TenderDekho Logo
Sanitary Pumps state-wide in Andaman & Nicobar

Sanitary Pumps Tenders in Andaman & Nicobar

Access live Sanitary Pumps procurement tenders in Andaman & Nicobar state. Top buyer: Indian Coast Guard. Key locations: South Andamans

Location
Major Buyer
0

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; E042 Mi

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 21 Feb
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; E042 Minor hydraulic oil leakage observed from eight in nos high pressure hydraulic transom flexible hoses of water jet system Requirement exists for fabricat.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; E043 Both sea chest strainers corroded and thinned down resulting in excess accumulation of sea weeds Deteriorated strainers cause insufficient sea water suct.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; E044 Black water leakage observed STP pipe line view pipeline material deteriorated perished Pipeline to be renewed repaired as per sample Inway jobs includes.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; L049 Main broadcast not producing adequate power output from speakers suspect amplifier interface module malfunctioning Defect to be rectified and proved for .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; L050 01 nos portable submersible pump 15 HP 3 phase 50 HZ getting tripped and not getting suction view motor impeller mechanism to be overhauling Pump to be p.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; L051 02 nos CCTV camera at engine room and waterjet compartment and LCD display at work station not working Cameras and LCD monitor to be repaired replace and.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C146; L052 ship electrical siren fog horn not working view power supply and control unit defective same to be repaired replaced and proved for satisfactory operatio..
Deadline
27 Feb 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJVEER; E009

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 3 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJVEER; E009 Emergency air compressor engine not achieving RPM on starting and getting shut down post cranking Defect investigation carried out by SS it is suspect.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJVEER; E010 Sea water leakage observed form AC Condensor sea water pump Defect investigation carried out by SS it is suspected that mechanical seal damage Defect.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJVEER; E002 During post refit trials fuel oil purifier was not developing sufficient pressure Defect investigation carried out by SS suspected feed pump of fuel o..
Deadline
10 Mar 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; L130 D

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 19 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; L130 During PDA operation it was observed that PDA dynamo was unable to provide charging voltage to the starting batteries view suspected dynamo malfunctioni.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; E114 02 in no submersible pumps 10 TPH tripping frequently with insufficient discharge quantity Suspect mechanical seal and winding worn out Mechanical seal .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; E118 The ship is fitted 02 in number sea water collecting tray above both DAs at engine room for protect from sea water Sea water leakage observed from colle.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; H46 Abnormal sound and vibration observed whilst starting Ships diving air compressor Diving air compressor to be overhauled defect to be rectified and prove.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; H55 Stanchion Chain and bottle screwslip perished and broken due to material aging same to be renewed as per sample MatSS Length15 Mtrs Bottle screwslip10; S..
Deadline
26 Mar 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L90 Dom

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 18 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L90 Domestic sea water pump fitted in pump area not getting started On investigation by ships staff suspected that impeller of the same jammed and fault may b.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L91 01 in no loop of ships fire detection system is showing open loop and mains fault in FDS display Defect to be investigated rectified and proved for satisf.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L92 01 in no microwave and 02 in nos refrigerators securing arrangement broken view rough sea and general wear and tear Same to be secured with proper securin.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L93 02 in nos flood light at Qdeck and 02 in nos ay flag deck not working On investigation found that cable from main deck distribution box point of light sho.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L94 02 in nos portable VHF charger not working and securing rack for 08 in nos VHF has been deteriorated and perished view general wear and tear Same to be re.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L96 08 in nos flood lights securing clamps and base at weather deck deteriorated and uprooted Base to be prepared welded Clamps to be fabricated as per sample.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L101 Ships signaling light Morse light not working On investigation found that cable from wheel house junction box to point of light showing open circuit Cabl.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C428; L102 Bridge and fly bridge command control panels LED buttons bulb not working On defect investigation by ships staff found bulb and button switch control car..
Deadline
28 Mar 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; E 3

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 26 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; E 337 Abnormal noise, vibration and inadequate discharge pressure observed from Dirty Oil Pump while operation Suspect impeller and worn out Same to be ov.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; H 422 02 in nos wooden cupboards at NO Cabin deteriorated view fair and wear Same to be renewed as per sample; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; E 341 Coolant leakage observed from Centre DA and Port DA view pin hole in coolant expansion tank and coolant line Same to be renewed repaired as per size.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; L 310 06 ceremonial light sockets deteriorated and damaged due to fair wear and tear Same to be renewed repaired as per size and sample; Service Provider
Deadline
2 Apr 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; E 118

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 10 Apr
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; E 118 Overhaul Diesel driven pump to be undertaken worn out parts to be replaced Diesel driven pump and engine to be scrubbed and one coat of primer and pain.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; E 119 Overhauling of diving air compressor to be undertaken and worn out parts to be replaced Compressor and Engine to be scrubbed one coat of primer and pai.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; E 120 Sea water leakage and salt formation observed in both DA exhaust line In way job includes A Test water injection pipe and nozzle for wear soot and sal.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; L 092 230 V 5 Amp and 15 Amp Dual poll switch socket at various places observed defective broken lead to non operational of socket Renewal repair to be under.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; E 121 Anti rust coating of both shaft from gear box to bulk head area were peeled off antirust coat to be applied on both shaft Length 04 Mtr; Service Provi.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; L 093 01 nos portable submersible pump 15 HP 3 phase 50 HZ getting tripped and not getting suction view motor impeller mechanism to be overhauling Pump to be.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; E 122 Stbd Gear box sea water cooling line A Sea water leakage observed from pin holes of stbd gear box cooler cooling pipe line pipe line to be chemically.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-416; L 094 Ship electrical siren fog horn not working view power supply and control unit defective same to be repaired replaced and proved for satisfactory operat..
Deadline
17 Apr 2025
View Details