5 STAR 2.0 TR SPLIT TYPE INV AIR CONDITIONER,ACCESSORIES WITH 1.5TR/2.0TR SPLIT AC'S,ERECTION/INSTA
Bhilai Steel Plant
DURG, CHHATTISGARH
Bid Publish Date
25-Jun-2026, 12:46 pm
Bid End Date
06-Jul-2026, 1:00 pm
Value
โน1,80,000
Location
Progress
Quantity
9
Category
2.0TR 5star Split AC
Bid Type
Two Packet Bid
Central Bank Of India announces a tender for 2. 0TR 5star Split AC, 2. 0TON 5star Split AC, 2. 0TONNAGE 5star Split AC, Standard Installation, Standard Accessories in DARJEELING, WEST BENGAL. Quantity: 9. Submission Deadline: 06-07-2026 13: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
2.0TR 5star Split AC , 2.0TON 5star Split AC , 2.0TONNAGE 5star Split AC , Standard Installation , Standard Accessories
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Bhilai Steel Plant
DURG, CHHATTISGARH
Bhilai Steel Plant
DURG, CHHATTISGARH
State Bank Of India (sbi)
LUCKNOW, UTTAR PRADESH
State Bank Of India (sbi)
LUCKNOW, UTTAR PRADESH
State Bank Of India (sbi)
LUCKNOW, UTTAR PRADESH
Tender Results
Loading results...
2.0TR 5star Split AC
Split AC 2.0TR
2.0TON 5star Split AC
Split AC 2.0TON
2.0TONNAGE 5star Split AC
Split AC 2.0TONNAGE
Standard Installation
Installation
Standard Accessories
Accessories
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 2.0TR 5star Split AC | Split AC 2.0TR | 1 | pieces | santosh@1147 | 15 | |
| 2 | 2.0TON 5star Split AC | Split AC 2.0TON | 1 | pieces | santosh@1147 | 15 | |
| 3 | 2.0TONNAGE 5star Split AC | Split AC 2.0TONNAGE | 1 | pieces | santosh@1147 | 15 | |
| 5 | Standard Installation | Installation | 3 | pieces | santosh@1147 | 15 | |
| 6 | Standard Accessories | Accessories | 3 | pieces | santosh@1147 | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Bank Of Baroda
๐ BARDHAMAN, WEST BENGAL
Indian Institute Of Technology (iit)
State Bank Of India (sbi)
๐ VARANASI, UTTAR PRADESH
Nhpc Limited
๐ KATHUA, JAMMU & KASHMIR
N/a
๐ LUCKNOW, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS