Supply, Installation and commissioning of PDB
Directorate Of Purchase And Stores
Progress
Quantity
14
Bid Type
Two Packet Bid
The opportunity is issued by Indian Oil Corporation Limited for the Supply, Installation, Testing and Commissioning of Power Distribution Boards (PDB). The tender scope covers procurement, on-site installation, testing, and commissioning activities. The response should address overall project feasibility, equipment compatibility with site infrastructure, and seamless integration with IOC power systems. Key differentiators include the full lifecycle scope from supply to commissioning under a single contract and the potential for GST treatment and reimbursement as per applicable rates. Tender specifics such as itemized BOQ and explicit delivery timelines are not provided in the data. This opportunity is positioned as a comprehensive PDB procurement and integration contract under IOC procurement processes.
Power Distribution Board (PDB) supply, installation, testing and commissioning
No BOQ items available in data; exact quantities not listed
No start/end dates provided; delivery timeframe to be defined in ATC
GST treatment to be determined by bidder; reimbursement as per actuals or applicable rates
Bid price to include all cost components (supply, installation, testing, commissioning)
Non-liquidation undertaking required from bidders
GST determination by bidder with potential reimbursement as per rates
ATC document governs detailed terms and conditions
GST to be reimbursed as actuals or as per applicable rates, whichever is lower; no explicit upfront payment terms disclosed
No explicit delivery timeline provided in tender data; to be defined in ATC/PO
Not specified in the data; to be detailed in ATC and contract
Not under liquidation or similar insolvency proceedings
Demonstrated capability for supply, installation, testing and commissioning of PDBs
GST compliant and able to manage GST issues as per IOC terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply, Installation, Testing and commissioning of PDB (Power Distribution Board)
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
26
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
134
Delivery Locations
1
Delivery Cities
Begusarai
Delivery Pincodes
851114
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Alok Kumar | 851114,Barauni Refinery, Begusarai-851114 | Begusarai | Bihar | 851114 | 14 | 134 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Directorate Of Purchase And Stores
N/A
MUMBAI, MAHARASHTRA
N/A
MUMBAI, MAHARASHTRA
N/A
HYDERABAD, TELANGANA
N/A
HYDERABAD, TELANGANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (relevant PDB supply/installations)
Financial statements (as required by IOC terms)
EMD/Security deposit documents (if applicable per ATC)
Technical bid documents (compliance, scope, methodology)
OEM authorizations (if applicable for PDB brands)
UDs or undertakings confirming non-liquidation status
Bidders should prepare GST registration, PAN, experience certificates for PDB projects, financial statements, and EMD as applicable per ATC. Obtain OEM authorizations if required and ensure non-liquidation status. The ATC defines detailed terms; follow IOC procurement processes and submit all required documents via the portal.
Required documents include GST certificate, PAN card, experience certificates for PDB projects, financial statements, EMD documents, technical bid documents, and OEM authorizations. Ensure bid submission aligns with ATC and provides full scope coverage for supply, installation, testing and commissioning.
While no explicit standards are listed, bidders should leverage IS/IEC electrical practice guidelines and ensure compatibility with IOC electrical safety norms. The ATC will specify any mandatory certifications; confirm non-liquidation status and provide validation for GST compliance.
No explicit delivery schedule is provided in the data. The ATC and subsequent contract documents will define milestones. Bidders should anticipate site surveys and staged installation; ensure readiness to coordinate with IOC electrical teams for commissioning.
GST should be determined by the bidder; IOC will reimburse as per actuals or applicable rates, whichever is lower, subject to the quoted GST percentage. Maintain compliance records and attach GST details in the bid to support reimbursement.
Provide undertaking that bidder is not under liquidation or receivership, along with experience certificates for PDB projects, financial statements, and your GST/PAN credentials. Additional ATC-stipulated documents may include OEM authorizations and technical compliance data.
Access and review the ATC document uploaded by the buyer; it contains the exact terms, submission format, and additional documents. Ensure your bid aligns with scope: supply, installation, testing and commissioning of PDBs and any site-specific installation requirements.
Scope includes supply, installation, testing and commissioning of Power Distribution Boards. Bidders must include all cost components in the bid price, comply with non-liquidity undertakings, and adhere to GST and procurement guidelines as per IOC ATC.
Indian Space Research Organization
📍 THIRUVANANTHAPURAM, KERALA
📍 KARNATAKA
Uttar Pradesh Power Corporation Limited (uppcl)
📍 AGRA, UTTAR PRADESH
Indian Air Force
📍 BAREILLY, UTTAR PRADESH
Hll Lifecare Limited
📍 THIRUVANANTHAPURAM, KERALA
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS