Tender Overview
The Uttar Pradesh Cooperative Sugar Factories Federation Limited seeks bids for an integrated web-based sugar bag counter system with HMI and local data logging, plus integrated time-based power control interlocking for sugar bin weighment and bag counting. The estimated contract value is ₹3,665,000 with an EMD of ₹25,000. Location is Uttar Pradesh, India, and the project scope centers on a unified hardware-software solution to automate weighment, bag counting, and power interlocking for sugar handling. The purchaser reserves flexible quantity adjustments up to ±25% during and after award, with delivery timelines tied to the original delivery period and adjustments calculated by a defined formula. The lack of BOQ items suggests a broad system integration procurement rather than a single equipment purchase. Key differentiators include a web-based interface, HMI, local data logging, and time-based interlocking designed for sugar bin operations. This tender emphasizes scalable deployment within UP’s sugar manufacturing ecosystem and long-term contract potential under option clauses.
Technical Specifications & Requirements
- Product/service: Integrated web-based sugar bag counter system with HMI, local data logging, and time-based power interlocking for sugar bin weighment and bag counting.
- Estimated value: ₹3,665,000; EMD: ₹25,000.
- Delivery/installation scope: Not explicitly detailed; option clause allows quantity adjustments up to 25% of bid/contracted quantity.
- Standards/quality: Specific standards not listed; emphasis on system integration, data logging, and interlocking features.
- Experience: Not specified; likely require mechanical-electrical integration expertise and software development for HMI and data logging.
- Location: Uttar Pradesh, India; procurement by UP government body.
Terms, Conditions & Eligibility
- EMD: ₹25,000 (mode not specified in data).
- Quantity: Purchaser may adjust up to ±25% of bid/contract quantity; extended delivery periods governed by a defined calculation.
- Delivery timeline: Based on original delivery period; extended period adjusted by option clause with minimum 30 days rule.
- Documents: Not enumerated in data; bidders should prepare standard bid documents, G.S.T., PAN, and technical compliance evidence.
- Payment terms: Not specified; typical government tenders require milestone or post-delivery payment conditions upon acceptance.