Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; E 109
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 3 Apr
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C 412; E 109
Metallic ballast bay tank needs to be fabricated onboard as
per policy in vogue for charging of BASCCA cylinder Material
SS Thickness 10mm Length .. , Repair, Maintenance, and
Installation of Plant/ Systems/Equipments (Version 2) - ICGS
C 412; E 110 Both Shaft protection cover at Engines room
found corroded and deteriorated in various place due to
material ageing needs to be fabricated as per samp..
Deadline
10 Apr 2025