TenderDekho Logo
GEM

Open Tender for Supply of Stone Pad,Supply of MS Top Channel,Supply of MS Dropper Channel,Supply of MS T off Channe in ETAH, UTTAR PRADESH

Bid Publish Date

04-Jun-2026, 11:02 am

Bid End Date

19-Jun-2026, 12:00 pm

EMD

₹1,40,000

Value

₹1,40,00,000

Progress

Issue04-Jun-2026, 11:02 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

56858

Category

Erection of PCC Pole 8.5 M Single Support

Bid Type

Two Packet Bid

Uttar Pradesh Power Corporation Limited (uppcl) invites bids for Supply of Stone Pad, Supply of MS Top Channel, Supply of MS Dropper Channel, Supply of MS T off Channel, Supply of LT Clamp, Supply of Danger Board, Supply of PRC Connector, Supply of I Hook, Supply of Dead and Clamp, Supply of Suspension Clamp, Supply of MS Angle, Supply of Barbed Wire, Supply of F Clamp, Supply of Number Plate, Supply of Holding Clamp, Supply of Double Pole Clamp, Supply of E Bracket, Supply of Henley Type Lailless Unit, Supply of LT PVC Cable, Supply of Distribution Box Clamp, Supply of Clamp with Nut and Bolts, Supply of Allunimum Lug 25 KVA TF, Supply of Allunimum Lug 63 KVA TF, Supply of Allunimum Lug 100 KVA TF, Supply of Allunimum Lug 250 KVA TF, Supply of Allunimum Lug 400 KVA TF, Safe Carriage of PCC 8. 5 M Pole, Safe Carriage of ST Pole 9 M Pole, Safe Carriage of ST Pole 11 M Pole, Safe Carriage of 25 KVA TF, Safe Carriage of 63 KVA TF, Safe Carriage of 100 KVA TF, Safe Carriage of 250 KVA TF, Safe Carriage of 11 KV Pin Insulator, Safe Carriage of 11 KV Disc Insulator, Safe Carriage of 11 KV Disc Fitting, Safe Carriage of 11 KV Fuse Set, Safe Carriage of Earthing, Safe Carriage of LT AB Cable, Safe Carriage of LT XLPE Cable, Safe Carriage of ACSR Weseal Conductor, Safe Carriage of LT PVC Armoud Cabler, Safe Carriage of Distribution Box, Safe Carriage of Stay Set Complete, Erection of PCC Pole 8. 5 M Single Support, Erection of ST Pole 11 M Single Support, Erection of ST Pole 9 M Single Support, Erection of PCC Pole 8. 5 M Double Pole, Erection of ST Pole 11 M Double Pole, Laying Sagging of Weseal Conductor, Laying Sagging of LT AB Cable, Laying Sagging of LT XLPE Cable, Laying Sagging of LT PVC Armoud Cable, Laying Sagging of LT PVC Cable, Erection of Plinth 250 KVATF, Providing and Installation of Fancing, Erection of Pipe earthing, Mounting of 25 KVA TF, Mounting of 63 KVA TF, Mounting of 100 KVA TF, Mounting of 250 KVA TF, Erection and grouting of stay, Erection of Stone Pad, Fixing of Barbed Wire, Fxing of Danger Board, Fxing of Number Plate, Erection of Earthing Complete, Erection of 3 Phase Distribution Box, Erection of Dead end Clamp, Erection of PRC Connector, Erection of 11 KV Fuse Set, Erection and installation of Lailless Unit, Received Back Material of 10 and 16 KVA TF, Received Back Material of 100 KVA TF, Received Back Material of LT AB Cable in ETAH, UTTAR PRADESH. Quantity: 56858. Submission Deadline: 19-06-2026 12: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Stone Pad , Supply of MS Top Channel , Supply of MS Dropper Channel , Supply of MS T off Channel , Supply of LT Clamp , Supply of Danger Board , Supply of PRC Connector , Supply of I Hook , Supply of Dead and Clamp , Supply of Suspension Clamp , Supply of MS Angle , Supply of Barbed Wire , Supply of F Clamp , Supply of Number Plate , Supply of Holding Clamp , Supply of Double Pole Clamp , Supply of E Bracket , Supply of Henley Type Lailless Unit , Supply of LT PVC Cable , Supply of Distribution Box Clamp , Supply of Clamp with Nut and Bolts , Supply of Allunimum Lug 25 KVA TF , Supply of Allunimum Lug 63 KVA TF , Supply of Allunimum Lug 100 KVA TF , Supply of Allunimum Lug 250 KVA TF , Supply of Allunimum Lug 400 KVA TF , Safe Carriage of PCC 8.5 M Pole , Safe Carriage of ST Pole 9 M Pole , Safe Carriage of ST Pole 11 M Pole , Safe Carriage of 25 KVA TF , Safe Carriage of 63 KVA TF , Safe Carriage of 100 KVA TF , Safe Carriage of 250 KVA TF , Safe Carriage of 11 KV Pin Insulator , Safe Carriage of 11 KV Disc Insulator , Safe Carriage of 11 KV Disc Fitting , Safe Carriage of 11 KV Fuse Set , Safe Carriage of Earthing , Safe Carriage of LT AB Cable , Safe Carriage of LT XLPE Cable , Safe Carriage of ACSR Weseal Conductor , Safe Carriage of LT PVC Armoud Cabler , Safe Carriage of Distribution Box , Safe Carriage of Stay Set Complete , Erection of PCC Pole 8.5 M Single Support , Erection of ST Pole 11 M Single Support , Erection of ST Pole 9 M Single Support , Erection of PCC Pole 8.5 M Double Pole , Erection of ST Pole 11 M Double Pole , Laying Sagging of Weseal Conductor , Laying Sagging of LT AB Cable , Laying Sagging of LT XLPE Cable , Laying Sagging of LT PVC Armoud Cable , Laying Sagging of LT PVC Cable , Erection of Plinth 250 KVATF , Providing and Installation of Fancing , Erection of Pipe earthing , Mounting of 25 KVA TF , Mounting of 63 KVA TF , Mounting of 100 KVA TF , Mounting of 250 KVA TF , Erection and grouting of stay , Erection of Stone Pad , Fixing of Barbed Wire , Fxing of Danger Board , Fxing of Number Plate , Erection of Earthing Complete , Erection of 3 Phase Distribution Box , Erection of Dead end Clamp , Erection of PRC Connector , Erection of 11 KV Fuse Set , Erection and installation of Lailless Unit , Received Back Material of 10 and 16 KVA TF , Received Back Material of 100 KVA TF , Received Back Material of LT AB Cable

Authority Records

ENERGY DEPARTMENT
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9412122.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Uttar Pradesh Cooperative Sugar Factories Federation Limited Stay Insulator and ACSR Conductor Tender Muzaffarnagar UP 2026

N/a

MUZAFFARNAGAR, UTTAR PRADESH

Posted: 19 February 2026
Closed: 13 March 2026
GEM

Airports Authority of India Kolhapur Cable & Accessories Tender Maharashtra 2025 – ISI/IS 550 Inspired Specs & 25% Quantity Flex, ₹12.67 Lakh

N/a

KOLHAPUR, MAHARASHTRA

Posted: 27 November 2025
Closed: 17 December 2025
GEM

Supplyuing Transformer,ITC of transformer,RS Joist H Beam pole,PCC Pole,Erection of steel tubular o

Bharat Sanchar Nigam Limited Portal(bsnl)

PATNA, BIHAR

Posted: 28 April 2025
Closed: 9 May 2025
GEM

Airports Authority Of India Earthing & Electrical Supplies Tender Bhopal Madhya Pradesh 2025

Ans,finance,hr,engineering,tech,ops,commercial,general Store,it

BHOPAL, MADHYA PRADESH

Posted: 28 October 2025
Closed: 18 November 2025
GEM

Supply of LIU with Fiber Management system,Supply of Structural Steel,Fabrication of structural ste

Hindustan Petroleum Corporation Ltd

Posted: 21 October 2024
Closed: 26 December 2024
GEM

Bill of Quantities (BOQ) 83 Items Sign in for GEM prices

#1

Supply of Stone Pad

Stone Pad 300x300x75 mm

218 no Delivery: 60 days
#2

Supply of MS Top Channel

MS Top Channel 125x65x2240 mm

62 no Delivery: 60 days
#3

Supply of MS Dropper Channel

MS Dropper Channel 100x50x2028 mm

114 no Delivery: 60 days
#4

Supply of MS T off Channel

MS T off Channel 125x65x1300 mm

74 no Delivery: 60 days
#5

Supply of LT Clamp

LT Clamp

313 no Delivery: 60 days
#6

Supply of Danger Board

Danger Board with Clamp

513 no Delivery: 60 days
#7

Supply of PRC Connector

PRC Connector

154 no Delivery: 60 days
#8

Supply of I Hook

I Hook

303 no Delivery: 60 days
#9

Supply of Dead and Clamp

Dead and Clamp

106 no Delivery: 60 days
#10

Supply of Suspension Clamp

Suspension Clamp

213 no Delivery: 60 days
#11

Supply of MS Angle

MS Angle 75x75x6x2028 mm with Clamp

122 no Delivery: 60 days
#12

Supply of Barbed Wire

Barbed Wire

204 kg Delivery: 60 days
#13

Supply of F Clamp

F Clamp for STP

16 no Delivery: 60 days
#14

Supply of Number Plate

Number Plate

2 no Delivery: 60 days
#15

Supply of Holding Clamp

Holding Clamp for Top Channel with Nut and Bolts

170 no Delivery: 60 days
#16

Supply of Double Pole Clamp

Double Pole Clamp

36 no Delivery: 60 days
#17

Supply of E Bracket

E Bracket

12 no Delivery: 60 days
#18

Supply of Henley Type Lailless Unit

Henely Type Tailless Unit Protection Cubical Panel 500 A, 650 V for 250 KVA DT

37 no Delivery: 60 days
#19

Supply of LT PVC Cable

LT PVC Cable 3.5x70/35 sq. mm

4,336 m Delivery: 60 days
#20

Supply of Distribution Box Clamp

Distribution Box Clamp

72 no Delivery: 60 days
#21

Supply of Clamp with Nut and Bolts

Clamp with Nut and Bolts

418 no Delivery: 60 days
#22

Supply of Allunimum Lug 25 KVA TF

Allunimum Lug 25 KVA TF

108 no Delivery: 60 days
#23

Supply of Allunimum Lug 63 KVA TF

Allunimum Lug 63 KVA TF

112 no Delivery: 60 days
#24

Supply of Allunimum Lug 100 KVA TF

Allunimum Lug 100 KVA TF

136 no Delivery: 60 days
#25

Supply of Allunimum Lug 250 KVA TF

Allunimum Lug 250 KVA TF

224 no Delivery: 60 days
#26

Supply of Allunimum Lug 400 KVA TF

Allunimum Lug 400 KVA TF

336 no Delivery: 60 days
#27

Safe Carriage of PCC 8.5 M Pole

Safe carriage of PCC 8.5 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

224 no Delivery: 60 days
#28

Safe Carriage of ST Pole 9 M Pole

Safe carriage of ST Pole 9 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

2 no Delivery: 60 days
#29

Safe Carriage of ST Pole 11 M Pole

Safe carriage of ST Pole 11 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

20 no Delivery: 60 days
#30

Safe Carriage of 25 KVA TF

Safe carriage of 11/0.4 KVA TF 25 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

23 no Delivery: 60 days
#31

Safe Carriage of 63 KVA TF

Safe carriage of 11/0.4 KVA TF 63 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

11 no Delivery: 60 days
#32

Safe Carriage of 100 KVA TF

Safe carriage of 11/0.4 KVA TF 100 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

27 no Delivery: 60 days
#33

Safe Carriage of 250 KVA TF

Safe carriage of 11/0.4 KVA TF 250 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

37 no Delivery: 60 days
#34

Safe Carriage of 11 KV Pin Insulator

Safe carriage of 11 KV Pin Insulator from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

246 no Delivery: 60 days
#35

Safe Carriage of 11 KV Disc Insulator

Safe carriage of 11 KV Disc Insulator from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

345 no Delivery: 60 days
#36

Safe Carriage of 11 KV Disc Fitting

Safe carriage of 11 KV Disc Fitting from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

345 no Delivery: 60 days
#37

Safe Carriage of 11 KV Fuse Set

Safe carriage of 11 KV Fuse Set from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

62 no Delivery: 60 days
#38

Safe Carriage of Earthing

Safe carriage of Earthing Complete from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

1,531 no Delivery: 60 days
#39

Safe Carriage of LT AB Cable

Safe carriage of LT AB Cable 3x50+1x35+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

1,444 m Delivery: 60 days
#40

Safe Carriage of LT AB Cable

Safe carriage of LT AB Cable 3x95+1x70+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

3,067 m Delivery: 60 days
#41

Safe Carriage of LT AB Cable

Safe carriage of LT AB Cable 3x120+1x95+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

3,756 m Delivery: 60 days
#42

Safe Carriage of LT XLPE Cable

Safe carriage of LT XLPE 1x400 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

3,120 m Delivery: 60 days
#43

Safe Carriage of LT XLPE Cable

Safe carriage of LT XLPE 3.5x70 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

244 m Delivery: 60 days
#44

Safe Carriage of LT XLPE Cable

Safe carriage of LT XLPE 1x120 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

3,812 m Delivery: 60 days
#45

Safe Carriage of ACSR Weseal Conductor

Safe carriage of ACSR Weseal Conductor from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

3,167 m Delivery: 60 days
#46

Safe Carriage of LT PVC Armoud Cabler

Safe carriage of LT PVC Armoud Cable 4x16/2Cx4 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

204 m Delivery: 60 days
#47

Safe Carriage of Distribution Box

Safe carriage of Distribution Box from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

36 no Delivery: 60 days
#48

Safe Carriage of Stay Set Complete

Safe carriage of Stay Set Complete from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

112 no Delivery: 60 days
#49

Erection of PCC Pole 8.5 M Single Support

Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

110 no Delivery: 60 days
#50

Erection of ST Pole 11 M Single Support

Erection of 11 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

16 no Delivery: 60 days
#51

Erection of ST Pole 9 M Single Support

Erection of 9 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

2 no Delivery: 60 days
#52

Erection of PCC Pole 8.5 M Double Pole

Erection of 8.5 mtr long PCC Pole as Double Pole/Section Pole including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

60 no Delivery: 60 days
#53

Erection of ST Pole 11 M Double Pole

Erection of 11 mtr long ST Pole as Double Pole/Section Pole including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

2 no Delivery: 60 days
#54

Laying Sagging of Weseal Conductor

Laying sagging stringing, binding, jumpering & fixing of weseal Conductor with all accessories etc.

3,167 m Delivery: 60 days
#55

Laying Sagging of LT AB Cable

Laying sagging stringing, binding, jumpering & fixing of LT AB Cable 3x50+1x35+1x16 sq. mm with all accessories etc.

1,444 m Delivery: 60 days
#56

Laying Sagging of LT AB Cable

Laying sagging stringing, binding, jumpering & fixing of LT AB Cable 3x95+1x70+1x16 sq. mm with all accessories etc.

3,067 m Delivery: 60 days
#57

Laying Sagging of LT AB Cable

Laying sagging stringing, binding, jumpering & fixing of LT AB Cable 3x120+1x95+1x16 sq. mm with all accessories etc.

3,756 m Delivery: 60 days
#58

Laying Sagging of LT XLPE Cable

Laying sagging stringing, binding, jumpering & fixing of LT XLPE 1x400 sq. mm with all accessories etc.

3,120 m Delivery: 60 days
#59

Laying Sagging of LT XLPE Cable

Laying sagging stringing, binding, jumpering & fixing of LT XLPE 3.5x70 sq. mm with all accessories etc.

244 m Delivery: 60 days
#60

Laying Sagging of LT XLPE Cable

Laying sagging stringing, binding, jumpering & fixing of LT XLPE 1x120 sq. mm with all accessories etc.

3,812 m Delivery: 60 days
#61

Laying Sagging of LT PVC Armoud Cable

Laying sagging stringing, binding, jumpering & fixing of LT PVC Armoud Cable 4x16/2Cx4 sq. mm. with all accessories etc.

204 m Delivery: 60 days
#62

Laying Sagging of LT PVC Cable

Laying sagging stringing, binding, jumpering & fixing of LT PVC Cable 3.5x70/35 sq. mm with all accessories etc.

4,336 m Delivery: 60 days
#63

Erection of Plinth 250 KVATF

Construction and ionstallation of plinth of 250 Kva TF, complete in all respect.

37 no Delivery: 60 days
#64

Providing and Installation of Fancing

construction and installation of 6 feet height welded wire mech fancing 4M X 4M area, for 250 KVA TF, complete in all respect.

37 no Delivery: 60 days
#65

Erection of Pipe earthing

Pipe earthing up to water level of 250 KVA medium Power Transformers (Body & Nutral). All material shall be provided by the contractor.

74 no Delivery: 60 days
#66

Mounting of 25 KVA TF

Mounting of 25 KVA TF on D/P including making of the connection etc. complete.

23 no Delivery: 60 days
#67

Mounting of 63 KVA TF

Mounting of 63KVA TF on D/P including making of the connection etc. complete.

11 no Delivery: 60 days
#68

Mounting of 100 KVA TF

Mounting of 100 KVA TF on D/P including making of the connection etc. complete.

27 no Delivery: 60 days
#69

Mounting of 250 KVA TF

Mounting of 250 KVA TF on Plinth including making of the connection etc. complete.

37 no Delivery: 60 days
#70

Erection and grouting of stay

Erection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.

112 no Delivery: 60 days
#71

Erection of Stone Pad

Stone Pad 300x300x75 mm

218 no Delivery: 60 days
#72

Fixing of Barbed Wire

Fixing of Barbed Wire

204 kg Delivery: 60 days
#73

Fxing of Danger Board

Danger Board with Clamp

513 no Delivery: 60 days
#74

Fxing of Number Plate

Fxing of Number Plate

2 no Delivery: 60 days
#75

Erection of Earthing Complete

Erection of Earthing Complete

1,531 no Delivery: 60 days
#76

Erection of 3 Phase Distribution Box

Erection of 3 Phase Distribution Box with clamp

36 no Delivery: 60 days
#77

Erection of Dead end Clamp

Erection of Dead end Clamp

106 no Delivery: 60 days
#78

Erection of PRC Connector

Erection of PRC Connector

154 no Delivery: 60 days
#79

Erection of 11 KV Fuse Set

Erection of 11 KV Fuse Set

62 no Delivery: 60 days
#80

Erection and installation of Lailless Unit

Erection and installation of Henely Type Tailess Unit Protection Cubical Panel 500 A, 650 V for 250 KVA DT

37 no Delivery: 60 days
#81

Received Back Material of 10 and 16 KVA TF

Carriage old material of 10/16 TF from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking.

13 no Delivery: 60 days
#82

Received Back Material of 100 KVA TF

Carriage old material of 100 KVA from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking.

36 no Delivery: 60 days
#83

Received Back Material of LT AB Cable

Carriage old material of LT AB Cable 3x50+1x35+1x16 sq. mm from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking.

2 qtl Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found
Urgent

Supply of HDPE Pipe,Supply of Stone Pad,Supply of Nut and Bolts,Supply of LT Clamp,Supply of LT Sha

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

EMD: ₹6,000
Est: ₹6.0 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Supply of LT AB Cable,Supply of ST Pole LT Clamp,Supply of MS Channel Dropper,Supply of Stone Pad,S

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

EMD: ₹59,000
Est: ₹58.3 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Supply of 11 KV Line Material,Supply of 11 KV Line Material,Supply of 11 KV Line Material,Supply of

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

EMD: ₹24,000
Est: ₹24.0 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Supply of Stone Pad,Supply of MS Angle Iron,Supply of Top Channel,Supply of Clamp,Supply of E-Brack

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

EMD: ₹16,000
Est: ₹15.5 L
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Supply of Earthing Rod Complete,Supply of Top Channel,Supply of Droper Channel,Supply of Number Pla

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

Est: ₹3.2 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Chat with us