• Design, supply, and installation of drainage and storm water lines across designated roads in Bopal area.
• Upgrade existing drainage infrastructure to improve water flow and reduce flooding risks.
• Conduct site surveys and prepare detailed technical plans in accordance with municipal standards.
• Use durable materials suitable for urban drainage systems, complying with specified technical specifications.
• Coordinate with local authorities for site access, safety protocols, and environmental compliance.
The process includes:
- Pre-bid meeting and site inspection.
- Submission of technical and financial bids via the official portal.
- Bid evaluation based on technical compliance and cost.
- Contract award to the successful bidder.
- Project execution within the stipulated 12 months period.
| Specification |
Details |
| Project Duration |
12 months |
| Estimated Cost |
INR 90,70,000 |
| Location |
Bopal area, Ahmedabad |
| Key Deliverables |
Drainage lines, storm water upgrade, technical reports |
| Material Standards |
As per municipal and environmental norms |
| Site Inspection |
Mandatory prior to bid submission |
Bidders must ensure all technical and safety standards are met, and submit required documents including technical specifications, registration forms, and bid fees.