The project requires adherence to detailed technical specifications outlined in the Civil Specification PDF, Electrical Specification Booklet, and Building Specification Booklet. Construction must include foundation, structural framework, walls, roofing, flooring, electrical wiring, and plumbing, conforming to the standards specified. The technical parameters include:
| Parameter |
Specification |
| Foundation |
Reinforced concrete, as per drawing |
| Walls |
Masonry with specified materials |
| Roofing |
Suitable roofing system as per specifications |
| Electrical |
Wiring conforming to IS standards |
| Plumbing |
Approved materials and fittings |
Sequential steps include:
- Site preparation.
- Foundation laying.
- Structural framework erection.
- Wall construction.
- Roofing and finishing.
- Electrical and plumbing installation.
- Final inspection and handover.
All work must comply with the detailed specifications provided in the tender documents, available for download.