TenderDekho Logo
GEM

Mineral Exploration And Consultancy Limited Rubber & Packing Goods Tender India 2025

Bid Publish Date

15-Nov-2025, 12:40 pm

Bid End Date

28-Nov-2025, 1:00 pm

Latest Corrigendum Available

Progress

Issue15-Nov-2025, 12:40 pm
Corrigendum25-Nov-2025
AwardPending
Explore all 3 tabs to view complete tender details

Quantity

2905

Categories 21

Tender Overview

Mineral Exploration And Consultancy Limited invites bids for the supply of assorted packing products including rubber bucket, piston rod packing, valve insert packing, valve cover packing, flange cover packing, liner packing, 72 teeth clutch segment and water swivel packing. The scope is limited to the supply of goods with a potential 25% quantity variation during contract execution. The tender contemplates an MSE purchase preference and requires bidders to meet financial and corporate governance criteria. The procurement emphasizes structured delivery terms linked to order dates with option-based extensions. This is a goods-only procurement with multiple packing categories targeting equipment maintenance or assembly lines.

  • Organization: Mineral Exploration And Consultancy Limited
  • Product Scope: Rubber bucket, piston rod packing, valve inserts and covers, flange and liner packings, clutch segments, water swivel packing
  • Delivery & Quantity: Flexible up to 25% quantity expansion; delivery timelines anchored to original delivery period
  • Funding & Eligibility: MSE preference; bidder to demonstrate ethical financial standing and compliance
  • Bid Conditions: Advance sampling post award; certificates required; scope of supply includes all cost components
  • Location: Tender appears to be national; exact geographic location not disclosed

Technical Specifications & Requirements

  • No technical specifications are provided in the BOQ; range includes 16 items of packing materials with unspecified quantities
  • Term clauses govern quantity variation, delivery period, and extension logic: (Extended time = ( Increased quantity / Original quantity ) × Original delivery period), minimum 30 days
  • Purchase preference applies to MSEs if bidder is a manufacturer of the offered product; traders excluded; L-1 can be matched by MSEs within defined margins
  • Mandatory certificates: PAN, GSTIN, canceled cheque, EFT mandate; bid submission must include these
  • Scope of supply: “Only supply of Goods”; advance sampling post-award clause is implied
  • No explicit standards (IS/ISO) or performance metrics specified; delivery terms rely on contractual interpretation

Terms, Conditions & Eligibility

  • 25% quantity variation allowed during contract placement and currency; delivery period adjustments governed by option clause
  • Bidder must not be in liquidation or bankruptcy; must upload a financial undertaking
  • Documentation for Vendor Code creation includes PAN, GSTIN, Cancelled Cheque, EFT mandate
  • Purchase preference for MSEs defined; bidder must be manufacturer to avail benefits; traders excluded
  • Certificates and compliance documents required; rejection possible if missing
  • Scope of supply indicates goods-only procurement; advance sampling post award is implied
  • Notably, EMD/amount not disclosed in the available data; start/end dates not provided

Key Specifications

  • Product names: rubber bucket, piston rod packing, valve insert packing, valve cover packing, flange cover packing, liner packing, 72 teeth clutch segment, water swivel packing

  • Scope: supply of goods only; no installation included

  • Delivery terms: extension calculations based on (increased/original) × original delivery period with a minimum of 30 days

  • Eligibility: manufacturer status required for MSE preference; traders excluded

  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate to be submitted

Terms & Conditions

  • Key Term 1: Quantity variation up to 25% during contract and currency

  • Key Term 2: MSE purchase preference available to eligible manufacturers

  • Key Term 3: Documentation includes PAN, GSTIN, cancelled cheque, EFT mandate

Important Clauses

Payment Terms

Not specified in available data; standard practices imply advance sampling post award with supply-on-delivery remuneration

Delivery Schedule

Delivery period linked to original delivery order; extensions based on option clause with minimum 30 days

Penalties/Liquidated Damages

Not specified in provided terms; penalties likely governed by standard contract terms and IS/OMB policies

Bidder Eligibility

  • Not under liquidation or court receivership

  • Manufacturer status to avail MSE purchase preference

  • Submit PAN, GSTIN, Cancelled Cheque, EFT mandate

Documents 5

GeM-Bidding-8593302.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Ring Sealing LUB,Gland Packing,Set Scapper Ring,Feed Pump Assemble,Valve Check,,Valve service kit E

Hindustan Petroleum Corporation Ltd

JHAJJAR, HARYANA

Posted: 11 September 2025
Closed: 25 September 2025
GEM

Indian Army Packing Kit and Engine Components Tender Ranchi Jharkhand 2025

Indian Army

RANCHI, JHARKHAND

Posted: 10 December 2025
Closed: 20 December 2025
GEM

SHAFT,Bolt Machine,GASKET,SIDE BLOCK,SEAL AND SPRING SET,PACKING RING,RING PACKING,BOLT,SEDIMENTAL

Indian Army

LEH, JAMMU & KASHMIR

Posted: 4 September 2025
Closed: 15 September 2025
GEM

Piston Assy,Piston Ring,Connecting Ring Bearing,Main Bearing,Oil Seal,Thrust Packing Kit,Complete P

Indian Army

BUDGAM, JAMMU & KASHMIR

Posted: 14 September 2025
Closed: 24 September 2025
GEM

PISTON RING SET,STARTER MOTOR ARMATURE,PISTON ASSEMBLY,CONNECTING ROD,ROTOR ASSY,PISTON LINER ASSY,

Indian Army

KUPWARA, JAMMU & KASHMIR

Posted: 14 June 2025
Closed: 8 July 2025
GEM

Bill of Quantities (BOQ) 16 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Rubber Bucket 5 Inch for Mud Pump mounted on John Infra DR-1500 Drill rig &Durga DR-1500 Drill Rig. 250 pieces pmbaghewala 15
2 Rubber Bucket 5.25 Inch for Mud Pump mounted on John Infra DR-1500 Drill rig &Durga DR-1500 Drill Rig. 100 pieces pmbaghewala 15
3 Rubber Bucket 4.5 Inch for Mud Pump mounted on John Infra DR-1500 Drill rig &Durga DR-1500 Drill Rig. 40 pieces pmbaghewala 15
4 Rubber Bucket 4.85 Inch for Mud Pump mounted on John Infra DR-1500 Drill rig &Durga Tractor DR-1500 Drill Rig. 250 pieces pmbaghewala 15
5 Piston Rod Packing Piston Rod Packing for GPS-150 Mud Pump mounted on Durga DR-1500 Drill rig 400 pieces pmbaghewala 15
6 Piston Rod Packing Piston Rod Packing for S-150 Mud Pump mounted on Jhon Infra DR-1500 Drill rig 600 pieces pmbaghewala 15
7 Valve Insert Valve Insert for GPS-150 Mud Pump mounted on Durga DR-1500 Drill rig 160 pieces pmbaghewala 15
8 Valve Insert Valve Insert for S-150 Mud Pump mounted on Jhon Infra DR-1500 Drill rig 400 pieces pmbaghewala 15
9 Valve Cover packing Valve Cover packing for GPS-150 Mud Pump mounted on Durga DR-1500 Drill rig 100 pieces pmbaghewala 15
10 Valve Cover packing Valve Cover packing for S-150 Mud Pump mounted on Jhon Infra DR-1500 Drill rig 150 pieces pmbaghewala 15
11 Flange cover Packing Flange cover Packing for GPS-150 Mud Pump mounted on Durga DR-1500 Drill rig 20 pieces pmbaghewala 15
12 Flange cover Packing Flange cover Packing S-150 Mud Pump mounted on Jhon Infra DR-1500 Drill rig 30 pieces pmbaghewala 15
13 Liner Packing Liner Packing GPS-150 Mud Pump mounted on Durga DR-1500 Drill rig 20 pieces pmbaghewala 15
14 Liner Packing Liner Packing S-150 Mud Pump mounted on Jhon Infra DR-1500 Drill rig 25 pieces pmbaghewala 15
15 72 Teeth Clutch Segment 72 Teeth Clutcg Segment 10 pieces pmbaghewala 15
16 Water Swivel Packing Water Swivel Packing For Durga DR-1500 Drill rig & Jhon Infra DR-1500 Drill rig 350 pieces pmbaghewala 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card copy

3

Cancelled cheque

4

EFT Mandate certified by bank

5

Proof of financial standing (undertaking to avoid liquidation/bankruptcy)

6

OEM authorization or proof of being manufacturer

7

Certificate of incorporation and business details

8

Any required bid-specific certificates as per ATC/Corrigendum

Corrigendum Updates

1 Update
#1

Update

25-Nov-2025

Extended Deadline

28-Nov-2025, 1:00 pm

Opening Date

28-Nov-2025, 1:30 pm

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for rubber packing tender in India 2025?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid; demonstrate financial standing, and be manufacturer to avail MSE preferences. The scope covers supply of goods only, with option for 25% quantity increase. Ensure documentation meets ATC requirements and provide OEM authorizations if applicable.

What documents are required for MSE preference eligibility in packing tender?

To qualify for MSE preference, bidders must prove manufacturer status of the offered product and submit GSTIN, PAN, cancelled cheque, EFT mandate, and relevant turnover/certificates. Traders cannot claim MSE benefits; provide evidence of manufacturing capability and compliance.

Which items are included under the packing procurement from Mineral Exploration?

The procurement includes rubber bucket, piston rod packing, valve insert packing, valve cover packing, flange cover packing, liner packing, 72 teeth clutch segment, and water swivel packing. All are supplied as goods with no installation services; quantities may vary by up to 25%.

What are the delivery extension rules for quantity variations in this tender?

Delivery time extensions are calculated as (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend the delivery period up to the original delivery period if required.

What standards or certifications are explicitly required for this packing tender?

No explicit IS/ISO standards are listed in the available data. Required certifications focus on GSTIN, PAN, EFT mandate, and manufacturer proof for MSE preference; ensure OEM authorization if applicable.

What is the scope of supply for this tender in packaging materials?

Scope is limited to supply of goods only; no installation or service components are included. The bid price must cover all cost components for the listed packing items.

When is compliance documentation due for the packing materials bid in India?

Documents required include PAN, GSTIN, cancelled cheque, EFT mandate; financial standing undertaking; OEM authorization if applicable. Ensure submission with the bid to avoid rejection due to missing certificates per ATC.

Similar Tenders

2 found
Urgent

Indian Army Department of Military Affairs Engine Parts Tender GWALIOR Madhya Pradesh 2026 - Head Valve & Piston Assembly Procurement

Indian Army

📍 GWALIOR, MADHYA PRADESH

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

PISTON ASSY,HEAD GASKET,CYLINDER LINNER,PISTON RING SET,AVR,CONNECTING ROD BEARING,VALVE SPRING KIT

Indian Army

📍 KAMRUP, ASSAM

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM