Power Development Department Jammu & Kashmir ISI Marked 3-Phase Distribution Transformer Tender 11 kV 200-2500 KVA 2026
N/a
JAMMU, JAMMU & KASHMIR
Progress
Quantity
3
Category
Distribution Transformer, 3 Phase, 11 kV, >200 KVA upto and Including 2500 KVA ISI Marked To IS 1180 (Part 1)
The Indian Oil Corporation Limited, WRPL unit in Jamnagar, Gujarat, seeks supply of ISI Marked distribution transformers in the 3 Phase, 11 kV system, ranging from >200 KVA up to 2500 KVA, compliant with IS 1180 (Part 1). The procurement is for Jamnagar, Gujarat 360510 and requires ISI certification and BEE energy standards. The contract includes a configurable quantity option up to 25% more or less and delivery terms linked to the original and extended delivery periods. A decisive data-sheet submission and OEM authorization are mandatory to ensure bid matching with technical parameters. The unique selling point is the ISI/IS 1180 compliance coupled with energy efficiency and BEE rating requirements among transformer categories.
Distribution Transformer, 3 Phase, 11 kV design
Rated capacity range: >200 KVA up to 2500 KVA
ISI marked as per IS 1180 (Part 1)
Energy efficiency level and BEE star rating requirements
Nominal HV and LV voltage ratings and standard kVA ratings
Core material specification and winding conductor material
Mounting type specification
Quantity variation up to 25% at contract and during currency
Bidder to provide PAN, GSTIN, cancelled cheque and EFT mandate
OEM authorization required for non-manufacturer bids
GST payable by bidder; reimbursement as actuals or applicable rates; invoicing in consignee name with GSTIN
Delivery period linked to original order; additional time formula: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Not explicitly specified in data; contract allows termination at buyer's discretion; ensure compliance with delivery commitments
Must hold valid GSTIN and PAN
Must provide OEM authorization if bidding through an authorized distributor
Experience in supplying ISI-marked distribution transformers (IS 1180 Part 1) within energy efficiency and BEE rating standards
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Distribution Transformer, 3 Phase, 11 kV, >200 KVA upto and Including 2500 KVA ISI Marked To IS 1180 (Part 1) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
24
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
150
Delivery Locations
1
Delivery Cities
Devbhumi Dwarka
Delivery Pincodes
361010
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pradeep Kumar | 361010,Indian Oil Corp Ltd, Western region Pipelines, Village and PO Vadinar, Dist. Devbhoomi Dwarka Gujarat, 361010 | Devbhumi Dwarka | Gujarat | 361010 | 2 | 150 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
OTHER
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
JAMMU, JAMMU & KASHMIR
N/a
JAMMU, JAMMU & KASHMIR
Eastern Railway
MALDA, WEST BENGAL
East Coast Railway
DANTEWADA, CHHATTISGARH
North Western Railway
Ajmer, RAJASTHAN
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| STANDARDS | Energy efficiency level | 1, 2, 3 |
| STANDARDS | BEE Star Rating | 1, 2, 3, 4, 5 |
| RATINGS | Nominal system voltage, HV (in kV) | 11 |
| RATINGS | Nominal system voltage, LV (in Volt) | 415 |
| RATINGS | Standard ratings (in kVA) | 1250 |
| CONSTRUCTION | Core material | CRGO (as per IS:3024 latest) |
| CONSTRUCTION | Conductor (Winding) material | Copper |
| CONSTRUCTION | Type of Mounting | Ground Mounted |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Cancelled cheque copy
EFT Mandate certified by bank
Data Sheet of offered product
OEM authorization/Manufacturer Authorization
Experience certificates and past project details (if required by policy)
Financial statements or evidence of financial stability
GSTIN certificate
Bidder's vendor code creation documents as applicable
Key insights about GUJARAT tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorization if bidding via distributor. Include the product Data Sheet, ensure IS 1180 Part 1 ISI marks, and provide energy efficiency and BEE rating details. Delivery terms follow 25% quantity variation; ship to consignee in Jamnagar with GSTIN matching.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization, and product Data Sheet. Also provide past experience certificates for similar ISI-marked transformers, financial statements, and GST invoice details. Ensure consistency with IS 1180 Part 1 specifications.
Specifications include distribution transformer 3 phase 11 kV, capacity >200 KVA to 2500 KVA, ISI mark to IS 1180 Part 1, energy efficiency level, BEE star rating, HV/LV nominal voltages, rated kVA, core material, winding conductor material, and mounting type.
Delivery schedule is tied to the original delivery order with a minimum extension rule: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. The buyer may extend up to the original delivery period; ensure readiness to provide data sheet alignment and OEM docs.
EMD amount is not explicitly stated; ensure bidding follows standard contract security. Payment terms hinge on GST calculation at actuals or lower applicable rates; invoicing must be in consignee name with GSTIN; GST impact handled per policy.
Submit Manufacturer Authorization/OEM certificate detailing name, designation, address, email, and phone. This is mandatory when bidding through authorized distributors and must accompany the bid along with the Data Sheet and ISI/IS 1180 conformity evidence.
While explicit warranty terms aren’t stated, ensure compliance with IS 1180 Part 1 and energy standards; penalties may be implied through termination rights if delivery or performance commitments are not met. Confirm warranty terms in final contract and pursue LD/penalty specifics during negotiations.
Upload the Data Sheet of the offered transformer with the bid. The data must align with technical parameters; mismatches may lead to bid rejection. Include IS 1180 Part 1 compliance, BEE rating and energy efficiency details, and the HV/LV voltage ratings.
Hindustan Petroleum Corporation Ltd
📍 VISAKHAPATNAM, ANDHRA PRADESH
East Central Railway
📍 CHANDAULI, UTTAR PRADESH
Indian Institute of Management Indore
📍 INDORE, MADHYA PRADESH
Ajmer VVNL - MD
📍 AJMER, RAJASTHAN
Brahmaputra Valley Fertilizer Corporation Limited (bvfcl)
📍 DIBRUGARH, ASSAM
Sign up now to access all documents
Main Document
OTHER
CATALOG Specification
OTHER
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS