Indian Army Department Of Military Affairs Excavation and Foundation Works Tender Nainital Uttarakhand 2026

Bid Publish Date

06-Oct-2026, 2:07 pm

Bid End Date

20-Oct-2026, 9:00 am

Progress

Issue06-Oct-2026, 2:07 pm
AwardPending

Key Highlights

  • • Brand/OEM requirements: Not specified in tender data
  • • Technical certifications/standards: Not specified in tender data
  • • Special clauses: 25% quantity variation right; extended delivery time formula (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
  • • Eligibility criteria: Not specified in tender data

Tender Overview

The Indian Army (Department of Military Affairs) invites bids for a multi-discipline works package located in NAINITAL, UTTARAKHAND. Scope covers excavation and foundation work, brick masonry, MS structural framing, roof trusses, MS purlins, CGI roofing, ceiling fans, LED tube lights, electrical wiring and distribution. The BOQ lists 11 items but provides no unit quantities or values. An option clause allows up to 25% quantity variation at contracted rates, with delivery time adjustments based on the original schedule and the extended period. This procurement targets capable contractors with exposure to integrated civil and electrical installations under defense-sector norms and timely delivery obligations. The tender emphasizes adherence to delivery cycles and contractual flexibility around quantity fluctuations, making supplier readiness and risk planning essential.

Technical Specifications & Requirements

  • No explicit product specifications are published in the tender text. The procurement category encompasses: - Excavation and Foundation Work, Foundation Masonry, Brick Masonry, Brick Pillars, MS Structural Framework, Roof Trusses, MS Purlin, CGI Roofing Sheet Work, Ceiling Fans, LED Tube Lights, Electrical Wiring and Distribution.
  • BOQ shows 11 items, but individual quantities/units are not disclosed in the provided data.
  • The only explicit timeframe detail relates to the option clause for quantity adjustments and its impact on delivery duration, which references a formula based on original and extended quantities.
  • The buyer statement indicates ATC terms exist but is not reproduced here, and there is no standard or certification list disclosed.

Terms, Conditions & Eligibility

  • The purchaser reserves up to 25% quantity increase/decrease at contract award and during contract currency, at the same contracted rates.
  • Delivery period is reset to last date of the original delivery order; extended time follows the same calculation rule with a minimum of 30 days.
  • Bidders must comply with these option-based delivery terms; other typical terms are not detailed in the provided data, including EMD, GST, or warranty specifics.

Key Specifications

  • Product/service names: Excavation and Foundation Work; Brick Masonry; MS Structural Framework; Roof Trusses; CGI Roofing; Electrical wiring and distribution; Ceiling Fans; LED Tube Lights

  • Quantities: 11 items in BOQ; specific quantities not disclosed

  • EMD/estimated value: Not provided in data

  • Experience: Not specified in data

  • Quality/standards: Not specified in data

  • Delivery: Option clause governs delivery duration with minimum 30 days

  • Warranty/AMC: Not specified in data

Terms & Conditions

  • 25% quantity variation rights at contract and during currency

  • Delivery period recalculated using (Increased quantity ÷ Original quantity) × Original delivery period

  • Minimum delivery extension period set to 30 days

Important Clauses

Delivery Terms

Delivery period adjusts with option quantity changes; minimum extension 30 days; extensions align to original delivery period when possible

Quantity Variation

Purchaser may increase or decrease order quantity up to 25% at bidding and during execution at contracted rates

ATC Document

Buyer uploaded ATC document referenced in tender; bidders should view for additional conditions

Bidder Eligibility

  • Experience in integrated civil-electrical construction projects

  • Capability to execute excavation, masonry, MS framing, roofing and electrical works

  • Compliance with defense-sector procurement norms (where applicable)

Advertisement

Tender Data

Bid Details

Quantity

11

Category

Excavaion and Foundation Work

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Excavaion and Foundation Work , Foundation Masonry Work , Brick Masonry Work , Brick Pillars , MS Structural Framework , Roof Trusses , MS Purling , CGI Roofing Sheet Work , Ceiling Fans , LED Tube Lights , Electrical Wiring and Distribution

Delivery Details

Max Delivery Days

25

Delivery Locations

1

Delivery Cities

NAINITAL

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NAINITALNAINITAL--125-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9776517.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Excavaion and Foundation Work

Excavation of foundation trenches

1 work Delivery: 25 days
#2

Foundation Masonry Work

Construction of foundation wall

1 work Delivery: 25 days
#3

Brick Masonry Work

Construction of Brick wall above foundation

1 work Delivery: 25 days
#4

Brick Pillars

Construction of Brick Pillars

1 work Delivery: 25 days
#5

MS Structural Framework

Fabrication of completed roof structure

1 work Delivery: 25 days
#6

Roof Trusses

Fabrication of trusses

1 work Delivery: 25 days
#7

MS Purling

Fabrication of purling

1 work Delivery: 25 days
#8

CGI Roofing Sheet Work

Installation of CGI roofing sheets

1 work Delivery: 25 days
#9

Ceiling Fans

Installation of 4 ceiling fans

1 work Delivery: 25 days
#10

LED Tube Lights

Installation of 4 LED Tube lights

1 work Delivery: 25 days
#11

Electrical Wiring and Distribution

Complete internal electrical wiring work

1 work Delivery: 25 days

Categories 35

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates from similar works

4

Financial statements (audited if possible)

5

Bid security/EMD documents (amount not disclosed in data)

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable) and site/contractor registrations

8

ATC view/document referenced by buyer (if applicable)

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for the Indian Army excavation and foundation tender in Nainital Uttarakhand 2026

Bidders should review the ATC document, ensure eligibility for civil and electrical works, submit GST, PAN, and experience certificates, and provide EMD as specified in terms. The tender requires adherence to the 25% quantity variation clause and the delivery extensions formula. Prepare technical and financial bids with OEM authorizations if needed.

What documents are required to participate in the Nainital civil works tender

Submit GST certificate, PAN card, experience certificates for similar projects, latest financial statements, EMD documents (amount not disclosed), technical compliance certificates, OEM authorizations, and any ATC documents referenced by the buyer. Ensure all documents are current and match bid formats.

What are the key delivery terms for the defense civil works bid in Uttarakhand

Delivery terms allow up to 25% quantity variation with contracted rates. The delivery period extends from the last date of the original order; extended duration uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Timely delivery is mandatory to avoid penalties.

What standards or certifications are required for the MS structural framework work

The tender text does not specify exact standards; bidders should reference the ATC for any mandatory certifications. In similar defense contracts, ISI/ISO compliance and manufacturer approvals are common, along with safety and quality management documentation.

How is the BOQ information handled if quantities are not disclosed

BoQ items are listed as 11 in number with no unit quantities. Bidders must prepare flexible pricing and demonstrate capability to scale; ensure your bid includes a clear approach for rapid quantity adjustments per the 25% option clause.

When is the bidding window and how is it extended for quantity changes

The data does not provide explicit dates. The option clause allows quantity changes up to 25% during contract and currency. Delivery extension depends on the calculation formula and must consider a minimum 30 days extension.

What is the recommended approach to OEM authorizations for this tender

If the works involve CGI roofing, MS framing or electrical components, include OEM authorization letters confirming product availability and technical support. Align certifications with ATC directives and ensure compatibility with IS/IS standards generally expected in defense projects.

What is the process to view the ATC document for this tender

The ATC document is uploaded by the buyer as a linked file. Bidders should access the file via the tender portal, review all specific conditions, and ensure compliance before preparing the technical bid. Cross-check any amendments issued subsequently.