Up-Gradation of existing infrastructure CC Road, Widening and strengthening of existing asphalt roads, Utility pipes, Water supply distribution & rising main network, RCC Open SWD, Precast SWD, Box Culvert, Paver Block, Street Light & High mast at Gundlav Industrial Estate with five years free maintenance guarantee. (A.I.I. Project - 1)
Superintending Engineer(S.G.), GIDC, Vapi