TenderDekho Logo
Active GEM

Contract Bidding Open For Operation and maintenance services preventive and breakdown For first year,Operation and maintenanc in RANCHI, JHARKHAND

Bid Publish Date

08-Oct-2026, 7:47 pm

Bid End Date

29-Oct-2026, 8:00 pm

EMD

₹1,74,532

Value

₹58,17,721

Progress

Issue08-Oct-2026, 7:47 pm
AwardPending

Public procurement opportunity for Airports Authority Of India Operation and maintenance services preventive and breakdown For first year, Operation and maintenance services preventive and breakdown For second year, Supply and replacement of existing 100mm dia pressure guages, Supply and Replacement of existing V Belt of Air Blower, Dismantling overhauling and servicing of all type of centrifugal pumpsets Upto 2 HP, Dismantling overhauling and servicing of all type of centrifugal pumpsets Above 2HP upto 5HP, Dismantling lifting lowering painting and re installation Upto 2 HP, Dismantling lifting lowering painting and re installation Above 2HP upto 5HP, Dismantling overhauling and servicing of all type of Hydro pneumatic System 2. 5 HP, Dismantling overhauling and servicing of all type of Hydro pneumatic System 5. 5 HP, Rewinding of following Capacity Blower motor 20HP motor, Rewinding of following Capacity Blower motor 3HP motor, Supply of Industrial Salt, Supply of Poly electrolyte, Supply of Sodium Hypo Chlorite, Supply of Alum, Supply of Lime, Supply of Gear oil for Air-compressor, Supply of Teflon tape, Supply of PPE kit Porotective work wear, Supply of Hand Gloves, Supply of Eyegear, Supply of Mask, Testing of PH Test BOD Tests COD Tests Suspended Solids Tests Total dissolved solid Oil and Grease MLSS in RANCHI, JHARKHAND. Quantity: 1161 issued by. Submission Deadline: 29-10-2026 20: 00: 00. View full details and respond.

Advertisement

Tender Data

Bid Details

Quantity

1161

Category

Operation and maintenance services preventive and breakdown For first year

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

9

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Operation and maintenance services preventive and breakdown For first year , Operation and maintenance services preventive and breakdown For second year , Supply and replacement of existing 100mm dia pressure guages , Supply and Replacement of existing V Belt of Air Blower , Dismantling overhauling and servicing of all type of centrifugal pumpsets Upto 2 HP , Dismantling overhauling and servicing of all type of centrifugal pumpsets Above 2HP upto 5HP , Dismantling lifting lowering painting and re installation Upto 2 HP , Dismantling lifting lowering painting and re installation Above 2HP upto 5HP , Dismantling overhauling and servicing of all type of Hydro pneumatic System 2.5 HP , Dismantling overhauling and servicing of all type of Hydro pneumatic System 5.5 HP , Rewinding of following Capacity Blower motor 20HP motor , Rewinding of following Capacity Blower motor 3HP motor , Supply of Industrial Salt , Supply of Poly electrolyte , Supply of Sodium Hypo Chlorite , Supply of Alum , Supply of Lime , Supply of Gear oil for Air-compressor , Supply of Teflon tape , Supply of PPE kit Porotective work wear , Supply of Hand Gloves , Supply of Eyegear , Supply of Mask , Testing of PH Test BOD Tests COD Tests Suspended Solids Tests Total dissolved solid Oil and Grease MLSS

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Ranchi

Delivery Pincodes

834002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rijendra Kumar834002,BIRSA MUNDA AIRPORT, RANCHIRanchiJharkhand83400212730-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10007588.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Birsa Munda Airport Ranchi

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

Operation and maintenance services preventive and breakdown For first year

Operation and maintenance services preventive and breakdown For first year

12 job Delivery: 730 days
#2

Operation and maintenance services preventive and breakdown For second year

Operation and maintenance services preventive and breakdown For second year

12 job Delivery: 730 days
#3

Supply and replacement of existing 100mm dia pressure guages

Supply and replacement of existing 100mm dia pressure guages

2 each Delivery: 730 days
#4

Supply and Replacement of existing V Belt of Air Blower

Supply and Replacement of existing V Belt of Air Blower

2 each Delivery: 730 days
#5

Dismantling overhauling and servicing of all type of centrifugal pumpsets Upto 2 HP

Dismantling overhauling and servicing of all type of centrifugal pumpsets Upto 2 HP

4 each Delivery: 730 days
#6

Dismantling overhauling and servicing of all type of centrifugal pumpsets Above 2HP upto 5HP

Dismantling overhauling and servicing of all type of centrifugal pumpsets Above 2HP upto 5HP

4 each Delivery: 730 days
#7

Dismantling lifting lowering painting and re installation Upto 2 HP

Dismantling lifting lowering painting and re installation Upto 2 HP

3 each Delivery: 730 days
#8

Dismantling lifting lowering painting and re installation Above 2HP upto 5HP

Dismantling lifting lowering painting and re installation Above 2HP upto 5HP

2 each Delivery: 730 days
#9

Dismantling overhauling and servicing of all type of Hydro pneumatic System 2.5 HP

Dismantling overhauling and servicing of all type of Hydro pneumatic System 2.5 HP

2 each Delivery: 730 days
#10

Dismantling overhauling and servicing of all type of Hydro pneumatic System 5.5 HP

Dismantling overhauling and servicing of all type of Hydro pneumatic System 5.5 HP

4 each Delivery: 730 days
#11

Rewinding of following Capacity Blower motor 20HP motor

Rewinding of following Capacity Blower motor 20HP motor

2 each Delivery: 730 days
#12

Rewinding of following Capacity Blower motor 3HP motor

Rewinding of following Capacity Blower motor 3HP motor

2 each Delivery: 730 days
#13

Supply of Industrial Salt

Supply of Industrial Salt

500 kg Delivery: 730 days
#14

Supply of Poly electrolyte

Supply of Poly electrolyte

100 kg Delivery: 730 days
#15

Supply of Sodium Hypo Chlorite

Supply of Sodium Hypo Chlorite

200 ltr Delivery: 730 days
#16

Supply of Alum

Supply of Alum

100 kg Delivery: 730 days
#17

Supply of Lime

Supply of Lime

100 kg Delivery: 730 days
#18

Supply of Gear oil for Air-compressor

Supply of Gear oil for Air-compressor

50 litre Delivery: 730 days
#19

Supply of Teflon tape

Supply of Teflon tape

20 nos Delivery: 730 days
#20

Supply of PPE kit Porotective work wear

Supply of PPE kit Porotective work wear

6 set Delivery: 730 days
#21

Supply of Hand Gloves

Supply of Hand Gloves

6 set Delivery: 730 days
#22

Supply of Eyegear

Supply of Eyegear

10 each Delivery: 730 days
#23

Supply of Mask

Supply of Mask

10 each Delivery: 730 days
#24

Testing of PH Test BOD Tests COD Tests Suspended Solids Tests Total dissolved solid Oil and Grease MLSS

Testing of PH Test BOD Tests COD Tests Suspended Solids Tests Total dissolved solid Oil and Grease MLSS

8 job Delivery: 730 days

Categories 41

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement