Indian Army Clutch/Hydraulic System Parts Tender Gurudaspur Punjab 2026 - ISI/ISO Standards, 25% Quantity Option
Indian Army
GURDASPUR, PUNJAB
Bid Publish Date
10-Feb-2026, 9:39 am
Bid End Date
21-Feb-2026, 10:00 am
Location
Progress
Quantity
42
Category
ACCELATOR CABLE
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for multiple electrical and vehicle components including ACCELERATOR CABLE, BEcon LIGHT 24V, BTY CUT OFF SWITCH, HAND BRAKE ASSEMBLY 4 BY 4, INDICATOR SWITCH TATRA, SWITCH CONTROLLER TATRA, FUEL PIPE 19 BY 19, FUEL PIPE 17 BY 17, SIDE INDICATOR ASSEMBLY, HEAD LAMP ASSEMBLY and ALTERNATOR CONVERTER. Estimated value is not disclosed. The scope covers Supply, Installation, Testing, Commissioning, and Operator Training with statutory clearances as required. A 50% quantity option is available at contract, with delivery timing linked to the original/extended delivery period. Minimum turnover requirements apply for bidders and OEMs, with bid documents including PAN, GST, cancelled cheque, and EFT mandate.
50% quantity option at contract placement and during contract currency
Bidder and OEM must demonstrate three-year turnover compliance
Scope includes supply, installation, testing, commissioning, and operator training
No explicit payment terms provided; bidders must comply with EFT Mandate requirement for bank transfers
Delivery period starts from last date of original delivery order; extended time calculated as (increase in quantity / original quantity) × original delivery period, minimum 30 days
Not specified in available data
Minimum average annual turnover for bidder over last 3 years as specified in bid document
Minimum average annual turnover for OEM of offered product over last 3 years
Ability to supply 11 listed components with scope including installation and training
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
GURDASPUR, PUNJAB
Indian Army
MATHURA, UTTAR PRADESH
Indian Army
GURDASPUR, PUNJAB
Indian Army
KANGRA, HIMACHAL PRADESH
Hqids
GURDASPUR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ACCELATOR CABLE | ACCELATOR CABLE | 4 | nos | moregem | 15 |
| 2 | BECON LIGHT 24V | BECON LIGHT 24V | 6 | nos | moregem | 15 |
| 3 | BTY CUT OFF SWITCH | BTY CUT OFF SWITCH | 4 | nos | moregem | 15 |
| 4 | HAND BRAKE ASSY 4 BY 4 | HAND BRAKE ASSY 4 BY 4 | 2 | nos | moregem | 15 |
| 5 | INDICATOR SWITCH TATRA | INDICATOR SWITCH TATRA | 2 | nos | moregem | 15 |
| 6 | SWITCH CONTROLLER TATRA | SWITCH CONTROLLER TATRA | 4 | nos | moregem | 15 |
| 7 | FUEL PIPE 19 BY 19 | FUEL PIPE 19 BY 19 | 4 | nos | moregem | 15 |
| 8 | FUEL PIPE 17 BY 17 | FUEL PIPE 17 BY 17 | 3 | nos | moregem | 15 |
| 9 | SIDE INDICATOR ASSY | SIDE INDICATOR ASSY | 10 | nos | moregem | 15 |
| 10 | HEAD LAMP ASSY | HEAD LAMP ASSY | 2 | nos | moregem | 15 |
| 11 | ALTERNATOR CONVERTOR | ALTERNATOR CONVERTOR | 1 | nos | moregem | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Audited balance sheets or CA/Cost Accountant turnover certificate
OEM authorization (if bidding for OEM products)
Technical bid documents and compliance certificates (if any)
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN Card, GSTIN, cancelled cheque, EFT Mandate certified by bank, and turnover certificates (audited balance sheets or CA/Cost Accountant certificates) for the last three years to demonstrate financial eligibility and compliance.
The purchaser may increase or decrease the ordered quantity by up to 50% at contract placement and during currency at contracted rates; extension calculations use (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Scope includes Supply, Installation, Testing, Commissioning of 11 listed components, and Operator Training, along with any statutory clearances required for operation.
Both bidders and OEMs must demonstrate minimum average annual turnover for the last three years ending 31st March of the previous year; turnover evidence must be certified Audited Balance Sheets or CA/Cost Accountant certificates.
No explicit IS/ISO standards are listed in the available data; bidders should confirm any OEM-specific certifications and ensure compliance with the stated turnover criteria and EFT documentation.
Delivery timing correlates to the original delivery order; if the option clause is exercised, additional time is calculated per the formula with a minimum of 30 days.
Prepare PAN, GSTIN, cancelled cheque, EFT Mandate, turnover certificates, and any OEM authorizations; ensure submission aligns with Buyer Added Terms for vendor code creation and eligibility requirements.
Register as a bidder, compile financial and technical bid packages, include turnover proofs, GST/PAN, bank EFT mandate, and OEM authorizations; ensure all 11 listed components are covered under the scope and training requirements are met.
Central Coalfields Limited
📍 HAZARIBAG, JHARKHAND
Indian Army
📍 JALANDHAR, PUNJAB
Indian Army
📍 JALANDHAR, PUNJAB
Indian Army
📍 KOTA, RAJASTHAN
Indian Army
📍 BARDHAMAN, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS