TenderDekho Logo
GEM

Indian Army SMPS, UPS, Keyboard & RAM Tender 2026 – IS/IEC Standards, 25% Quantity Flexibility

Bid Publish Date

05-Jun-2026, 10:02 am

Bid End Date

16-Jun-2026, 10:00 am

Location

DARJEELING , WEST BENGAL

Progress

Issue05-Jun-2026, 10:02 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

57

Category

SMPS 8 PIN

Bid Type

Two Packet Bid

Key Highlights

  • Detailed option clause allowing up to 25% quantity variation at contracted rates
  • Scope includes Supply, Installation, Testing and Commissioning (SITC) of ICT hardware
  • Imported products must have India-registered OEM/authorized seller for after-sales service
  • 9 BOQ items across SMPS, UPS, RAM, keyboard-mouse, and monitor categories
  • Delivery extension mechanism based on original and extended delivery periods with minimum 30 days
  • No explicit specifications disclosed; bidders must seek/confirm standards and warranty terms

Categories 4

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement of multiple ICT components including SMPS 8 PIN, UPS 1KVA, UPS BTY 12V 7AH, keyboard with mouse, RAM DDR4 8GB, RAM DDR3 4GB, FUSE 5 AMP, and MONITOR. The scope covers supply, installation, testing and commissioning at an unspecified location, with tentative 9 BOQ items. The bidder must account for possible quantity variations up to 25% of bid quantities and extended delivery windows. An OEM support clause requires India-based after-sales for imported products. The arrangement emphasizes compliant delivery timelines and scalable volumes at contracted rates, without explicit end-user location provided. A distinct evaluation lever is the option clause and after-sales readiness for international OEMs. This tender targets suppliers of ICT hardware and peripherals capable of nationwide support under Indian Army procurement guidelines.

Technical Specifications & Requirements

  • Product categories: SMPS 8 PIN, UPS 1KVA, UPS BTY 12V 7AH, keyboard with mouse, RAM DDR4 8GB, RAM DDR3 4GB, FUSE 5 AMP, MONITOR
  • Delivery scope: Supply, Installation, Testing and Commissioning (SITC)
  • OEM/after-sales: Imported products require an India-registered office for service; submit certificate
  • Variation clause: Quantity may increase up to 25% at bid rates; delivery extension calculations apply with minimum 30 days, per option clause
  • BOQ items: 9 total; individual item specifications not disclosed in data
  • Standards/Compliance: Not specified in tender data; ensure conformity to general govt procurement norms for ICT hardware
  • Contractors' responsibilities: Provide SITC including commissioning at delivery; address serviceability for all listed components
  • Delivery terms: Original delivery period followed by potential extension under option clause; exact dates Not specified
  • Warranty/AMC: Not specified in data; bidders should confirm warranty terms during bid

Terms, Conditions & Eligibility

  • EMD and financials: Not specified in available data; bidders should verify exact EMD requirements
  • Delivery timeline: Delivery period commences after order; extended period governed by option clause with minimum 30 days
  • Payment terms: Not disclosed; bidders should seek clarity on schedule (e.g., advance/milestone payments)
  • Document requirements: GST, PAN, experience certificates, and OEM authorization likely required; confirm with Buyer terms
  • OEM authorization: For imported items, ensure India-based after-sales support via authorized seller; submit certificate
  • Scope: SITC of listed ICT components under Indian Army procurement rules; maintain contract rates for quantity variation
  • Penalties: Not specified; bidders should verify LD/penalty provisions in actual terms

Key Specifications

  • Product categories: SMPS 8 PIN, UPS 1KVA, UPS BTY 12V 7AH, keyboard with mouse, RAM DDR4 8GB, RAM DDR3 4GB, fuse 5 AMP, monitor

  • Scope: Supply, Installation, Testing and Commissioning (SITC)

  • OEM requirement: Imported items must have India-registered office for after-sales service

  • Quantity variation: Up to 25% during order and currency of contract

  • Delivery timing: Calculated extension with minimum 30 days; base period defined by original delivery schedule

Terms & Conditions

  • Delivery quantity may increase up to 25% and delivery period may extend accordingly

  • SITC of ICT hardware with installation and commissioning included

  • Imported items require India-based OEM/authorized seller for service support

Important Clauses

Payment Terms

No explicit payment terms disclosed; bidders should obtain exact schedule from procuring entity and prepare for milestone or advance payments as per contract

Delivery Schedule

Delivery period starts from the last date of original delivery order; extended duration calculated by (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days

Penalties/Liquidated Damages

Penalties/LD details not specified; bidders must confirm LD rates, caps, and applicable conditions in final terms

Bidder Eligibility

  • Experience in SITC of ICT hardware including RAM, UPS, and monitors

  • Ability to supply both domestic and imported items with OEM authorization

  • Compliance with Indian Army procurement practices and post-sales support

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SMPS 8 PIN , UPS 1KVA , UPS BTY 12V 7AH , KEYBOARD WITH MOUSE , RAM DDR4 8GB , RAM DDR3 4GB , SMPS , FUSE 5 AMP , MONITOR

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9424364.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

MONITOR,UPS BTY 12V 7AH,KEY BOARD WITH MOUSE,SMPS,FUSE 5AMP

Indian Army

DARJEELING, WEST BENGAL

Posted: 28 January 2026
Closed: 7 February 2026
GEM

SMPS,UPS BTY 12V 7AH,MONITOR,KEYBOARD WITH MOUSE,RAM DDR III 4GB

Indian Army

DARJEELING, WEST BENGAL

Posted: 22 July 2025
Closed: 1 August 2025
GEM

UPS BTY 12V 7AH,LOGIC CARD,SMPS,KEYBOARD WITH MOUSE,MONITOR 18 INCH

Indian Army

SOUTH WEST DELHI, DELHI

Posted: 18 February 2025
Closed: 11 March 2025
GEM

SMPS 450W,UPS Bty 12V 7AH,Key Board with Mouse,RAM DDR IV 8GB,UPS 1KVA

Indian Army

TAWANG, ARUNACHAL PRADESH

Posted: 17 October 2025
Closed: 27 October 2025
GEM

Indian Army Department Of Military Affairs UPS/Battery, Keyboard with Mouse, SMPS, RAM DDR3 4GB, Printer Gear Tender 2026

Indian Army

DARJEELING, WEST BENGAL

Posted: 2 May 2026
Closed: 12 May 2026
GEM

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

SMPS 8 PIN

SMPS 8 PIN

1 nos Delivery: 15 days
#2

UPS 1KVA

UPS 1KVA

4 nos Delivery: 15 days
#3

UPS BTY 12V 7AH

UPS BTY 12V 7AH

20 nos Delivery: 15 days
#4

KEYBOARD WITH MOUSE

KEYBOARD WITH MOUSE

5 nos Delivery: 15 days
#5

RAM DDR4 8GB

RAM DDR4 8GB

5 nos Delivery: 15 days
#6

RAM DDR3 4GB

RAM DDR3 4GB

5 nos Delivery: 15 days
#7

SMPS

SMPS

3 nos Delivery: 15 days
#8

FUSE 5 AMP

FUSE 5 AMP

10 nos Delivery: 15 days
#9

MONITOR

MONITOR

4 nos Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar SITC ICT projects

4

Financial statements (audited if possible)

5

EMD submission document (as per buyer terms)

6

Technical bid documentation

7

OEM authorization certificate for imported products

8

Certificate of India-based after-sales service for OEMs

Frequently Asked Questions

How to bid for SMPS and UPS tender in Indian Army 2026?

Bidders must submit GST, PAN, and experience certificates, plus OEM authorization for imported items. Ensure SITC scope includes installation and commissioning. Provide proof of India-based after-sales support for OEMs and be prepared for quantity variation up to 25% at contracted rates.

What documents are required for Army ICT hardware tender submission?

Submit GST certificate, PAN, financial statements, experience certificates of similar SITC projects, OEM authorization for imported items, and a bid security/EMD document as specified by the entidade. Technical bid must demonstrate capability for SITC of RAM, UPS, and monitors.

What are the procurement terms for quantity variations in this tender?

The buyer reserves the right to increase quantity up to 25% during contract and delivery period. Calculations use (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

Which items are included under the RAM and monitor categories?

Included items cover RAM DDR4 8GB, RAM DDR3 4GB, keyboard with mouse, and monitor, alongside SMPS 8 PIN, UPS 1KVA, UPS BTY 12V 7AH, and a 5 AMP fuse, all within SITC scope.

What is required for after-sales service of imported items?

Imported products must have an India-registered OEM/authorized seller offering after-sales service; submit a certificate proving presence in India for service and support.

What is the scope of work for the Army bid involving IT hardware?

Scope includes Supply, Installation, Testing and Commissioning of the listed ICT components, with potential for quantity adjustments and extended delivery as per option clause; ensure compliance with standard government procurement norms.

When will the delivery schedule be finalized for this Army tender?

Delivery period begins after the last date of the original delivery order; if the option clause is exercised, the extension is calculated and minimum 30 days, subject to original period and contracted quantities.

What standards or certifications are required for this Army procurement?

Specific standards are not listed in the data; bidders should confirm IS/ISO/compliance requirements during bid submission and ensure RAM, SMPS, and UPS components meet standard govt ICT procurement norms.

Similar Tenders

5 found

Indian Army RAM 8GB DDR4, LED Monitor, I5 Processor, UPS Battery Tender Darjeeling West Bengal 2026

Indian Army

📍 DARJEELING, WEST BENGAL

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

BATTERY 12V 7AH,UPS 600VA,SMPS EP490,SMPS 450WT,DVD WRITER,UPS 1000VA,DDR3 4GB RAM,PRINTER HEAD

Indian Army

📍 SONITPUR, ASSAM

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Indian Army UPS 1KVA SMPS Maintenance Box Lithium Battery 3V DVD Writer Motherboard H410 Arunachal Pradesh Tender 2026

Indian Army

📍 WEST KAMENG, ARUNACHAL PRADESH

Est: ₹35,000
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

MONITOR,SMPS,HDD 256 GB,UPS,BTY 12V 7AH

Indian Army

📍 DARJEELING, WEST BENGAL

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Indian Army Battery & IT Equipment Tender 2026 in India for 12V 7Ah Batteries, UPS 1KVA, 19 inch Monitor, RAM DDR4/DDR3, DVD Writer

Indian Army

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Explore More Opportunities

Quick Access