Custom Bid for Services - NLCIL-BTPS-Erection, Dismantling and Transporting of Cuplock Scaffolding
Nlc India Limited
BIKANER, RAJASTHAN
Bid Publish Date
10-Jun-2026, 5:55 pm
Bid End Date
19-Jun-2026, 12:00 pm
Location
Progress
Quantity
2
Category
Cuplock Scaffold from goose neck to Furnace Roof of Boiler for 500MW power plant
Bid Type
Single Packet Bid
Damodar Valley Corporation invites bids for Cuplock Scaffold materials to support the goose neck to furnace roof sections of a 500MW boiler and additional scaffolding below the goose neck for the boiler. The procurement is positioned in BARDHAMAN, WEST BENGAL and specifies a single-tender, OEM-authorized vendor requirement with potential quantity variations up to 25%. The ATC indicates a need for authorized scaffolding suppliers from the OEM network, with details available in the uploaded bidder documents. The unique scope includes both high-structure scaffolding and below-goose-neck support in a single contract, requiring alignment with the purchaser’s delivery and extension rules. The tender emphasizes formal inquiries to named C&M Department officers and the DSTPS liaison, underscoring a structured, project-specific procurement for an elaborate power-plant scaffolding setup.
Product/service: Cuplock Scaffold for boiler/turbine sections
Quantity: variable up to 25% more/less than bid quantity
Location: Bardhaman, West Bengal
Standards/certifications: OEM-specified and project-specific alignment
Delivery: defined by original delivery period with extension rules
Warranty/AMC: not clearly specified in extract; verify via ATC
Delivery term: extension time formula and minimum 30 days
EMD/financials: exact amounts not disclosed; consult ATC
Bidder eligibility: OEM authorization required; only authorized dealers accepted
Not specified in extract; refer to ATC for advance/progress payments and security deposits
Delivery must commence from the last date of original delivery order; additional time as per option clause with minimum 30 days
Not detailed in extract; check ATC for LD rates and performance penalties
Authorized OEM dealer or BSL Scaffolding Limited with tender-specific authorization
Experience in supplying Cuplock scaffolding for large boiler/turbine installations
Compliance with GST, PAN, and financial statements as per ATC
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Cuplock Scaffold from goose neck to Furnace Roof of Boiler for 500MW power plant , Additional scaffolding below goose neck for Boiler of 500 MW Powerplant
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Nlc India Limited
BIKANER, RAJASTHAN
RRVUN - CMD
GANGANAGAR, RAJASTHAN
N/A
SEONI, MADHYA PRADESH
N/A
KARUR, TAMIL NADU
Madhya Pradesh Power Generating Company Limited
EAST NIMAR, MADHYA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar scaffolding supply
Financial statements (audited) as required by ATC
EMD/Security deposit as specified in ATC (if applicable)
Technical bid documents demonstrating Cuplock scaffold capability
OEM authorization letter or tender-specific authorization for the dealer
Technical drawings/boQ or drawings referenced in ATC
Any other documents specified in the Buyer Uploaded ATC
Extended Deadline
19-Jun-2026, 12:00 pm
Opening Date
19-Jun-2026, 12:30 pm
Key insights about WEST BENGAL tender market
Bidders must be OEM-authorized or an authorized BSL Scaffolding dealer with tender-specific authorization. Prepare GST, PAN, experience certificates, financials, and OEM authorization. Submit technical bid with Cuplock scaffolding capabilities and drawings referenced in ATC, and comply with the 25% quantity variation clause.
Submit GST registration, PAN, audited financial statements, experience certificates for similar projects, EMD/security deposit as per ATC, technical bid documents, OEM authorization, and any required drawings. All documents must align with the Buyer Uploaded ATC instructions.
Delivery starts from the last date of the original delivery order. If quantity increases, extension time = (increased/original) × original period, minimum 30 days. The purchaser may extend this duration up to the original delivery period per the option clause.
Bidders must align with OEM specifications and project requirements; explicit ISI, IS standards are not listed in extract. Ensure compliance with OEM authorization and any specific drawings in ATC; verify by contacting the designated DSTPS/DVC technical officers.
Deadline dates are not provided in the extract. Bidders should refer to the Buyer Uploaded ATC document in the tender portal and contact the nominated C&M and DSTPS officers for exact submission timelines.
The exact EMD amount is not disclosed in the extract. Refer to the ATC and bid pack for the precise EMD/ security deposit requirement and payment mode, along with submission deadlines.
Scope includes Cuplock scaffold from goose neck to furnace roof for a 500MW boiler and additional scaffolding below the goose neck. Requires OEM-authorized supplier with the ability to provide complete scaffold components and related drawings as per ATC.
Confirm eligibility via OEM authorization or authorization from BSL Scaffolding Limited with tender-specific credentials. Ensure ability to supply Cuplock scaffolding per project drawings, and provide GST, PAN, experience, and financial records with the technical bid.
Gujarat State Electricity Corporation Limited (gsecl) Vadodara
📍 SURAT, GUJARAT
Indian Navy
📍 MUMBAI, MAHARASHTRA
Meja Urja Nigamplimited
📍 ALLAHABAD, UTTAR PRADESH
Balmer Lawrie And Company Limited
📍 ANDHRA PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS