Work involving the heightening of the boundary wall by adding a brick wall atop the existing structure within the Water Tower Campus, located to the east of Phulwari Sharif High School (Ward No. 01)
Organization Not Specified
BIHARPosted 23 Mar
₹13.7 L
EMD: ₹27,500
EPROCURE-BIHAR2 DocumentsOpen
Deadline
5 Apr 2026