Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling , SF6 Insula
Prasar Bharati Broadcasting Corporation Of India
HYDERABAD, TELANGANAPosted 29 Jul
₹65.0 L
EMD: ₹1.3 L
GEMGoods4 Documents
Category: Supply of 11kV 3 phase, 630Amps, Motorized SCADA compatible Monitoring and Controlling , SF6 Insulated Outdoor, totally enclosed, 5Way Ring Main Unit RMU , Insurance, transportation and unloading of RMU at site , Design, fabrication and construction of RCC foundation or plinth for 5Way RMU panels , Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 11kV Feeder structure to RMU panel , Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from Outdoor type RMU to 4 panel HT Switchgear , Laying of 11kV, 3 core, 120 Sqmm XLPE, Aluminium Armoured HT cable from 4 panel HT Switchgear to 500 kVA Transformers 2 Nos. , Supply and fixing of outdoor heat shrinkable end standard make termination kits for 11 kV, 120Sq mm XLPE HT Cable for RMU , Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV, 120Sq mm XLPE HT Cable for HT Switchgear Panel and 500KVA Indoor Transformers 2 Nos. , Supply and fixing of indoor heat shrinkable or end standard make Cable termination kits for 11 kV 120Sq mm XLPE HT Cable 500KVA Indoor Transformers 2 Nos , Supply and Providing conventional type Copper plate earthing system for RMU , Excavation and Laying Copper strip from Earth pit terminal to the 5way RMU and Terminations as per TGSPDCL Hyderabad norms , Testing of High Voltage HT Cables , Provision for cable glands in RMU, and providing cable glands, lugs, ferrules, cable clamps and other termination accessories for HT cables. , System integration, trial run, and commissioning of complete 11kV power supply system including synchronization with existing network , Preparation and submission of as-built drawings, test certificates, O and M Manuals and commissioning reports and Towards charges for submission of RMU drawings to TGSPDCL, Hyderabad , Erection or Installation, testing and commissioning of 5 Way RMU units including obtaining approval from, TGSPDCL ,Hyderabad Central Electricity Authorities. , Tripping battery system complete with trickle charger operating from 230V mains for use with the tripping circuit of above switch board if necessary , Any other material or work necessary to complete the SITC and Approval from CEA and any other Department
Deadline
29 Aug 2026