Dismantling existing wall,Excavation upto 1.5,Excavation below 1.5,PCC for footing base 1 is to 4 i
Bharat Petroleum Corporation Ltd
KOTA, RAJASTHANPosted 17 Oct
EMD: ₹1.0 L
GEMGoods4 Documents
Category: Dismantling existing wall , Excavation upto 1.5 , Excavation below 1.5 , PCC for footing base 1 is to 4 is to 8 , RCC below plinth footing plus pillar plus beam , RCC above plinth pillar , Brick mason wall av plinth , PCC on top of BW , Plaster 18mm thick , Two coat cement primer , Two coat cement paint , Slogan writing letters 300 mm , Steel Reinforcement for RCC , Concertina fencing removal and refixing , JCB related work , Excavation for drain upto 1.5 , PCC drain , Brick masaonary drain , Plaster 12mm thick
Deadline
27 Oct 2025