TenderDekho Logo
Penetrometers state-wide in Gujarat

Penetrometers Tenders in Gujarat

Explore state-wide penetrometers procurement opportunities in Gujarat. Track active bids, eligibility criteria, and deadlines for this state.

Location
Major Buyer
0

Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing

Nuclear Power Corporation Of India Limited

SURAT, GUJARATPosted 9 Jan
EMD: ₹46,600
GEMGoods4 Documents
Category: Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.1 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.2 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.3 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.4 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.5 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.6 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.7 and attach BoQ Specification
Deadline
30 Jan 2025
View Details

Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10

Indian Army

VADODARA, GUJARATPosted 5 May
GEMGoods3 Documents
Category: Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs , Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed upto depth , Following parameters will form part of the Soil investigation report to be submitted by the consultants , A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation , All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation
Deadline
26 May 2025
View Details

Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 06

Indian Army

VADODARA, GUJARATPosted 5 May
GEMGoods3 Documents
Category: Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 06 point 0m or at which further boring is restricted refusal , Material and Labour for Preparing trial pit size 1 point 20 m into x 1 point 20 m 5 point 00m away from BH Both centrally placed upto depth , Following parameters will form part of the Soil investigation report to be submitted by the consultants , A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation , Conducting field california bearing Ratio as per IS 2720 Part31 1995 CBR is the ratio of force per unit area required to penetrate soil mass with a standard circular piston
Deadline
26 May 2025
View Details

Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10

Indian Army

VADODARA, GUJARATPosted 14 May
GEMGoods3 Documents
Category: Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs , Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed upto depth , Following parameters will form part of the Soil investigation report to be submitted by the consultants , A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation , All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation
Deadline
4 Jun 2025
View Details
Chat with us