• Construction of a new Control Room Extension to support power transmission operations.
• RCC Road construction for improved access and safety around the substations.
• Painting work of the existing control room and associated structures.
• Demolition of existing quarters and overhead water tanks as per project requirements.
• Miscellaneous civil works including site leveling, drainage, and fencing.
• The work must be completed within a 6-month timeframe.
• All construction activities should comply with relevant safety standards and local regulations.
• Bidders must provide detailed project schedules, quality assurance plans, and safety protocols.
• The contractor shall coordinate with GETCO officials for site access and work approvals.
| Item |
Specification |
Remarks |
| Control Room Extension |
RCC structure, 200 sq.m |
As per approved design |
| RCC Road |
3 meters wide, 150 meters long |
For vehicular movement |
| Painting |
Weather-resistant paint, 2 coats |
All structures |
| Demolition |
Quarters & overhead water tank |
As per safety norms |
• The contractor shall submit a detailed Bill of Quantities (BoQ) for approval prior to commencement.
• All materials used must meet the standards specified in the tender documents.
• The contractor is responsible for obtaining necessary permits and approvals.
• Regular progress reports and site inspections are mandatory.
• Final completion must align with the stipulated timeline and quality standards.