CONNECTING ROD BRG 15 KAV DG SET,MAIN BRG SET 15 KVA DG SET,HEAD GASKET SET 15 KVA DG SET,CONNECTIN
Indian Army
SRINAGAR, JAMMU & KASHMIR
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) has released a public tender for Power Generator - DG Set (up to 900 KVA) (Q2) in BANGALORE, KARNATAKA. Quantity: 1. Submission Deadline: 24-02-2026 11: 00: 00. Download documents and apply online.
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
Indian Army
JALPAIGURI, WEST BENGAL
Indian Army
PITHORAGARH, UTTARAKHAND
Indian Army
SENAPATI, MANIPUR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Power Generator INSTALLATION CONFIGURATIONS | Power Generator installation configurations as defined in CPWD General Specifications for Electrical works - Part VII (DG Set) | Fixed (Power Generators are permanently installed)" |
| OUTPUT CAPACITY RATING/ PHASE | Nominal Rated Capacity (kVA) | 320 |
| OUTPUT CAPACITY RATING/ PHASE | No of Phase (Single Phase-3-5kVA) (Single Phase or Three Phase-5 & 7-5, 10,15, 20, 25, 30 & 40 kVA) (Three Phase-50 to 900 kVA) | Three Phase |
| ENGINE | Rated Engine Power (kWm) | 100 % of the required powered at STP(Standard Temperature Pressure) i.e equal to (Nominal Rated Capacity (KVA) of power generator + Any Auxilary power Consumption by the Power generator) x Power factor(0.8) / Alternator efficience, 110 % of the required powered at STP(Standard Temperature Pressure) i.e equal to (Nominal Rated Capacity (KVA) of power generator Any Auxilary power Consumption by the Power generator) x Power factor(0.8) / Alternator efficience Or higher |
| ENGINE | Type of Engine cooling | Liquid Cooled |
| ENGINE | Type of governer | Electronic Or higher |
| ENGINE | Rated RPM of Engine (RPM) | 1500 |
| ENGINE | Fuel | High Speed Diesel (HSD) |
| ENGINE | Starting voltage (volt) | 12, 24 |
| ENGINE | Salient Features of Engine | Turbo Charged Engine, Naturally aspirated engine, Direct injection Fuel System, CRDi Fuel System, cold start upto (-20 deg c ), No derating applicable upto 4500 above MSL of altitude at 25 degree celcius, Indirect injection (IDI) Fuel System, Ambient working temperature upto 55 degree celcius. |
| ALTERNATOR | Alternator Voltage Rating | 415.0 |
| ALTERNATOR | Voltage Regulation Grade | VG 3 Or higher |
| CONTROL PANEL | Control Panel | Manual Control Panel |
| CONTROL PANEL | Display meters in the control panel (with appropriate rating and accuracy class ) - inclusive in the scope of supply | Voltmeter, Ammeter, Frequency meter, Power Factor meter, Multifunctional Digital display meter (displaying Voltage, Current, Frequency, Power Factor) |
| CONTROL PANEL | Other devices in the control panel (with appropriate rating) - inclusive in the scope of supply | Required switches and cutout, MCB, MCCB, Contactor, Circuit breaker, Battery charger, remote monitoring over internet with GSM modem. |
| CONTROL PANEL | Indicators | Low Lube oil pressure, High water / coolant / cylinder head temperature, Low fuel level, Over speed |
| CONTROL PANEL | Audio Alarm | Low Lube oil pressure, High water / coolant / cylinder head temperature, Low fuel level, Over speed |
| ACOUSTIC ENCLOSURE | Sheet Thickness(mm) | 1.6, 1.8, 2 Or higher |
| ACOUSTIC ENCLOSURE | Noise level at 1 meter (dB) | 75 |
| Fuel Tank | Fuel Tank Sheet Material Thickness(mm) | 2, 3 Or higher |
| Fuel Tank | Fuel Tank Features | Fuel Tank capacity is sufficient for 8 hrs of running at full load, NA for 990 liter |
| BATTERY | Battery Type & Specification | "Low Maintenance free to IS: 14257 for high cranking performance" |
| SALIENT FEATURES | Salient Features of Power Generator | Glass window on Accoustic Enclosure in front of the Control Panel, Emergency Stop outside the Accoustic Enclosure |
| TRAILER | Trailer | NA for Fixed/Skid Mounted Power Generator |
| TRAILER | Pay load of the Trailer | 0, 500, 1000, 2000 Or higher |
| SCOPE OF INSTALLATION | Installation | with installation - inclusive in the scope of supply Or higher |
| SCOPE OF INSTALLATION | Scope of installation for Diesel Generating Set when offered by the vendor - inclusive in the scope of supply(Part-1) | a) Installation of Power Generator when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Power Generator and its constituent parts shall be generally conforming to CPWD General Specification for Electrical Works, Part - VII - latest. b) Foundation shall be constructed by the seller. Foundation shall be of PCC type with the ratio of 4:2:1. The length and breadth of the foundation shall be 300 mm more from the respective length and breadth of the Power Generator. The height of the foundation shall be 400 mm, i.e., 200 mm below and 200 mm above the ground level. All the materials / labour required for foundation work shall be supplied by the seller. |
| SCOPE OF INSTALLATION | Scope of installation for Diesel Generating Set when offered by the vendor - inclusive in the scope of supply(Part-3) | d) 10 KVA 4C, 6 Sq mm for Three Phase, 15 KVA 4C, 10 Sq mm for Three Phase, 20 & 25 KVA 4C, 16 Sq mm for Three Phase, 30 KVA 3.5C, 25 Sq mm for Three Phase, 40 KVA 3.5C, 35 Sq mm for Three Phase, 50 KVA 3.5C, 70 Sq mm for Three Phase, 62.5 & 75 KVA 3.5C, 95 Sq mm for Three Phase, 82.5 KVA 3.5C, 120 Sq mm for Three Phase, 100 KVA 3.5C, 185 Sq mm for Three Phase, 125 KVA 3.5C, 300 Sq mm for Three Phase, 160 KVA 3.5C, 2 Run of 120 Sq mm for Three Phase, 180 KVA 3.5C, 2 Run of 150 Sq mm for Three Phase, 200 KVA 3.5C, 2 Run of 185 Sq mm for Three Phase, 225 KVA 3.5C, 2 Run of 240 Sq mm for Three Phase, 250 & 275 KVA 3.5C, 3 Run of 185 Sq mm for Three Phase, 320 KVA 3.5C, 3 Run of 240 Sq mm for Three Phase, 380 & 400 KVA 3.5C, 4 Run of 240 Sq mm for Three Phase, 500, 600 & 750 KVA 3.5C, 6 Run of 240 Sq mm for Three Phase, 900 KVA |
| SCOPE OF INSTALLATION | Scope of installation for Diesel Generating Set when offered by the vendor - inclusive in the scope of supply(Part-4) | e) Construction of suitable earthing station and necessary connections shall be done by the seller. All the materials / labour required for construction of earthing station shall be supplied by the seller. The total number of earthing pits/stations shall be 4, i.e., 2 for neutral and 2 for body-earthing. Netutral earthing shall be done with copper Plate and Body earthing shall be done with G.I. plate / Copper. The consignee should choose installation site in such a way that the earthing stations can be made within 10 metres of the Power Generator. Earthing station shall be typically constructed as per prevalent standard practices and shall be generally conforming to CPWD General specification for Electrical Works, Part - VII & Part - I - latest. e) Installation of Fuel Tank including foundation / stand shall be done by the seller. f)The warranty is applicable upto specified value of month/hours whichever occurs first's. |
| SCOPE OF INSTALLATION | Above Scope of installation for Diesel Generating Set when offered by the vendor has been seen, read, understood and agreed to comply | Yes |
| WARRANTY/SERVICES | Warranty on Complete power genertor/DG Set | 12, 24, 36 Or higher |
| WARRANTY/SERVICES | Warranty in running hours | 5000.0 - 5000.0 Or higher |
| WARRANTY/SERVICES | Number of preventive maintenance visits offered in an year during warranty period (Supply of all consumables is the buyer's responsibilty)* | 2 |
| TEST REPORTS | Type of lab which carried out Test of Complete Product to prove the conformity of product as per specification | Certificates required as per CPCB, Govt Lab, NABL accredited lab, NA |
| TEST REPORTS | Test report Available for (Test/approval) | Type Approval Certificate for the specified rating of the Power Generator from any of the designated agency authorized by CPCB, COP Certificate for engine, Type test report and Endurance test report for Engine as per IS: 10001 latest / IS: 10002 latest, Type test report for Alternator as per IS:13364 (Part-1) latest / IS:13364 (Part-2) latest to prove conformity to the specifications |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
N/a
📍 BIJAPUR, CHHATTISGARH
N/a
📍 BIJAPUR, CHHATTISGARH
Indian Institute Of Technology (iit)
📍 INDORE, MADHYA PRADESH
Indian Space Research Organization
Indian Air Force
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS