Fogging Machine (V2) as per IS 14855 (Part 1)
N/a
RAMPUR, UTTAR PRADESH
Bid Publish Date
02-Jul-2026, 5:19 pm
Bid End Date
13-Jul-2026, 6:00 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
The North Eastern Railway (Indian Railways) invites bids for a Fogging Machine (IS 14855 Part 1) Category Q2, to be supplied, installed, tested, and commissioned at Gorakhpur, Uttar Pradesh 273001. The procurement covers the full lifecycle from delivery to on-site commissioning, with RITES pre-dispatch inspection and post-receipt inspection by the consignee against RITES clearance. The bid scope emphasizes complete turnkey execution including on-site setup and acceptance. This tender references a fogging solution aligned to IS 14855 Part 1 standards, ensuring field operability in rail-yard environments with focus on reliability and serviceability. A unique evaluation emphasis lies in demonstrated past experience supporting similar fogging equipment deployments for public sector clients.
Fogging Machine (V2) as per IS 14855 Part 1 Q2
Starting type, fogging machine type, and duration operating without refuel
Fuel tank capacity and pesticide tank capacity
Insecticidal liquid flow range (LPH)
Engine output specification
Chemical tank material and fuel tank material
Warranty period for fogging machine
SITC scope included with installation and commissioning
Inspection by RITES pre-dispatch and consignee post-receipt
Past experience evidence acceptable in multiple formats
No BOQ items listed; supplier must confirm exact model and spec
Warranty and after-sales terms to be provided by bidder
Not disclosed in data; bidders should align with standard railway terms and provide clear milestones for payment tied to SITC acceptance and RITES clearance
Not specified; bidders must propose delivery, installation, and commissioning timelines compatible with site readiness and RITES inspection windows
Not specified; bidders should expect standard LD terms for delay in SITC milestones and warranty breaches per railway procurement norms
Experience in supplying and commissioning fogging equipment or similar environmental control systems
Authorization from fogging machine OEM for local supply
Financial capability to undertake SITC with adequate working capital
Compliance with IS 14855 Part 1 Q2 requirements and railway procurement standards
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Fogging Machine (V2) as per IS 14855 (Part 1) (Q2)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Gorakhpur
Delivery Pincodes
273012
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shashank Sonker | 273012,Office of the Chief Medical Director, North Eastern Railway, Gorakhpur-273012 (UP) | Gorakhpur | Uttar Pradesh | 273012 | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
RAMPUR, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
FATEHPUR, UTTAR PRADESH
N/a
RAEBARELI, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
KHERI, UTTAR PRADESH
Urban Development And Housing Department
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Generic | Starting type | Electrical |
| Generic | Fogging machine type | Vehicle Mounted |
| Generic | Duration to operate without refuel | 4.0 - 40.0 Or higher |
| Generic | Fuel tank capacity | 15.0 - 20.0 Or higher |
| Generic | Pesticide tank capacity | 150.0 - 160.0 Or higher |
| Generic | Insecticidal liquid flow range (In LPH) | 110.0 - 160.0 Or higher |
| Generic | Engine output | 38.0 - 75.0 Or higher |
| Dimension and Constructions | Chemical tank material | Stainless Steel 304 |
| Dimension and Constructions | Fuel tank material | Stainless Steel 304 |
| Certification, Testing & Warranty | Warranty of Fogging machine | 2 Or higher |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN)
Past experience proof (contracts with invoices or client execution certificates)
Technical bid documents demonstrating compliance with IS 14855 Part 1
OEM authorization/carth as applicable
Financial statements (balance sheet and P&L) for last 2-3 years
Any pre-qualification or manufacturer certification documents
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, and financials, plus OEM authorization and past experience proofs. Provide IS 14855 Part 1 compliant fogging equipment details, SITC plan, and RITES-based inspection readiness. Include the device’s engine output, tank capacities, and warranty terms to qualify for evaluation.
Required submissions include GST certificate, PAN, 2-3 years financial statements, past project contracts with invoices or execution certificates, OEM authorization, and technical compliance certificates showing IS 14855 Part 1 Q2 adherence. Also include warranty and after-sales support details.
The tender specifies fogging machine type and IS 14855 Part 1 compliance for Q2 category, including starting mechanism, pesticide and fuel tank capacities, liquid flow rate (LPH), engine output, and material specs for chemical and fuel tanks. Ensure ISI or equivalent certifications where applicable.
Pre-dispatch inspection at seller premises via RITES is required if clause selected; post-receipt inspection occurs at consignee site, with verification against RITES inspection certificate prior to acceptance.
Payment terms are aligned with SITC milestones and RITES clearance; bidders should propose phased payments linked to delivery, installation, and successful commissioning, with final payment upon acceptance and warranty activation, while ensuring compliance with railway procurement norms.
Provide contract copies with invoices and client self-certification, execution certificates from the client, or third-party inspection notes validating delivery and installation of fogging systems in similar public sector projects.
Submit technical datasheets showing IS 14855 Part 1 Q2 conformity, along with any OEM certificates, test reports, and warranty terms. Include material specifications for chemical and fuel tanks, and the engine output with performance metrics.
Pre-dispatch inspections are conducted by an authorized agency (RITES is named). Post-receipt inspections are conducted by the consignee against RITES inspection certificates, ensuring product conformity before acceptance.
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
📍 PRATAPGARH, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
📍 BULANDSHAHR, UTTAR PRADESH
N/a
📍 KAUSHAMBI, UTTAR PRADESH
N/a
📍 SONBHADRA, UTTAR PRADESH
N/a
📍 SURENDRA NAGAR, GUJARAT
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS