Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423; E17 Bot
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 24 Feb
GEMService5 Documents
Category: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C423; E17 Both DAs
alternator safety guard deteriorated and cracked same to
be refabricated as per sample Qty 06 Nos Mat SS; Service
Provider , Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C423; E023 Sea
Water leakage observed from stbd DA Exhaust Pipe View Pin
hole at various place line to be welded and proved for
satisfactory operation Mat SS IN W.. , Repair, Maintenance,
and Installation of Plant/ Systems/Equipments (Version 2) -
ICGS C423; E025 During 12000 Hrly routine of both DA both
DAs turbocharge lagging material was found deteriorated
due to prolonged heat exposure and not fit for reuse l..
Deadline
5 Mar 2026