharab nikle use mill spare se badalna tatha wheel jo rut gaye hain unhe weld kar ek size mein karna va santoshjanak trial dena.

3 per nos Delivery: 90 days
#61

T.R.P.F. ke topbottom rollers ki ghisi shelldanton ki vanchhit marammat kar hardfacing karna tatha shell ki kam hui lambai ko poora karne ke liye dono sides mein avashyaktaanusar rings lagana.

T.R.P.F. ke top/bottom rollers ki ghisi shell/danton ki vanchhit marammat kar hardfacing karna tatha shell ki kam hui lambai ko poora karne ke liye dono sides mein avashyaktaanusar rings lagana.

8 per nos Delivery: 90 days
#62

Mill ki gali kamzor juice tray ko kaatkar hatana tatha nai 5 mm ki S.S. plate se sample ke anuroop banakar taiyar karna evam leak.proof trial dena.

Mill ki gali kamzor juice tray ko kaatkar hatana tatha nai 5 mm ki S.S. plate se sample ke anuroop banakar taiyar karna evam leak.proof trial dena.

4 per nos Delivery: 90 days
#63

Mill ki S.S. ki juice tray ki baadhit marammat karna.

Mill ki S.S. ki juice tray ki baadhit marammat karna.

4 per nos Delivery: 90 days
#64

Mill ka head stock crack hone ya alignment kharab hone par head stock ko nikal kar bahar karna tatha regrout kar alignment karna evam sambandhit sabhi karya poorn karna.

Mill ka head stock crack hone ya alignment kharab hone par head stock ko nikal kar bahar karna tatha regrout kar alignment karna evam sambandhit sabhi karya poorn karna.

3 per nos Delivery: 90 days
#65

T.R.P.F. roller jo kharab ho gaye hain unki shaft nikal kar usmein shell ko gas se dismantle karna.

T.R.P.F. roller jo kharab ho gaye hain unki shaft nikal kar usmein shell ko gas se dismantle karna.

3 per nos Delivery: 90 days
#66

Boiler se nikli 63.5 mm ki purani bends sahit tubes ko kaatkar 5.1 meter ki seedhi line banana. air heater hetu taiyar karna evam grinder maar kar safai karna.

Boiler se nikli 63.5 mm ki purani bends sahit tubes ko kaatkar 5.1 meter ki seedhi line banana. air heater hetu taiyar karna evam grinder maar kar safai karna.

120 per nos Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data