Indian Army Department Of Military Affairs 31-Item Spare Parts Tender JAMMU 2026 24V Components & Accessories
Indian Army
JAMMU, JAMMU & KASHMIR
The opportunity is issued by the Indian Army, Department Of Military Affairs, for a procurement package including Fan Belt, AC Belt, Bush, Cabin Shock, Pinion, Brush Carrier Plate, Gear Box Nut, Gear Box Lock, Bush Set, Distributor Assembly, Self Starter and related components, located in Faridkot, Punjab. The tender comprises 12 BOQ items with undefined quantities and no stated estimated value or EMD. The buyer reserves a 25% quantity variation at contract award and during the currency, at contracted rates. The delivery timeline is linked to original orders and extended accordingly, with minimum 30 days extension. This is a multi-item military spares bundle requiring precise supplier capability to meet military-grade component standards.
Key differentiator includes the option to adjust quantity up to 25% and the extended delivery mechanism based on the original delivery period. The tender emphasises adherence to the procurement policy of the Indian Army and the ability to scale deliveries without compromising schedule integrity.
Product/service names and categories: Fan Belt, AC Belt, Bush, Cabin Shocket, Pinion, Brush Carrier Plate, Gear Box Nut, Gear Box Lock, Bush Set, Distributor Assembly, Self Starter
Quantities: Not specified in BOQ; 12 items listed with N/A quantities
Estimated value/EMD: Not disclosed in tender text
Experience requirements: Not explicitly stated; bidders should demonstrate capability to supply multiple military spare parts
Quality/standards: No specific IS/ISO/IS standard numbers provided
Delivery/installation: Delivery commencement tied to last date of original delivery order; extended time calculation formula provided
Quantity flexibility up to 25% at contract payment and during currency
Delivery period adjustments governed by original vs extended timelines with minimum 30 days
12-item spare parts bundle with no item-wise quantities disclosed
Payment terms are not detailed in the provided terms; bidders should await further instruction from buyer or rely on standard government procurement payment practice
Delivery starts from the last date of the original delivery order; additional time computed as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum 30 days
No LD information provided in the data; bidders should confirm LD terms during bid submission
Demonstrated experience in supplying military spare parts or related mechanical components
Ability to scale production and shipments to accommodate up to 25% quantity variation
Compliance with Indian Army procurement processes and security classifications
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
MURSHIDABAD, WEST BENGAL
Indian Army
SONITPUR, ASSAM
Indian Army
BATHINDA, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Fan Belt | HMV TATA | 1 | nos | subrata@818 | 15 |
| 2 | AC Belt | HMV TATA | 1 | nos | subrata@818 | 15 |
| 3 | Bush | TATA | 2 | nos | subrata@818 | 15 |
| 4 | Cabin Shocket | STLN | 2 | nos | subrata@818 | 15 |
| 5 | Pinion | STLN | 1 | nos | subrata@818 | 15 |
| 6 | Brush Carrier Plate | TATA | 1 | nos | subrata@818 | 15 |
| 7 | Gear Box Nut | STLN | 1 | nos | subrata@818 | 15 |
| 8 | Gear Box Lock | STLN | 1 | nos | subrata@818 | 15 |
| 9 | Bush Set | TATA | 2 | nos | subrata@818 | 15 |
| 10 | Pinion | TATA | 1 | nos | subrata@818 | 15 |
| 11 | Distributor Assy | STLN | 1 | nos | subrata@818 | 15 |
| 12 | Self Starter | TATA | 1 | nos | subrata@818 | 15 |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates for similar military spare parts supply
Financial Statements / Turnover evidence
EMD submission proof (amount not specified in data; prepare as per tender guidance)
Technical bid documents demonstrating capability for 12-item spare parts bundle
OEM Authorization (where applicable)
Dealer/Distributor licenses (if required by local regulations)
Any prior contract performance certificates
Company Profile and Authorized Signatory details
Key insights about PUNJAB tender market
Bidders must submit GST registration, PAN, experience certificates, and financial statements, plus OEM authorizations where required. The 12-item spare parts bundle includes belts, bushs, and distributors; quantity flexibility up to 25% applies. Ensure you can scale production and meet original delivery timelines with extensions as described.
Required documents include GST certificate, PAN card, experience certificates in military parts supply, financial statements, EMD submission proof, technical bid, OEM authorization, and dealer licenses. Prepare performance certificates for prior contracts and company profile with authorized signatory details.
No item-wise technical specifications are provided; bidders should demonstrate capability to supply 12 listed components. Ensure compliance with military-grade quality controls and provide documentation proving compatibility of belts, bush, distributor assemblies, and self starters with standard vehicle platforms.
Delivery periods start from the last date of the original delivery order, with possible extensions. If quantity increases, the extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days. Confirm exact dates in the final contract schedule.
Eligibility includes demonstrated experience, capability to scale supply by up to 25%, and compliance with Indian Army procurement processes. Submit relevant experience in military parts, financial stability documentation, GST, PAN, and OEM authorizations for machines in the 12-item bundle.
EMD amount is not specified in the current data; bidders should verify at bid submission. Payment terms are not explicit in the provided terms; bidders should await purchaser guidance and align with standard government procurement payment practices, ensuring compliance with delivery milestones.
The purchaser may increase or decrease bid quantity up to 25% at contract placement and during currency. Additional time must be calculated using the stated formula with a minimum of 30 days. Ensure capacity to ramp production without impacting delivery deadlines.
The bundle covers belts (Fan Belt, AC Belt), mechanical components (Bush, Pinion, Gear Box Nut/Lock, Bush Set), Carrier Plate, Distributor Assembly, Self Starter, and Cabin Shocket. Suppliers should maintain compatibility and traceability for all 12 listed items.
Indian Army
📍 FARIDKOT, PUNJAB
Indian Army
📍 FARIDKOT, PUNJAB
Indian Army
📍 AMBALA, HARYANA
Indian Army
📍 MATHURA, UTTAR PRADESH
Indian Army
📍 BANGALORE, KARNATAKA
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS