• Provision of all materials, equipment, and labor necessary for the installation of 250mm diameter RCC NP3 class drainage pipes.
• Removal of existing old drainage pipelines and disposal as per environmental regulations.
• Excavation, bedding, and backfilling of pipe trenches to ensure structural stability.
• Installation of pipes according to approved drawings and specifications.
• Testing of the pipeline for leaks and structural integrity before commissioning.
• Restoration of the surface and surrounding areas post-installation.
The process involves the following steps:
- Site survey and assessment
- Preparation of detailed work plan and procurement of materials
- Execution of excavation and pipe laying
- Pipeline testing and quality checks
- Surface restoration and cleanup
| Specification |
Details |
| Pipe Diameter |
250mm |
| Pipe Material |
RCC NP3 Class |
| Length of pipeline |
As per tender documents |
| Completion Period |
12 months |
All work must comply with local standards, safety regulations, and environmental guidelines.