Uttar Pradesh Power Corporation Limited Safe Carriage Tender Etah UP 2026 - 8.5/9/11/13 M STP Poles, Cables & Erection Standards

Bid Publish Date

05-Jun-2026, 7:47 pm

Bid End Date

22-Jun-2026, 2:00 pm

Value

₹5,00,000

Progress

Issue05-Jun-2026, 7:47 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5055

Category

Erection of 8.5 M PCC as Single Support

Bid Type

Two Packet Bid

Categories 49

Tender Overview

Uttar Pradesh Power Corporation Limited (uppcl) seeks execution of multiple safety and erection activities across distribution assets in Etah, Uttar Pradesh (207001). The scope includes safe carriage, erection of 8.5 M PCC, 9 M STP, 11/13 M STP single and double sections, stringing of ACSR Weseal GI wire and AB cable, dismantling old material, sagging, straightening, earthing, and related maintenance tasks. The estimated value is ₹5,00,000. The contract covers a broad range of line works, including transformer feed installations and accessory replacements, with a 25% quantity variation option. The absence of explicit technical specs requires bidders to rely on standard field practices and ATC terms for delivery and compliance. This tender targets qualified EPC/line erection contractors in the UP region and emphasizes service support readiness and risk-sharing on variations.

Technical Specifications & Requirements

  • Scope of work includes safe carriage of 8.5 M PCC, 9 M STP, 11/13 M STP, line material handling, and erection as single/double section poles
  • Stringing, sagging, and straightening of HT/LT conductors and cables (AB cable, ACSR Weseal GI wire)
  • Dismantling of old material, replacement of damaged accessories, earthing of PCC RS/J0ist/STP, and rope/guarding tasks
  • No explicit IS/ISO/standard numbers published; ATC implies adherence to standard utility practices
  • Estimated value: ₹5,00,000; EMD not explicitly specified but FDR options are allowed
  • Delivery and installation requirements are tied to option clause terms in the ATC

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25%, with corresponding extension logic for delivery; minimum extra time is 30 days.
  • Financial Standing: Bidder must not be in liquidation or bankruptcy; an undertaking must be uploaded.
  • EMD/PBG: EMD can be submitted via Fixed Deposit Receipt (FDR) in favor of A/C SE EDC Etah; FDR terms specify withdrawal conditions; hardcopy delivery within 5 days of bid end/opening.
  • Service & Support: Bidders or OEMs must provide a dedicated toll-free service number and an Escalation Matrix for support.
  • ATC reference: Please view the attached ATC document for complete terms and conditions.
  • Documentation readiness: GST, PAN, experience credentials, financials, and OEM authorizations are typically required; however, the exact list is defined in the ATC and terms. Ownership transfer and warranty terms follow standard government procurement practices.

Key Specifications

  • Scope: safe carriage and erection of multiple pole heights (8.5 M PCC, 9 M STP, 11/13 M STP) and line material

  • Conductor/Cable work: ACSR Weseal GI wire, AB cable stringing

  • Dismantling and re-sagging tasks for HT/LT lines

  • Earthing of PCC RS/joist/STP and stays/guarding work

  • No explicit standard numbers; rely on ATC for compliance guidance

  • Estimated contract value: ₹5,00,000

  • Delivery terms governed by option clause; minimum extension 30 days

Terms & Conditions

  • Option to modify quantity by ±25% with staged delivery implications

  • FDR-based EMD submission permissible; hardcopy due within 5 days

  • Dedicated service support numbers and escalation matrix required

Important Clauses

Payment Terms

Payment terms are defined in ATC; no fixed percentage disclosed in data; suppliers must refer to attached ATC for exact schedule

Delivery Schedule

Delivery commencement tied to the last date of the original delivery order; extended time calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

LD provisions are not explicitly stated in available data; refer to ATC for penalty structure and performance guarantees

Bidder Eligibility

  • Not in liquidation or bankruptcy; provide undertakings

  • Experience in similar power distribution erection/maintenance projects

  • Adequate financial capacity to support ₹5,00,000 value project and variability up to 25%

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Safe Carriage of 8.5 M PCC Pole , Safe Carriage of 11 and 13 M STP , Safe Carriage of 9 M STP , Safe Carriage of Line Material , Opening Binding Dog Raccon Rabbit Conductor , Opening Binding Weseal Conductor GI Wire , Opening Binding of AB Cable , Erection of 8.5 M PCC as Single Support , Erection of 9 M STP as Single Support , Erection of 11 and 13 M STP as Single Support , Erecton of 8.5 M PCC Double Section Pole , Erecton of 9 M STP Double Section Pole , Laying Stringing Dog Raccon Rabbit , Laying Stringing ACSR Weseal GI Wire , Laying Stringing AB Cable , Straightening of Tilted PCC STP Single Support , Straightening of Tilted Double Pole , Opening of HT LT 25 KVA 63 KVA TF Connection , Opening of HT LT 100 KVA TF Connection , Dismantelling of old Material , Re sagging of HT LT Conductor , Re sagging of AB Cable , Replacement of brocken damaged accessories , Retightening of Stay Rod , Providing and Fixing of Stay Rod , Earthing of PCC RS Joist STP , Carriage of old Material , Mounting of 25 KVA 63 KVA TF , Mounting of 100 KVA TF , Chopping of Tree Branches , Repairing Resagging New Guarding HT Line

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9429516.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Shifting of ACSR Moose Conductor Drum,Safe carriage of Moose Conductor Drum,Safe unloading of Moose

Uttar Pradesh Power Corporation Limited (uppcl)

SULTANPUR, UTTAR PRADESH

Posted: 13 May 2026
Closed: 28 May 2026
GEM

s f of steel tubuler pole 9 5m long complete in all respect 9500 cm stp pole,PVC insulating armoure

N/a

ALIGARH, UTTAR PRADESH

Posted: 20 February 2026
Closed: 7 March 2026
GEM

s f of steel tubuler pole 9 5m long complete in all respect 9500 cm stp pole,PVC insulating armoure

N/a

ALIGARH, UTTAR PRADESH

Posted: 11 March 2026
Closed: 28 March 2026
GEM

Supplyuing Transformer,ITC of transformer,RS Joist H Beam pole,PCC Pole,Erection of steel tubular o

Bharat Sanchar Nigam Limited Portal(bsnl)

PATNA, BIHAR

Posted: 28 April 2025
Closed: 9 May 2025
GEM

UPPCL HT Supply of 11 KV 11 Meter GI Double Pole and Testing AND Commission of 11 KV Disc Insulator

Indian Institute Of Tourism And Travel Management (iittm)

GWALIOR, MADHYA PRADESH

Posted: 12 February 2025
Closed: 5 March 2025
GEM

Bill of Quantities (BOQ) 44 Items Sign in for GEM prices

#1

Safe Carriage of 8.5 M PCC Pole

Safe carriage of 8.5 mtr. long PCC pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends.

130 no Delivery: 30 days
#2

Safe Carriage of 11 and 13 M STP

Safe carriage of 11/13 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends.

6 no Delivery: 30 days
#3

Safe Carriage of 9 M STP

Safe carriage of 9 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends.

2 no Delivery: 30 days
#4

Safe Carriage of Line Material

Safe carriage of line material from store center Etah/nearest substation to pit site in distance range 0 to 60 Km. including loading & unloading at both ends.

15 qtl Delivery: 30 days
#5

Opening Binding Dog Raccon Rabbit Conductor

Opening of binding & removal of Dog/ Raccoon/ Rabbit conductor with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place.

1 km Delivery: 30 days
#6

Opening Binding Weseal Conductor GI Wire

Opening of binding & removal of ACSR weasel conductor/ GI wire with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place.

4 km Delivery: 30 days
#7

Opening Binding of AB Cable

Opening of binding & removal of ABC 3X95+1X35+1X16/3x50mm with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place.

1,500 m Delivery: 30 days
#8

Opening Binding of AB Cable

Opening of binding & removal of ABC 3x120+1x70+1x16 with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place.

1 km Delivery: 30 days
#9

Erection of 8.5 M PCC as Single Support

Erection of 8.5 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes

114 no Delivery: 30 days
#10

Erection of 9 M STP as Single Support

Erection of 9 mtr. STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes

2 no Delivery: 30 days
#11

Erection of 11 and 13 M STP as Single Support

Erection of 11/13 mtr.STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes

4 no Delivery: 30 days
#12

Erecton of 8.5 M PCC Double Section Pole

Erection of 8.5 mtr. long PCC poles as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete.

8 no Delivery: 30 days
#13

Erecton of 9 M STP Double Section Pole

Erection of 11mtr. STP as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete.

1 no Delivery: 30 days
#14

Laying Stringing Dog Raccon Rabbit

Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with Dog/ Raccoon/ Rabbit conductor including binding & nozzling.

1 km Delivery: 30 days
#15

Laying Stringing ACSR Weseal GI Wire

Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ACSR weasel conductor/ GI wire including binding & nozzling.

4 km Delivery: 30 days
#16

Laying Stringing AB Cable

Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x95 mm/3x50 mm. including binding & nozzling.

1,500 m Delivery: 30 days
#17

Laying Stringing AB Cable

Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x120+1x70+1x16 including binding & nozzling.

1 km Delivery: 30 days
#18

Straightening of Tilted PCC STP Single Support

Straightening of tilted PCC poles/STP/Rail single support of HT/LT line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line.

10 no Delivery: 30 days
#19

Straightening of Tilted Double Pole

Straightening of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete.

2 no Delivery: 30 days
#20

Opening of HT LT 25 KVA 63 KVA TF Connection

Opening of HT/LT connections & lowering of 25/63 KVA T/F from D/P/Plinth and shifting up to in safer place.

8 no Delivery: 30 days
#21

Opening of HT LT 100 KVA TF Connection

Opening of HT/LT connections & lowering of 100 KVA T/F from D/P/Plinth and shifting up to in safer place.

3 no Delivery: 30 days
#22

Dismantelling of old Material

Dismanteling of old/damage STP/RS Joist of HT/LT line and carriage to store centre Etah

2 no Delivery: 30 days
#23

Re sagging of HT LT Conductor

Re-sagging of Dog/ Raccoon/ Rabbit conductor loose 33/HT/LT conductor after opening, binding, nozzling etc.

1 km Delivery: 30 days
#24

Re sagging of HT LT Conductor

Re-sagging of ACSR weasel conductor/ GI wire loose 33/HT/LT conductor after opening, binding, nozzling etc.

4 km Delivery: 30 days
#25

Re sagging of AB Cable

Re-sagging of ABC 3X120+1X70+1X16 loose 33/HT/LT cable after opening, binding, nozzling etc.

1 km Delivery: 30 days
#26

Re sagging of AB Cable

Re-sagging of ABC 3x50/3X95 loose 33/HT/LT cable after opening, binding, nozzling etc.

1,500 m Delivery: 30 days
#27

Replacement of brocken damaged accessories

Replacement of 11 KV cross arms V type broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#28

Replacement of brocken damaged accessories

Replacement of 11 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#29

Replacement of brocken damaged accessories

Replacement of 11 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#30

Replacement of brocken damaged accessories

Replacement of 11 KV Disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#31

Replacement of brocken damaged accessories

Replacement of Cross Arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#32

Replacement of brocken damaged accessories

Replacement of F Clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#33

Replacement of brocken damaged accessories

Replacement of LT shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#34

Replacement of brocken damaged accessories

Replacement of 33 KV cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing.

10 no Delivery: 30 days
#35

Replacement of brocken damaged accessories

Replacement of 33 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing.

20 no Delivery: 30 days
#36

Replacement of brocken damaged accessories

Replacement of 33 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing.

10 no Delivery: 30 days
#37

Retightening of Stay Rod

Retightening of Stay rod. Etc. complete.

10 no Delivery: 30 days
#38

Providing and Fixing of Stay Rod

Providing fixing of stay rod with nuzzling etc. complete.

10 no Delivery: 30 days
#39

Earthing of PCC RS Joist STP

Earthing of PCC/RS Joist/STP as per RESPO norms.

10 no Delivery: 30 days
#40

Carriage of old Material

Carriage of old material from pit site to JE store/store center, Etah in distance range 0 to 10 km including loading & unloading and proper stacking.

5 qtl Delivery: 30 days
#41

Mounting of 25 KVA 63 KVA TF

Mounting of 25/63 KVA T/F on double pole/Plinth including making of the connection etc complete.

8 no Delivery: 30 days
#42

Mounting of 100 KVA TF

Mounting of 100 KVA T/F on double pole/Plinth including making of the connection etc complete.

3 no Delivery: 30 days
#43

Chopping of Tree Branches

Chopping of tree branches

2 km Delivery: 30 days
#44

Repairing Resagging New Guarding HT Line

Repairing/ Resagging / new guarding of HT lines with GI wire as per RESPO norms

2 km Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (similar projects in power distribution / line erection)

4

Financial statements or turnover proof for last 3 years

5

EMD submission document (FDR option or online payment receipt)

6

Technical bid documents establishing compliance with scope

7

OEM authorization / authorized dealership certificate (if applicable)

8

Audited balance sheet and solvency certificate

9

Any other documents listed in the tender ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid in the Etah safe carriage tender UP 2026?

Bidders should prepare GST, PAN, and financial documents; submit EMD via FDR or payment; include OEM authorizations if applicable; comply with the ATC terms, especially the 25% quantity variation and delivery time rules, and ensure dedicated service support numbers are provided.

What documents are required for UP PCL line erection tender Etah?

Required documents typically include GST registration, PAN, experience certificates for similar projects, financial statements, EMD submission proof (FDR or online), technical bid documents, and OEM authorizations; refer to the ATC for any project-specific additions.

What are the technical scope items for Etah UP tender 2026?

Scope includes safe carriage and erection of 8.5 M PCC, 9 M STP, 11/13 M STP poles, stringing of ACSR Weseal GI wire and AB cable, dismantling old material, sagging, straightening, earthing, and related accessories installation and maintenance.

What is the estimated value and EMD arrangement for this tender?

Estimated value is ₹5,00,000. EMD can be submitted via Fixed Deposit Receipt in favor of A/C SE EDC Etah, with the hardcopy delivered within 5 days of bid end date; FDR withdrawal conditions must be endorsed on the back.

What is the delivery extension rule for option clause in this tender?

Delivery may be increased or decreased by up to 25%; extension time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; original and extended periods depend on the delivery order specifics.

Which service support requirements must bidders meet for this UP tender?

Bidders or OEMs must provide a dedicated toll-free service number and an Escalation Matrix for service support; ensure availability of prompt technical assistance and a clear contact path for emergencies during contract execution.

What are the key eligibility criteria for UPPCL Etah line works bids?

Eligibility includes not being under liquidation, demonstrating experience in similar line erection/maintenance projects, and sufficient financial capacity to handle ₹5,00,000 project value with potential 25% variation, plus submission of standard bid documents.

Where can I find the exact ATC terms for the Etah tender?

The exact ATC terms are in the attached ATC document referenced by the buyer; bidders should download and review the ATC file to confirm all conditions, penalties, payment terms, and delivery schedules before submission.

Similar Tenders

5 found

Uttar Pradesh Power Corporation Limited Etah Safe Carriage & Erection Works Tender 2026

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

Est: ₹5.0 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Uttar Pradesh Power Corporation Limited Safe Transport & Erection Tender ETAH UP 2026 - IS 550/IS IS Standards Bid

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

Est: ₹5.0 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Safe Carriage of 8.5 M PCC Pole,Safe Carriage of 11 and 13 M STP,Safe Carriage of 9 M STP,Safe Carr

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

Est: ₹5.0 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Safe Carriage of 8.5 M PCC Pole,Safe Carriage of 11 and 13 M STP,Safe Carriage of 9 M STP,Safe Carr

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

Est: ₹5.0 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Safe Carriage of 8.5 M PCC Pole,Safe Carriage of 11 and 13 M STP,Safe Carriage of 9 M STP,Safe Carr

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

Est: ₹5.0 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM