CAPACITOR CAP -1
Indian Air Force
GHAZIABAD, UTTAR PRADESH
Bid Publish Date
12-Jul-2026, 1:37 pm
Bid End Date
27-Jul-2026, 2:00 pm
Location
Progress
Quantity
9
Bid Type
Two Packet Bid
Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for Capacitor Standard procurement at Shahjahanpur, Uttar Pradesh 242001. The tender document does not disclose an estimated value or EMD amount. The scope centers on standard capacitors under the listed category, with potential quantity adjustments. Unique tender nuance includes an option clause allowing up to 25% quantity variation at contracted rates and a delivery timeline aligned to the original delivery period, with time recalculation rules for extended orders. This procurement briefing highlights the location-specific and category-specific requirements for bidders.
Capacitor Standard: basic procurement category
Quantity variation up to 25% of bid quantity
Delivery period adjustments: (Additional quantity / Original quantity) × Original delivery period, minimum 30 days
Delivery timeline may extend within contract terms
No BOQ items; no explicit technical specs provided
Option clause allows +/-25% quantity change at contracted rates
Delivery period recalculation uses proportional formula with 30-day minimum
EMD and detailed payment terms are not disclosed in the data
Not specified in tender data; bidders should verify during bid submission
Delivery starts from the last date of original delivery order; extended time follows calculated formula with minimum 30 days
Not specified in the provided terms; bidders should seek clarification during bid process
Experience in supplying capacitor-related components or electrical procurement
Ability to scale quantities within a 25% range under contract
Compliance with local procurement regulations and standard industry practices
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Capacitor Standard
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Shahjahanpur
Delivery Pincodes
242401
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kamlesh Kumar Srivastava | 242401,Kisan Sahakari chini mill ltd, POWAYAN DISTRICT SHAHJAHANPUR GST NO 09AAAAK1635N1ZG | Shahjahanpur | Uttar Pradesh | 242401 | 9 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
GHAZIABAD, UTTAR PRADESH
Nmdc Steel Limited
BASTAR, CHHATTISGARH
Indian Air Force
SOUTH DELHI, DELHI
N/A
BENGALURU URBAN, KARNATAKA
N/A
BENGALURU URBAN, KARNATAKA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates (relevant capacitor procurement/parts)
Financial statements
EMD/Security deposit documentation (if applicable)
Technical bid documents
OEM authorizations or certifications (if required by bidder)
Any existing ISI/ISO/certifications applicable to capacitors (if provided in terms)
Project-specific compliance documents (if issued)
Key insights about UTTAR PRADESH tender market
To bid, verify eligibility with experience in capacitor supply, submit GSTIN, PAN, financial statements, and EMD (if applicable). Ensure OEM authorizations and technical bids are attached. Review delivery terms tied to the 25% quantity option and confirm compliance with the proportional delivery period calculation.
Required documents include GST certificate, PAN, experience certificates for capacitor-related supply, financial statements, EMD documentation, technical bid, and OEM authorizations. Ensure any ISI/ISO certifications are included if provided by the tender terms.
Delivery starts after the last date of the original delivery order. If quantity increases or decreases by up to 25%, the extended delivery period is calculated as (Additional quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders should demonstrate prior capacitor procurement experience, financial stability through statements, and the ability to scale quantity up to 25% of bid quantity. Ensure GST/PAN compliance and OEM authorizations as applicable to the capacitor category.
Payment terms are not specified in the provided data. Bidders should confirm payment schedules during bid clarification. Prepare for standard procurement practices and ensure all required documents are ready for verification.
The option allows a bid quantity change up to 25% at contracted rates. Delivery timing adjusts with the formula (Additional quantity / Original quantity) × Original delivery period, keeping a minimum 30 days. Bidders must plan scalable production and logistics accordingly.
The tender data does not specify standards. Bidders should prepare existing capacitor industry certifications (OEM certifications, ISI/ISO where applicable) and documentation demonstrating compliance with general capacitor quality norms.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 ALIGARH, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Bharat Heavy Electricals Limited
📍 BENGALURU URBAN, KARNATAKA
Bharat Heavy Electricals Limited
📍 BENGALURU URBAN, KARNATAKA
Bharat Heavy Electricals Limited
📍 BENGALURU URBAN, KARNATAKA
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS