Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Aux Barge Urja San
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 23 Feb
GEMService5 Documents
Category: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - Aux Barge Urja Sanchay;
H065 01 in no split AC Make blue star model Bo3hw18vcu
capacity 1 5 ltr not producing cooling effect view oil leakage
and abnormal noise from co.. , Repair, Maintenance, and
Installation of Plant/ Systems/Equipments (Version 2) - Aux
Barge Urja Sanchay; H066 Bridge chair uprooted and
deteriorated from base and mechanism for seat tilt tension
control seat tilt adjuster not working Defect to be rec.. ,
Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - Aux Barge Urja Sanchay;
H067 Fabrication of 01 no rod rail at bridge for supporting of
QM during at sea while operating steering gear wheel Rod
rail to be fabricated and..
Deadline
2 Mar 2026