TenderDekho Logo
Closed Open State Governments & UT NPROCURE

Tender for Supply, Installation & Commissioning of 12m High Mast with LED Lights in Umber Village, Surat

Bid Publish Date

23-Apr-2025, 12:30 pm

Bid End Date

12-May-2025, 12:30 pm

EMD

₹3,800

Value

₹3,76,985

Progress

Issue23-Apr-2025, 12:30 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

State Governments & UT

Tender Fee

₹708

Contract Form

Works

Completion Period

75  Days

Currency Type

Single

Categories 14

This government tender offers an opportunity for qualified electrical and infrastructure contractors to participate in the Supply, Installation, and Commissioning of a 12-meter high mast with LED luminaires in the village of Umber, Surat. Funded by municipal development grants, the project aims to enhance outdoor lighting infrastructure in South Zone-B (Kanakpur). The scope includes providing all necessary materials, erection, testing, and commissioning on a turnkey basis, adhering to Indian Standards and safety regulations. With an estimated contract value of approximately 3,76,985 INR and a completion timeline of 75 days, this tender is ideal for experienced contractors specializing in outdoor lighting solutions. Bidders must meet eligibility criteria, submit all required documents electronically within deadlines, and ensure compliance with technical specifications. This project will significantly improve public safety and urban aesthetics, making it a valuable opportunity for companies in the electrical infrastructure sector seeking government contracts in Gujarat.

Scope Of Work

The contractor shall undertake the complete supply, erection, testing, and commissioning of a 12-meter high mast with LED luminaires in the designated village of Umber, South Zone-B, Surat. The scope includes:

  • Supply of all materials including high mast poles, LED luminaires, cables, and accessories.
  • Erection of the high mast structure following safety and technical standards.
  • Electrical wiring, connection, and integration with existing power supply.
  • Testing of the entire lighting system to ensure compliance with specifications.
  • Commissioning and handover of the completed installation.

The work must be executed on a turnkey basis, with the contractor responsible for making all arrangements, including obtaining permits and licenses. The contractor shall produce a latest solvency certificate of at least 20% of the total estimated tender value, valid for the bid validity period. The work must be completed within 75 days from the date of award.

Key Deliverables Details
Material Supply High mast pole, LED luminaires, cables, accessories
Erection & Installation Structural erection, electrical wiring
Testing & Commissioning System testing, quality checks
Documentation Completion reports, safety certificates

The contractor shall also ensure compliance with all relevant regulations and codes, including obtaining necessary permits and licenses. The work shall be carried out with quality workmanship, safety standards, and within the stipulated timeline.

Technical Specifications

The high mast pole shall be approximately 12 meters in height, fabricated from durable, corrosion-resistant materials conforming to IS standards. The LED luminaires shall be energy-efficient, with a minimum lumen output suitable for street lighting, and compliant with IS 16103 standards. Electrical wiring shall be done with high-quality cables rated for outdoor use, ensuring safety and longevity.

Parameter Requirement
Mast Height 12 meters
Material Galvanized steel or equivalent
Luminaire Type LED, energy-efficient
Power Rating As per design specifications, typically 150W
Voltage 230V AC, 50Hz
Cable Specification Outdoor, UV resistant, conforming to IS 1554

The installation process involves:

  1. Site preparation and foundation work
  2. Erection of the high mast structure
  3. Electrical wiring and connection
  4. System testing and commissioning

All technical components must meet Indian Standards and be approved for outdoor municipal lighting applications.

Financial Requirements

The estimated contract value for this project is approximately 3,76,985 INR. The bidder must submit a tender fee of 708 INR and an Earnest Money Deposit (EMD) of 3800 INR. The financial proposal should include a detailed cost breakdown covering materials, labor, transportation, and miscellaneous expenses. Payments will be made in accordance with the progress and certification of work completion.

Cost Component Amount (INR)
Tender Fee 708
EMD 3800
Material & Equipment As per bill of quantities
Labor & Installation As per approved rates
Miscellaneous Contingencies

Payment Schedule:

  • 10% advance upon work commencement
  • 40% after erection and initial testing
  • 50% after successful commissioning and handover

All financial transactions must comply with the terms specified in the tender documents.

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Item Category

Supply,erection and Commissioning

Authority & Contact

Officer Inviting Bids

Deputy Municipal Commissioner

Bid Opening Authority

Deputy Municipal Commissioner

Address

SOUTH ZONE-B (Kanakpur)

Contact Details

6359905030

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

Technical Bid Work No 16.pdf

TENDER_DOCUMENT

Price Bid Work No 16.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

  • ✓ Must have proven experience in executing outdoor lighting infrastructure projects, specifically high mast installations.
  • ✓ Should possess valid technical and financial credentials, including a solvency certificate of minimum 20% of the estimated contract value.
  • ✓ Must have completed similar work within the last 7 years, demonstrating capability in SITC of outdoor lighting systems.
  • ✓ Bidder must submit all relevant certificates, literature, and affidavits as per tender requirements.
  • ✓ The bidder should have a valid GST registration and relevant licenses for electrical and construction work.
Qualification Requirement Details
Experience SITC of outdoor street lighting systems in last 7 years
Solvency Certificate Minimum 20% of estimated tender value, valid for bid period
Financial Stability Turnover exceeding the estimated project cost
Certification Valid electrical contractor licenses
Submission of Documents All certificates, affidavits, and technical literature as specified

Failure to meet any eligibility criterion will result in disqualification from the bidding process.

Bidding Process

Process Timeline

1. Preliminary Stage
2. Commercial Stage

Required Forms

Preliminary

SMC etender 100 per EMD and Tender fee

User Defined Template-Standard

Required

Commercial

Percentage Rate

Library-Secured

Required

Required Documents

Stage - Preliminary Stage

1

Scan Copy of Tender Fee

Required
2

Scan Copy of EMD

Required
3

Scan Copy of all required documents as per tender condition.

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the scope of work for this tender?

The scope involves the supply, erection, testing, and commissioning of a 12-meter high mast with LED luminaires in Umber village, Surat. The contractor must provide all materials such as the high mast pole, LED luminaires, cables, and accessories, and ensure proper installation following safety and technical standards. The work includes site preparation, structural erection, electrical wiring, system testing, and final commissioning. All activities are to be completed on a turnkey basis within 75 days. The contractor is responsible for obtaining permits, licenses, and ensuring compliance with relevant regulations. The project aims to enhance public lighting infrastructure in the designated area, contributing to municipal development goals.

What are the eligibility criteria for bidders?

Bidders must have proven experience in outdoor lighting projects, specifically high mast installations, completed within the last 7 years. They must possess a valid solvency certificate of at least 20% of the estimated project cost, valid for the bid period.

Key points:

  • The bidder should have relevant electrical contractor licenses, GST registration, and demonstrate financial stability through turnover and balance sheets
  • All certificates, affidavits, and technical documents must be submitted as per the tender requirements
  • Failure to meet any criterion will lead to disqualification
  • Bidders should also have the capacity to execute the project within the stipulated timeline and adhere to safety standards.
What technical specifications must the materials meet?

The high mast pole must be approximately 12 meters tall, made from durable, corrosion-resistant materials conforming to IS standards. LED luminaires should be energy-efficient, with a minimum lumen output suitable for street lighting, compliant with IS 16103. Electrical wiring must be outdoor-rated, UV resistant, and conform to IS 1554 standards. The technical parameters include:

Parameter Requirement
Mast Height 12 meters
Material Galvanized steel or equivalent
Luminaire Type LED
Power Rating 150W (typical)
Voltage 230V AC, 50Hz
Cable Specification UV resistant, outdoor rated

Installation involves site preparation, erection, wiring, testing, and commissioning, all adhering to Indian Standards for outdoor municipal lighting.

What is the financial structure and payment schedule?

The estimated project cost is approximately 3,76,985 INR. Bidders must submit a tender fee of 708 INR and an EMD of 3800 INR. The financial proposal should include detailed costs for materials, labor, transportation, and miscellaneous expenses. Payments will be made in phases:

  • 10% advance upon work commencement
  • 40% after erection and initial testing
  • 50% after successful commissioning and handover

All payments are subject to certification of work completion and adherence to quality standards. Bidders should ensure that their financial bids are accurate and comply with the terms specified in the tender documents.

What is the bidding process and key deadlines?

**The bidding process is entirely online, involving the following steps:

1.** Download the tender documents between 23-04-2025 and 12-05-2025.
2. Attend vendor training sessions if needed.
3. Prepare technical and financial bids, ensuring all documents are complete.
4. Submit bids electronically before the deadline of 12-05-2025 at 18:00.
5. Pay the tender fee and EMD online.
6. Technical bid evaluation will occur on 13-05-2025.
7. Final award notification will follow after evaluation.

Key deadlines include:

  • Tender download period: 23-04-2025 to 12-05-2025
  • Bid submission deadline: 12-05-2025 at 18:00
  • Technical bid opening: 13-05-2025 at 11:00
  • Hard copy submission: 22-05-2025
    Ensure all submissions are complete and submitted within the stipulated timelines to participate successfully.