Punjab National Bank Air Conditioner Procurement Wall Mount ISI Marked to IS1391 Part 2 2026 Tender
Punjab National Bank
MUMBAI, MAHARASHTRA
Bid Publish Date
18-Jun-2026, 5:51 pm
Bid End Date
25-Jun-2026, 6:00 pm
Progress
Quantity
7
Bid Type
Two Packet Bid
The State Bank of India invites bids for the procurement of Split Air Conditioners, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2). The tender emphasizes Supply, Installation, Testing and Commissioning of the AC units, with no BOQ items listed. A flexible quantity clause allows a ยฑ25% adjustment at contract award and during the contract period. The procurement targets SBI offices, with no explicit location or end-user site details provided. The ATC requires bidders to meet financial health and certificate requirements, ensuring capable suppliers for government-related cooling solutions. The opportunity is unique due to ISI compliance and the specific V3 wall-mount standard, aligning with ISI-marked safety and reliability expectations.
Product/service names: Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2)
Estimated value: Not specified in available data
Quantity: Not disclosed; subject to ยฑ25% option during and after award
Standards/certifications: ISI Mark; IS 1391 (Part 2)
Delivery scope: Supply, Installation, Testing and Commissioning
Eligibility: Turnover requirement in last three financial years; audited statements or CA certificate
Not under liquidation or court receivership
Minimum average annual turnover as specified in the bid document (last 3 years)
Evidence of ISI compliance and any required OEM authorization
Ability to supply, install, test and commission with post-installation support
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Punjab National Bank
MUMBAI, MAHARASHTRA
Punjab National Bank
MUMBAI, MAHARASHTRA
Odisha Police
KHORDHA, ODISHA
Central Institute Of Plastics Engineering And Technology (cipet)
CHENNAI, TAMIL NADU
Mecon Limited
RANCHI, JHARKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements for last 3 years or CA certificate indicating turnover
Certificate of turnover evidence (as per bid document)
Bid security/EMD as specified in the bid document
Technical bid documents demonstrating ISI compliance and OEM authorization (if required)
Manufacturer/OEM authorization letter (if applicable)
Any certificates requested in ATC and Corrigendum (if issued)
Bidders should register on the e-procurement portal, upload GST, PAN, and FCA turnover certificates, and submit ISI-compliant OEM authorization if required. Include EMD as per bid document, and provide proof of turnover for last 3 years. Ensure supply, installation, testing and commissioning are included.
Submit GST certificate, PAN, audited financial statements or CA turnover certificate for last 3 years, EMD, technical bid with ISI compliance, and OEM authorization if applicable. Ensure documents match terms in ATC and Corrigendum to avoid rejection.
Units must be ISI marked and comply with IS 1391 (Part 2) for wall-mount split air conditioners. Vendors should provide ISI certification and OEM documentation proving conformity to the standard for eligibility.
Delivery terms allow expansion up to 25% of contracted quantity at the bid rate, with extended delivery time calculated as (additional quantity/original quantity) ร original period, minimum 30 days, subject to the original delivery period and option extension.
Provide audited balance sheets for the last 3 years or a CA-certified turnover certificate showing the average annual turnover; ensure bidder is not in liquidation or similar distress as per ATC.
Scope includes Supply, Installation, Testing and Commissioning of ISI-marked split AC units (Wall Mount V3). Bid must cover all costs under the bid price, including delivery and commissioning activities at SBI sites.
Failure to upload any required certificates as per the Bid Document/ATC results in bid rejection. Ensure all certificates (ISI, OEM authorizations, turnover proofs) are uploaded before the bid submission deadline.
Regional Rural Banks (rrb)
๐ GHAZIPUR, UTTAR PRADESH
Prasar Bharati Broadcasting Corporation Of India
Central Board Of Excise And Customs (cbec)
๐ INDORE, MADHYA PRADESH
N/a
๐ SONIPAT, HARYANA
The Cotton Corporation Of India Limited
๐ NEW DELHI, DELHI
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS