TenderDekho Logo
GEM

Hindustan Aeronautics Limited Cotton Cleaning Cloth Tender Department of Defence Production India 2026

Bid Publish Date

10-Jul-2026, 8:52 am

Bid End Date

20-Jul-2026, 7:00 pm

Progress

Issue10-Jul-2026, 8:52 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

12000

Bid Type

Two Packet Bid

Tender Overview

Hindustan Aeronautics Limited of the Department of Defence Production invites bids for the Cotton Cleaning Cloth supply. The scope is Goods-only with a staggered, line-wise delivery plan and final inspection at HAL’s site. A sample must be approved prior to bulk supply, and bidders must upload signed compliance of Buyer Specifications. The tender includes an option clause allowing up to 50% quantity variation at contracted rates. GST handling follows actuals with cap at quoted rate, and payment terms vary by MSME status as described in the terms. This purchase targets reliable textile consumables for HAL operations, with strict acceptance via final inspection and adherence to the compliance sheet.

Technical Specifications & Requirements

  • Product: Cotton Cleaning Cloth (noted in tender title under the HAL defence procurement scope)
  • Delivery: Staggered, line-wise delivery with sequence and timing to be followed; sample approval required before bulk supply
  • Inspection: Final inspection at HAL site; no post-inspection deviations accepted
  • Compliance: Bidder must upload signed compliance to Buyer Specifications; non-compliance deemed rejection
  • Advance/Payment: For MSMEs/Start-ups, 15% interest-free advance against BG; balance 85% payment within 30 days of receipt and acceptance; non-advancing MSMEs: 100% payment within 30 days
  • GST: GST on own quotational liability; reimbursement as per actuals or applicable rate (whichever is lower), up to the quoted GST percentage
  • Delivery terms: Option clause may extend delivery time proportional to quantity increase, minimum 30 days; original vs extended delivery calculations apply
  • Scope: Supply of Goods only, no service component; no BOQ items listed
  • Compliance: Vendors must agree to all tender terms; deviation must be explicitly stated otherwise deemed accepted

Terms, Conditions & Eligibility

  • Compliance uploads: Signed and stamped compliance of Buyer Specifications
  • MSME preference: 15% advance against BG for MSMEs/Start-ups; or 100% payment within 30 days for others
  • Inspection policy: Final inspection at HAL site; HAL reserve right to close tender early without notice
  • Delivery: Staggered delivery with line-wise allocation; adherence required
  • Sample: Must be approved before bulk supply
  • GST: Quotation should consider GST; actual GST treatment as per law
  • Documentation: GST invoice and GST portal payment screenshot required on invoice generation
  • Compliance: By submitting bid, bidder agrees to all tender terms unless deviations are clearly stated

Key Specifications

    • Product: Cotton Cleaning Cloth (as tender category: COTTON CLEANING CLOTH)
    • Delivery: Staggered line-wise delivery; timing to be determined per order
    • Sample: Mandatory sample approval prior to bulk supply
    • Inspection: Final inspection at HAL site, no post-inspection review
    • Payment (MSME): 15% advance against BG, 85% on receipt and acceptance within 30 days; non-MSME 100% within 30 days
    • GST: GST as per actuals or applicable rate, whichever lower, within tender-specific cap
    • Compliance: Upload signed compliance of Buyer Specifications; deemed acceptance if not uploaded
    • Scope: Only supply of Goods (no services); no BOQ items listed

Terms & Conditions

  • EMD not specified; GST handling as per actuals with cap on quoted GST

  • Sample approval required before bulk supply and final inspection at HAL site

  • MSME advance terms: 15% BG, 85% within 30 days; non-MSME 100% within 30 days

Important Clauses

Payment Terms

MSME: 15% advance against BG, 85% within 30 days after receipt/acceptance; others: 100% within 30 days after receipt/acceptance

Delivery Schedule

Staggered, line-wise delivery; option clause may extend delivery period proportionally with a minimum 30 days

Penalties/Liquidated Damages

Elastic delivery timelines subject to option clause; HAL reserves right to short close tender without prior notice

Bidder Eligibility

  • Experience in supplying cotton cleaning textiles or similar consumables

  • GST registration and tax compliance

  • Ability to meet staggered delivery and sample-approval requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

COTTON CLEANING CLOTH

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

6000

Delivery Locations

1

Delivery Cities

NASHIK RURAL

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NASHIK RURALNASHIK RURAL---6000-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENTHINDUSTAN AERONAUTICS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9530623.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Ai Airport Services Limited White Cotton Cloth Tender Pune Maharashtra 2026 - 25% Quantity Flexibility & Advance Sample

Ai Airport Services Limited

PUNE, MAHARASHTRA

Posted: 28 April 2026
Closed: 8 May 2026
GEM

Bids are Invited For washing of clothes in JAIPUR, RAJASTHAN

N/A

JAIPUR, RAJASTHAN

Posted: 13 April 2022
Closed: 26 April 2022
EPROCURE

Indian Army Cloth Washing Machinery Tender Dimapur Nagaland ISI/ISO Standards 2025

Indian Army

DIMAPUR, NAGALAND

Posted: 21 October 2025
Closed: 31 October 2025
GEM

Cloth Washer

Indian Army

EAST SIKKIM, SIKKIM

Posted: 3 February 2026
Closed: 13 February 2026
GEM

Indian Army Cloth Washer Tender East Sikkim Cloth Washer Equipment Procurement 2026

Indian Army

EAST SIKKIM, SIKKIM

Posted: 3 February 2026
Closed: 13 February 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates relevant to textile consumables

4

Financial statements (as applicable for tender participation)

5

EMD/Security deposit documentation (if applicable)

6

Technical bid documents and compliance with Buyer Specifications

7

OEM authorizations or supplier approvals (if required by HAL)

8

Signed declaration of acceptance (or deviations clearly stated)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for HAL cotton cleaning cloth tender 2026?

Bidders should register on GeM, prepare GST-compliant invoices, and upload signed compliance with Buyer Specifications. Include sample submission for approval and align delivery with staggered line-wise schedules. Ensure MSME status is declared for advance terms if applicable, otherwise standard 30-day payment applies.

What documents are required for HAL cotton cloth procurement?

Submit GST registration, PAN card, experience certificates in textiles, financial statements, EMD documentation if applicable, technical bid with compliance to Buyer Specifications, and OEM authorizations or supplier approvals as required by HAL terms.

What are the payment terms for MSMEs in HAL tender?

MSME bidders receive 15% advance against BG with the remaining 85% paid within 30 days of receipt and acceptance; if 15% advance is not sought, 100% payment within 30 days of receipt and acceptance applies.

What is required for sample approval in HAL cotton cloth bid?

A formal sample of the cotton cleaning cloth must be submitted and approved before bulk supply. The buyer reserves final authority on the sample; non-approval may lead to bid rejection.

What are the delivery terms for HAL line-wise staggered supply?

Delivery is staggered line-wise with sequence determined by HAL; quantity increases may trigger extended timelines under the option clause, with a minimum of 30 days for any extension.

What GST considerations apply to HAL procurement of cotton cloth?

GST is to be borne by bidders per applicable rates; HAL will reimburse based on actuals or the lower of the quoted GST rate, within the tender terms and GST invoice submission requirements.

What happens if a bidder does not upload compliance to Buyer Specifications?

Failure to upload signed compliance is deemed acceptance of all technical specifications; any deviation may lead to rejection unless deviations are explicitly stated in the bid submission.

What inspection process is required for HAL cotton cloth delivery?

Final inspection is conducted at HAL site; the item is deemed accepted only after successful inspection. HAL reserves the right to short-close the process at any stage prior to PO placement.

Similar Tenders

5 found
Urgent

cleaning item

Indian Army

📍 AHMEDNAGAR, MAHARASHTRA

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Floor Washing Duster,Napkin White,Towel Turkish,Cotton Duster

N/a

📍 MUMBAI, MAHARASHTRA

Est: ₹2.7 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Cement Corporation Of India Limited Shirting & Suiting Cloth Tender 2026 Raymond Make India

Cement Corporation Of India Limited (cci)

📍 KARBI ANGLONG, ASSAM

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Shirting Cloth

Gujarat State Road Transport Corporation

📍 RAJKOT, GUJARAT

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

Procurement Opportunity: Supply of Cleaning Material in SATNA, MADHYA PRADESH

MP Forest Department

📍 SATNA, MADHYA PRADESH

EMD: ₹15,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View EPROCURE