TenderDekho Logo
Open Power and Energy NPROCURE

Tender for Loading & Unloading of 8m & 10m PSC Poles for Himatnagar Division

Bid Publish Date

21-Feb-2026, 6:00 pm

Bid End Date

12-Mar-2026, 6:00 pm

Value

₹19,93,728

Progress

Issue21-Feb-2026, 6:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹1,180

Contract Form

Works

Completion Period

12  Months

Currency Type

Single

Categories 5

This government tender offers a valuable opportunity for companies specializing in electrical infrastructure logistics and heavy equipment handling. Uttar Gujarat Vij Company Limited invites bids for loading and unloading of 8m and 10m PSC poles at Himatnagar Division, Gujarat. The project aims to enhance electrical distribution infrastructure, requiring experienced contractors with proven capabilities in handling large electrical poles safely and efficiently. The tender process is conducted electronically, ensuring transparency and fairness, with detailed evaluation criteria. The estimated project value is approximately INR 19.94 lakh, with a 12-month completion period. Bidders must meet strict eligibility requirements, including valid certifications, financial stability, and relevant experience. This opportunity is ideal for logistics firms, electrical contractors, and infrastructure service providers seeking to collaborate with a leading power utility in Gujarat. The tender includes comprehensive documentation, clear deadlines, and support for bidders, making it accessible for qualified companies to participate and contribute to Gujarat’s power sector development.

Scope Of Work

The selected contractor will be responsible for the following:

  • Loading and unloading of 8-meter and 10-meter PSC poles at Himatnagar Division.
  • Ensuring safety protocols are strictly followed during handling.
  • Using appropriate equipment for heavy pole handling.
  • Coordinating with UGVCL staff for smooth operations.

The process includes:

  1. Receiving the poles at designated sites.
  2. Properly stacking and securing poles during transportation.
  3. Unloading poles at the specified locations.
  4. Ensuring all activities comply with safety and quality standards.
Equipment Required Specifications
Crane or Forklift Capable of handling 8-10 meter poles
Safety Gear Helmets, gloves, safety shoes
Transportation Vehicles Suitable for heavy poles

The contractor must ensure timely completion within the 12-month period and maintain detailed records of all activities for verification.

Technical Specifications

The contractor must utilize equipment capable of handling poles up to 10 meters in length with a minimum lifting capacity of 2 tons. The equipment must be certified and regularly maintained. The process involves sequential loading, transportation, and unloading, following safety standards. The poles should be handled with care to prevent damage. The technical parameters include:

Parameter Specification
Handling Capacity Up to 2 tons
Equipment Type Crane, Forklift
Safety Standards ISO 45001, IS 2925
Transportation Suitable heavy-duty trucks

The contractor shall follow the detailed procedures for each stage, ensuring safety and efficiency throughout.

Financial Requirements

The total estimated budget for this project is INR 19,93,728. Payment will be made in installments based on milestones achieved, verified by site inspections. The breakdown is as follows:

Cost Component Amount (INR)
Loading & Unloading 12,00,000
Transportation 5,00,000
Miscellaneous 2,93,728

Payment Schedule:

  • 30% advance upon contract signing.
  • 40% after completion of loading and transportation.
  • 30% post successful unloading and inspection.

All payments are subject to submission of valid invoices and compliance with contractual terms.

Documents 2

01-Main Page.pdf

TENDER_DOCUMENT

SCHEDULE-B.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Must have a valid vendor registration with UGVCL or relevant power sector authorities.
✓ Must possess a valid GST registration and PAN card.
✓ Must submit Income Tax and Solvency certificates.
✓ Must provide experience certificates demonstrating successful handling of similar electrical infrastructure projects.
✓ Must submit PF/EPF Challan copies for the last six months.
✓ Must demonstrate financial stability with a minimum turnover as per the financial qualification table below:

Financial Criteria Minimum Requirement
Annual Turnover INR 10,00,000
Solvency Certificate INR 5,00,000

All bidders must meet the above criteria to qualify for submission.

Bidding Process

Process Timeline

1. Preliminary stage

13-03-2026 11:00

2. Price bid

13-03-2026 11:30

Required Forms

Preliminary

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

Price

Percentage Rate

Library-Secured

Required

Required Documents

Stage - Preliminary stage

1

Copy of PAN Card

Required
2

Income Tax certificate

Required
3

GST NO.

Required
4

PF/EPF Challan copy of last six month

Required
5

The experience certificate

Required
6

Copy of labour group insurance

7

Copy of vendor registration

Required
8

The solvency certificate

Required

Form - Tender Fee Form

1

Provide any proof of Bid Processing Fee

Form - Emd Fee Form

1

Provide any proof of EMD Document

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the scope of this tender?

This tender involves loading and unloading of 8-meter and 10-meter PSC poles at Himatnagar Division. The contractor must handle large electrical poles using appropriate equipment, ensuring safety and efficiency throughout the process. The scope includes transportation, stacking, and precise unloading as per project specifications.

What are the eligibility criteria for bidders?

Bidders must possess valid vendor registration, GST, PAN, Income Tax, and Solvency certificates. Experience in similar electrical infrastructure projects, along with PF/EPF compliance, is mandatory. The minimum financial turnover required is INR 10,00,000 annually, with a solvency certificate of at least INR 5,00,000. All documents must be submitted as per the checklist.

How is the bidding process conducted?

The process includes downloading tender documents, submitting technical and financial bids electronically, and bid opening on scheduled dates. Bidders must adhere to deadlines, upload all required documents, and participate in the evaluation process, which is transparent and based on predefined criteria.

What is the estimated project value and payment terms?

The estimated project cost is INR 19,93,728. Payments will be made in installments: 30% advance, 40% after loading and transportation, and 30% after unloading and inspection. Payments depend on submission of valid invoices and compliance with contractual terms.

What are the key dates for this tender?

Key dates include bid start on 21-02-2026, bid submission deadline on 12-03-2026, evaluation on 13-03-2026, and final notification on the same day. Bidders must ensure timely submission, as late bids will not be accepted.