TenderDekho Logo
GEM

Government Tender Published for Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells,Copper Wire 1 Sq mm open in DHEMAJI, ASSAM

Bid Publish Date

26-Feb-2026, 11:50 am

Bid End Date

09-Mar-2026, 1:00 pm

EMD

₹2,05,000

Progress

RA
Issue26-Feb-2026, 11:50 am
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

25296

Category

Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells

Bid Type

Two Packet Bid

Categories 92

Indian Army invites bids for Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells, Copper Wire 1 Sq mm open in DHEMAJI, ASSAM. Quantity: 25296. Submission Deadline: 09-03-2026 13: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9048529.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells,Copper Wire 1 Sq mm open

Indian Army

DHEMAJI, ASSAM

Posted: 26 February 2026
Closed: 9 March 2026
GEM

2 point 5 Sqmm Copper Wire Bracket open Make colon Finolex,1 point 5 Sqmm Copper Wire Bracket open

Indian Army

DHEMAJI, ASSAM

Posted: 5 October 2025
Closed: 16 October 2025
GEM

1 Sqmm single core multi standred copper wire Bracket open Make colon Finolex slash Havells,1 point

Indian Army

DHEMAJI, ASSAM

Posted: 7 November 2025
Closed: 17 November 2025
GEM

Flexible Cable Copper bracket open Make colon Finolex slash Havells slash Polycab slash Plaza brack

Indian Army

DHEMAJI, ASSAM

Posted: 19 September 2025
Closed: 30 September 2025
GEM

PVC Pipe 110 mm dia each 3 mtr length open bracket Make colon Prince slash Finolex slash Supreme cl

Indian Army

SONITPUR, ASSAM

Posted: 8 July 2025
Closed: 26 July 2025
GEM

Bill of Quantities (BOQ) 178 Items Sign in for GEM prices

#1

Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells

Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

36 roll Delivery: 15 days
#2

Copper Wire 1 Sq mm open bracket Make colon Finolex slash Havells

Copper Wire 1 Sq mm open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

28 roll Delivery: 15 days
#3

Copper Wire 2 point 5 Sq mm open bracket Make colon Finolex

Copper Wire 2 point 5 Sq mm open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

22 roll Delivery: 15 days
#4

Cable 10 Sq mm 2 Core open bracket Make colon Finolex

Cable 10 Sq mm 2 Core open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

19 roll Delivery: 15 days
#5

Cable 6 Sq mm 2 Core open bracket Make colon Finolex

Cable 6 Sq mm 2 Core open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

15 roll Delivery: 15 days
#6

Change over 63 amp open bracket Make colon Philips

Change over 63 amp open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

13 nos Delivery: 15 days
#7

Change over 32 Amp open bracket Make colon Philips

Change over 32 Amp open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

15 nos Delivery: 15 days
#8

Flexible Wire open bracket Make colon Finolex

Flexible Wire open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

29 roll Delivery: 15 days
#9

Plywood 6 feet x 3 feet 12 mm open bracket Make colon Greenply

Plywood 6 feet x 3 feet 12 mm open bracket Make colon Greenply slash Century slash Kitply close bracket

55 nos Delivery: 15 days
#10

Ply wood 8 feet x 4 feet 6 mm open bracket Make colon Greenply

Ply wood 8 feet x 4 feet 6 mm open bracket Make colon Greenply slash Century slash Kitply close bracket

36 nos Delivery: 15 days
#11

Plywood 8 feet x 4 feet 12 mm open bracket Make colon Greenply

Plywood 8 feet x 4 feet 12 mm open bracket Make colon Greenply slash Century slash Kitply close bracket

35 nos Delivery: 15 days
#12

Curtain Rod as per approved sample

Curtain Rod as per approved sample

45 nos Delivery: 15 days
#13

Angle Holder open bracket Make colon Philips slash Bajaj

Angle Holder open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

150 nos Delivery: 15 days
#14

Pendent Holder open bracket Make colon Philips slash Bajaj

Pendent Holder open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

135 nos Delivery: 15 days
#15

LED Bulb 9 W open bracket Make colon Philips slash Bajaj

LED Bulb 9 W open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

165 nos Delivery: 15 days
#16

LED Bulb 15 W open bracket Make colon Philips slash Bajaj

LED Bulb 15 W open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

139 nos Delivery: 15 days
#17

LED Bulb 12 W open bracket Make colon Philips slash Bajaj

LED Bulb 12 W open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

155 nos Delivery: 15 days
#18

LED Bulb 18 Watt open bracket Make colon Philips slash Bajaj

LED Bulb 18 Watt open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

120 nos Delivery: 15 days
#19

Bed Switch open bracket Make colon Philips slash Bajaj

Bed Switch open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

164 nos Delivery: 15 days
#20

Bulk Head Fitting open bracket Make colon Philips slash Bajaj

Bulk Head Fitting open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

50 nos Delivery: 15 days
#21

CP Pillar Cock 15mm open bracket Make colon Jaquar

CP Pillar Cock 15mm open bracket Make colon Jaquar slash Hindware slash Cera close bracket

50 nos Delivery: 15 days
#22

CP Bib Cock 15mm open bracket Make colon Jaquar

CP Bib Cock 15mm open bracket Make colon Jaquar slash Hindware slash Cera close bracket

60 nos Delivery: 15 days
#23

Soap Tray open bracket Make colon Jaquar

Soap Tray open bracket Make colon Jaquar slash Hindware slash Cera close bracket

60 nos Delivery: 15 days
#24

Stop Cock 20mm open bracket Make colon Astral

Stop Cock 20mm open bracket Make colon Astral slash Supreme slash Prince close bracket

25 nos Delivery: 15 days
#25

Stop Cock 15mm open bracket Make colon Jaquar

Stop Cock 15mm open bracket Make colon Jaquar slash Hindware slash Cera close bracket

15 nos Delivery: 15 days
#26

Angle Cock 15mm open bracket Make colon Jaquar

Angle Cock 15mm open bracket Make colon Jaquar slash Hindware slash Cera close bracket

30 nos Delivery: 15 days
#27

Cement Bag open bracket Make colon JK

Cement Bag open bracket Make colon JK slash Ultratech slash Ambuja close bracket

635 bag Delivery: 15 days
#28

Sand as per approve sample

Sand as per approve sample

48 cum Delivery: 15 days
#29

Agg 20mm as per approve sample

Agg 20mm as per approve sample

32 cum Delivery: 15 days
#30

Agg 40mm as per approve sample

Agg 40mm as per approve sample

32 cum Delivery: 15 days
#31

Agg 63 mm as per approve sample

Agg 63 mm as per approve sample

16 cum Delivery: 15 days
#32

Tile 2 feet x 2 feet open bracket make colon Kajaria

Tile 2 feet x 2 feet open bracket make colon Kajaria slash Somany slash Orientbell close bracket

1,400 nos Delivery: 15 days
#33

Tile 1 feet x 1 feet open bracket make colon Kajaria

Tile 1 feet x 1 feet open bracket make colon Kajaria slash Somany slash Orientbell close bracket

900 nos Delivery: 15 days
#34

White Cement open bracket Make colon JK slash Ultratech

White Cement open bracket Make colon JK slash Ultratech slash Ambuja close bracket

48 kg Delivery: 15 days
#35

Binding Wire as per approve sample

Binding Wire as per approve sample

150 kg Delivery: 15 days
#36

Four Head Screw 3 slash 4 inch as per approve sample

Four Head Screw 3 slash 4 inch as per approve sample

9 pkt Delivery: 15 days
#37

White Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

White Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

350 ltr Delivery: 15 days
#38

Paint Brush 4 inch as per approve sample

Paint Brush 4 inch as per approve sample

50 nos Delivery: 15 days
#39

Paint Brush 2 inch as per approve sample

Paint Brush 2 inch as per approve sample

50 nos Delivery: 15 days
#40

Roller 6 inch as per approve sample

Roller 6 inch as per approve sample

32 nos Delivery: 15 days
#41

Black Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

Black Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

360 ltr Delivery: 15 days
#42

OG Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

OG Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

400 ltr Delivery: 15 days
#43

Green Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

Green Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

380 ltr Delivery: 15 days
#44

Blue Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

Blue Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

380 ltr Delivery: 15 days
#45

Red Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

Red Paint open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

385 ltr Delivery: 15 days
#46

Thinner open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

Thinner open bracket Make colon Asian Paint slash Berger slash Nerolac close bracket

400 ltr Delivery: 15 days
#47

Cassing capping as per approve sample

Cassing capping as per approve sample

200 nos Delivery: 15 days
#48

Armd Cable 16 Sq mm 4 core open bracket Make colon Finolex

Armd Cable 16 Sq mm 4 core open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

8 roll Delivery: 15 days
#49

Armd Cable 35 Sq mm 4 core open bracket Make colon Finolex

Armd Cable 35 Sq mm 4 core open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

7 roll Delivery: 15 days
#50

Fan Regulator open bracket Make colon Philips slash Bajaj

Fan Regulator open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

79 nos Delivery: 15 days
#51

Fan Capacitor open bracket Make colon Philips slash Bajaj

Fan Capacitor open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

125 nos Delivery: 15 days
#52

Switch Socket Combination 5 Amp open bracket Make colon Philips

Switch Socket Combination 5 Amp open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

144 nos Delivery: 15 days
#53

Switch Socket Combination 15 Amp open bracket Make colon Philips

Switch Socket Combination 15 Amp open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

165 nos Delivery: 15 days
#54

PVC Box 8 inch x 10 inch open bracket Make colon Philips slash Bajaj

PVC Box 8 inch x 10 inch open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

100 nos Delivery: 15 days
#55

PVC Box 6 inch x 4 inch open bracket Make colon Philips slash Bajaj

PVC Box 6 inch x 4 inch open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

100 nos Delivery: 15 days
#56

PVC Box 4 inch x 4 inch open bracket Make colon Philips slash Bajaj

PVC Box 4 inch x 4 inch open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

110 nos Delivery: 15 days
#57

Modular Switch 15 Amp open bracket Make colon Philips slash Bajaj

Modular Switch 15 Amp open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

90 nos Delivery: 15 days
#58

Modular Switch 05 Amp Penta open bracket Make colon Philips

Modular Switch 05 Amp Penta open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

105 nos Delivery: 15 days
#59

Tube Light 20 W 4 feet open bracket Make colon Philips slash Bajaj

Tube Light 20 W 4 feet open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

210 nos Delivery: 15 days
#60

Tube Light 15 W 4 feet open bracket Make colon Philips slash Bajaj

Tube Light 15 W 4 feet open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

195 nos Delivery: 15 days
#61

Gabian Box of size 1 Mtr x 1 Mtr x 1 Mtr open bracket OEM Certified close bracket

Gabian Box of size 1 Mtr x 1 Mtr x 1 Mtr open bracket OEM Certified close bracket

112 nos Delivery: 15 days
#62

Gabian Box of size 2 Mtr x 1 Mtr x 1 Mtr open bracket OEM Certified close bracket

Gabian Box of size 2 Mtr x 1 Mtr x 1 Mtr open bracket OEM Certified close bracket

109 nos Delivery: 15 days
#63

Gabian Box of size 3 Mtr x 1 Mtr x 1 Mtr open bracket OEM Certified close bracket

Gabian Box of size 3 Mtr x 1 Mtr x 1 Mtr open bracket OEM Certified close bracket

105 nos Delivery: 15 days
#64

Tube Light 10 W 2 feet open bracket Make colon Philips slash Bajaj

Tube Light 10 W 2 feet open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

125 nos Delivery: 15 days
#65

Insulation Tape as per approve sample

Insulation Tape as per approve sample

150 roll Delivery: 15 days
#66

MCB 16 Amp open bracket Make colon Philips slash Bajaj

MCB 16 Amp open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

15 nos Delivery: 15 days
#67

MCB 06 Amp open bracket Make colon Philips slash Bajaj

MCB 06 Amp open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

15 nos Delivery: 15 days
#68

MCB 10 MCB open bracket Make colon Philips slash Bajaj

MCB 10 MCB open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

18 nos Delivery: 15 days
#69

MCB 20 MCB open bracket Make colon Philips slash Bajaj

MCB 20 MCB open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

14 nos Delivery: 15 days
#70

MCB 32 Amp SP open bracket Make colon Philips slash Bajaj

MCB 32 Amp SP open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

22 nos Delivery: 15 days
#71

MCB 63 Amp DP open bracket Make colon Philips slash Bajaj

MCB 63 Amp DP open bracket Make colon Philips slash Bajaj slash Havells slash Anchor close bracket

13 nos Delivery: 15 days
#72

Cable 4 Sq mm Two Core open bracket Make colon Finolex

Cable 4 Sq mm Two Core open bracket Make colon Finolex slash Havells slash Polycab slash Plaza close bracket

12 roll Delivery: 15 days
#73

Nails 1 inch as per approve sample

Nails 1 inch as per approve sample

225 kg Delivery: 15 days
#74

Nails 2 inch as per approve sample

Nails 2 inch as per approve sample

220 kg Delivery: 15 days
#75

Nails 3 inch as per approve sample

Nails 3 inch as per approve sample

225 kg Delivery: 15 days
#76

Nails 4 inch as per approve sample

Nails 4 inch as per approve sample

250 kg Delivery: 15 days
#77

Nails 5 inch as per approve sample

Nails 5 inch as per approve sample

195 kg Delivery: 15 days
#78

Nails 6 inch as per approve sample

Nails 6 inch as per approve sample

225 kg Delivery: 15 days
#79

Self tapping Screw 2 inch as per approve sample

Self tapping Screw 2 inch as per approve sample

10 pkt Delivery: 15 days
#80

Self tapping Screw 3 inch as per approve sample

Self tapping Screw 3 inch as per approve sample

10 pkt Delivery: 15 days
#81

Self Tapping Sccrew 1 inch as per approve sample

Self Tapping Sccrew 1 inch as per approve sample

9 pkt Delivery: 15 days
#82

Waste Pipe as per approve sample

Waste Pipe as per approve sample

90 nos Delivery: 15 days
#83

Sand Bag as per approve sample

Sand Bag as per approve sample

3,000 nos Delivery: 15 days
#84

Acrylic Sheet open bracket 6 feet x 4 feet close bracket as per approve sample

Acrylic Sheet open bracket 6 feet x 4 feet close bracket as per approve sample

15 nos Delivery: 15 days
#85

M Seal as per approve sample

M Seal as per approve sample

80 nos Delivery: 15 days
#86

Float Valve as per approve sample

Float Valve as per approve sample

30 nos Delivery: 15 days
#87

Health Faucet open bracket Make colon Parryware

Health Faucet open bracket Make colon Parryware slash Hindware slash Cera close bracket

25 nos Delivery: 15 days
#88

PVC Socket 20mm Green open bracket Make colon Supreme

PVC Socket 20mm Green open bracket Make colon Supreme slash Astral slash Finolex slash Pluton close bracket

55 nos Delivery: 15 days
#89

PVC Socket 25mm Green open bracket Make colon Supreme

PVC Socket 25mm Green open bracket Make colon Supreme slash Astral slash Finolex slash Pluton close bracket

55 nos Delivery: 15 days
#90

PVC Elbow 20 mm Green open bracket Make colon Supreme

PVC Elbow 20 mm Green open bracket Make colon Supreme slash Astral slash Finolex slash Pluton close bracket

55 nos Delivery: 15 days
#91

PVC Elbow 25mm Green open bracket Make colon Supreme

PVC Elbow 25mm Green open bracket Make colon Supreme slash Astral slash Finolex slash Pluton close bracket

55 nos Delivery: 15 days
#92

PVC Union 20 mm Green open bracket Make colon Supreme

PVC Union 20 mm Green open bracket Make colon Supreme slash Astral slash Finolex slash Pluton close bracket

55 nos Delivery: 15 days
#93

PVC Union 25mm Green open bracket Make colon Supreme

PVC Union 25mm Green open bracket Make colon Supreme slash Astral slash Finolex slash Pluton close bracket

55 nos Delivery: 15 days
#94

Conduit Pipe as per approve sample

Conduit Pipe as per approve sample

20 nos Delivery: 15 days
#95

Conduit Pipe flexible as per approve sample

Conduit Pipe flexible as per approve sample

10 rm Delivery: 15 days
#96

Magnetic Screw 1 inch as per approve sample

Magnetic Screw 1 inch as per approve sample

408 nos Delivery: 15 days
#97

Magnetic Screw 1 point 5 inch as per approve sample

Magnetic Screw 1 point 5 inch as per approve sample

490 nos Delivery: 15 days
#98

Gate Valve 15 mm as per approve sample

Gate Valve 15 mm as per approve sample

7 nos Delivery: 15 days
#99

Gate Valve 20 mm as per approve sample

Gate Valve 20 mm as per approve sample

9 nos Delivery: 15 days
#100

Gate Valve 25 mm as per approve sample

Gate Valve 25 mm as per approve sample

10 nos Delivery: 15 days
#101

Looking Mirror 300 x 450mm as per approve sample

Looking Mirror 300 x 450mm as per approve sample

22 nos Delivery: 15 days
#102

Looking Mirror 1200 x 450mm as per approve sample

Looking Mirror 1200 x 450mm as per approve sample

20 nos Delivery: 15 days
#103

Door Hinge as per approve sample

Door Hinge as per approve sample

55 nos Delivery: 15 days
#104

Door Handle as per approve sample

Door Handle as per approve sample

65 nos Delivery: 15 days
#105

GI Elbow 15mm open bracket ISI Marked close bracket

GI Elbow 15mm open bracket ISI Marked close bracket

125 nos Delivery: 15 days
#106

GI Elbow 20mm open bracket ISI Marked close bracket

GI Elbow 20mm open bracket ISI Marked close bracket

125 nos Delivery: 15 days
#107

GI Elbow 25mm open bracket ISI Marked close bracket

GI Elbow 25mm open bracket ISI Marked close bracket

110 nos Delivery: 15 days
#108

GI Elbow 32 mm open bracket ISI Marked close bracket

GI Elbow 32 mm open bracket ISI Marked close bracket

130 nos Delivery: 15 days
#109

GI Elbow 40mm open bracket ISI Marked close bracket

GI Elbow 40mm open bracket ISI Marked close bracket

150 nos Delivery: 15 days
#110

GI Elbow 50mm open bracket ISI Marked close bracket

GI Elbow 50mm open bracket ISI Marked close bracket

150 nos Delivery: 15 days
#111

GI Socket 15mm open bracket ISI Marked close bracket

GI Socket 15mm open bracket ISI Marked close bracket

160 nos Delivery: 15 days
#112

GI Socket 20mm open bracket ISI Marked close bracket

GI Socket 20mm open bracket ISI Marked close bracket

160 nos Delivery: 15 days
#113

GI Socket 25mm open bracket ISI Marked close bracket

GI Socket 25mm open bracket ISI Marked close bracket

130 nos Delivery: 15 days
#114

GI Union 15 mm open bracket ISI Marked close bracket

GI Union 15 mm open bracket ISI Marked close bracket

90 nos Delivery: 15 days
#115

GI Union 20 mmopen bracket ISI Marked close bracket

GI Union 20 mmopen bracket ISI Marked close bracket

140 nos Delivery: 15 days
#116

GI Union 25 mm open bracket ISI Marked close bracket

GI Union 25 mm open bracket ISI Marked close bracket

130 nos Delivery: 15 days
#117

GI Union 40 mm open bracket ISI Marked close bracket

GI Union 40 mm open bracket ISI Marked close bracket

90 nos Delivery: 15 days
#118

PPR Pipe 20 mm open bracket Make colon Astral

PPR Pipe 20 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

100 nos Delivery: 15 days
#119

PPR Pipe 25 mm open bracket Make colon Astral

PPR Pipe 25 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

80 nos Delivery: 15 days
#120

PPR Pipe 32 mm open bracket Make colon Astral slash Ashirvad

PPR Pipe 32 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

95 nos Delivery: 15 days
#121

PPR Elbow 20 mm open bracket Make colon Astral

PPR Elbow 20 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

100 nos Delivery: 15 days
#122

PPR Elbow 25 mm open bracket Make colon Astral

PPR Elbow 25 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

80 nos Delivery: 15 days
#123

PPR Elbow 32 mm open bracket Make colon Astral

PPR Elbow 32 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

95 nos Delivery: 15 days
#124

PPR Tee 20 mm open bracket Make colon Astral

PPR Tee 20 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

100 nos Delivery: 15 days
#125

PPR Tee 25 mm open bracket Make colon Astral

PPR Tee 25 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

80 nos Delivery: 15 days
#126

PPR Tee 32 mm open bracket Make colon Astral

PPR Tee 32 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

95 nos Delivery: 15 days
#127

PPR Socket 20 mm open bracket Make colon Astral

PPR Socket 20 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

100 nos Delivery: 15 days
#128

PPR Socket 25 mm open bracket Make colon Astral

PPR Socket 25 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

80 nos Delivery: 15 days
#129

PPR Socket 32 mm open bracket Make colon Astral

PPR Socket 32 mm open bracket Make colon Astral slash Ashirvad slash Supreme close bracket

90 nos Delivery: 15 days
#130

Acrylic sheet open bracket 8 feet x 6 feet close bracket as approved sample

Acrylic sheet open bracket 8 feet x 6 feet close bracket as approved sample

16 nos Delivery: 15 days
#131

Hydraulic Door Closer open bracket Make colon Godrej

Hydraulic Door Closer open bracket Make colon Godrej slash Samrat slash plantex close bracket

10 nos Delivery: 15 days
#132

Pixelhead 5W open bracket Make colon Phillips

Pixelhead 5W open bracket Make colon Phillips slash Havells slash Anchor close bracket

60 nos Delivery: 15 days
#133

Brown Paint open bracket Make colon Biritish slash nerolac

Brown Paint open bracket Make colon Biritish slash nerolac slash Asian close bracket

350 ltr Delivery: 15 days
#134

Golden Brown Paint open bracket Make colon Biritish slash nerolac

Golden Brown Paint open bracket Make colon Biritish slash nerolac slash Asian close bracket

320 ltr Delivery: 15 days
#135

Mattress open bracket Make colon Kurlon slash Sleepwell close bracket

Mattress open bracket Make colon Kurlon slash Sleepwell close bracket

32 nos Delivery: 15 days
#136

Sintex 1000 Ltr open bracket Make colon Supreme slash Astral

Sintex 1000 Ltr open bracket Make colon Supreme slash Astral slash Sintex slash Pluton close bracket

10 nos Delivery: 15 days
#137

Sintex 500 Ltr open bracket Make colon Supreme slash Astral

Sintex 500 Ltr open bracket Make colon Supreme slash Astral slash Sintex slash Pluton close bracket

12 nos Delivery: 15 days
#138

Tarpaulin open bracket 15 feetx 18 feet close bracket as per approve sample

Tarpaulin open bracket 15 feetx 18 feet close bracket as per approve sample

35 nos Delivery: 15 days
#139

Tarpaulin open bracket 18 feetx 24 feet close bracket as per approve sample

Tarpaulin open bracket 18 feetx 24 feet close bracket as per approve sample

35 nos Delivery: 15 days
#140

Tarpaulin open bracket 32 feetx 36 feet close bracket as per approve sample

Tarpaulin open bracket 32 feetx 36 feet close bracket as per approve sample

35 nos Delivery: 15 days
#141

Tarpaulin open bracket 30 feetx 32 feet close bracket as per approve sample

Tarpaulin open bracket 30 feetx 32 feet close bracket as per approve sample

35 nos Delivery: 15 days
#142

SS Curtain Bracket open bracket Make colon Arena slashUsha slashAisha Pardawala close bracket

SS Curtain Bracket open bracket Make colon Arena slashUsha slashAisha Pardawala close bracket

80 nos Delivery: 15 days
#143

SS Curtain Rod 10 Feet open bracket Make colon Arena slash Usha close bracket

SS Curtain Rod 10 Feet open bracket Make colon Arena slash Usha close bracket

40 nos Delivery: 15 days
#144

Plywood 6 feet x 3 feet open bracket Make colon Greenply slashCentury slashKitply close bracket

Plywood 6 feet x 3 feet open bracket Make colon Greenply slashCentury slashKitply close bracket

35 nos Delivery: 15 days
#145

Plywood 8 feet x 4 feet 6mm open bracket Make colon Greenply slashCentury slashKitply close bracket

Plywood 8 feet x 4 feet 6mm open bracket Make colon Greenply slashCentury slashKitply close bracket

40 nos Delivery: 15 days
#146

Plywood 8 feet x 4 feet 12mm open bracket Make colon Greenply slashCentury slashKitply close bracket

Plywood 8 feet x 4 feet 12mm open bracket Make colon Greenply slashCentury slashKitply close bracket

49 nos Delivery: 15 days
#147

White Cement open bracket Make colon JK slashBirla slashUltratech slashAmbuja close bracket

White Cement open bracket Make colon JK slashBirla slashUltratech slashAmbuja close bracket

60 nos Delivery: 15 days
#148

Latch as approved sample

Latch as approved sample

100 nos Delivery: 15 days
#149

Latch Hook as approved sample

Latch Hook as approved sample

100 nos Delivery: 15 days
#150

Binding Wire as approved sample

Binding Wire as approved sample

125 kgs Delivery: 15 days
#151

Mirror Looking as approved sample

Mirror Looking as approved sample

22 nos Delivery: 15 days
#152

Door Handle as approved sample

Door Handle as approved sample

60 nos Delivery: 15 days
#153

CGI Sheet 06 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

CGI Sheet 06 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

40 nos Delivery: 15 days
#154

CGI Sheet 08 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

CGI Sheet 08 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

62 nos Delivery: 15 days
#155

CGI Sheet 10 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

CGI Sheet 10 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

15 nos Delivery: 15 days
#156

CGI Sheet 12 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

CGI Sheet 12 feet open bracket Make colon Tata slashJindal slashBhushan close bracket

30 nos Delivery: 15 days
#157

PPGI Sheet of Size 10 x 3 point 5 ft open bracket Make colon Tata slashJindal slashBhushan close bracket

PPGI Sheet of Size 10 x 3 point 5 ft open bracket Make colon Tata slashJindal slashBhushan close bracket

40 nos Delivery: 15 days
#158

Tarpaulin 18 x 24 feet as approved sample

Tarpaulin 18 x 24 feet as approved sample

25 nos Delivery: 15 days
#159

Tarpaulin 15 x 18 feet as approved sample

Tarpaulin 15 x 18 feet as approved sample

15 nos Delivery: 15 days
#160

Tarpaulin 30 x 32 feet as approved sample

Tarpaulin 30 x 32 feet as approved sample

25 nos Delivery: 15 days
#161

HDPE Sand Bag as per approved sample

HDPE Sand Bag as per approved sample

995 nos Delivery: 15 days
#162

PBS Roll of 3m x 25m as approved sample

PBS Roll of 3m x 25m as approved sample

5 nos Delivery: 15 days
#163

Cement Bag open bracket Make colon JK slashUltratech slashAmbuja close bracket

Cement Bag open bracket Make colon JK slashUltratech slashAmbuja close bracket

223 bag Delivery: 15 days
#164

Wire mesh open bracket 4 ft x 100 ft close bracket open bracket Make colon TATA slash Jindal Steel close bracket

Wire mesh open bracket 4 ft x 100 ft close bracket open bracket Make colon TATA slash Jindal Steel close bracket

5 roll Delivery: 15 days
#165

Acrylic Sheet 6 feet x 4 feet of 4mm thick as per approved sample

Acrylic Sheet 6 feet x 4 feet of 4mm thick as per approved sample

12 nos Delivery: 15 days
#166

Self Tapping Screw 2 inch as per approved sample

Self Tapping Screw 2 inch as per approved sample

947 pcs Delivery: 15 days
#167

Self Tapping Screw 1 point 5 inch as per approved sample

Self Tapping Screw 1 point 5 inch as per approved sample

998 pcs Delivery: 15 days
#168

Self Tapping Screw 3 inch as per approved sample

Self Tapping Screw 3 inch as per approved sample

800 pcs Delivery: 15 days
#169

Hesco Bag as per approved sample

Hesco Bag as per approved sample

30 nos Delivery: 15 days
#170

4 Sqmm Single Core multi standred copper wire open bracket Make colon Finolex slashHavells slashPolycab slashPlaza close bracket

4 Sqmm Single Core multi standred copper wire open bracket Make colon Finolex slashHavells slashPolycab slashPlaza close bracket

15 roll Delivery: 15 days
#171

Cable 6 sqmm 2 core aluminium open bracket Make colon Finolex slashHavells slashPolycab slashPlaza close bracket

Cable 6 sqmm 2 core aluminium open bracket Make colon Finolex slashHavells slashPolycab slashPlaza close bracket

20 roll Delivery: 15 days
#172

Cable 16 sq mm 4 Core open bracket Make colon Finolex slash Havells slash Polycab close bracket

Cable 16 sq mm 4 Core open bracket Make colon Finolex slash Havells slash Polycab close bracket

2 roll Delivery: 15 days
#173

PPR Pipe 20 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

PPR Pipe 20 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

80 nos Delivery: 15 days
#174

PPR Pipe 25 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

PPR Pipe 25 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

80 nos Delivery: 15 days
#175

PPR Pipe 32 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

PPR Pipe 32 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

80 nos Delivery: 15 days
#176

CPVC Pipe 20 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

CPVC Pipe 20 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

60 nos Delivery: 15 days
#177

CPVC Pipe 32 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

CPVC Pipe 32 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

60 nos Delivery: 15 days
#178

CPVC Pipe 25 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

CPVC Pipe 25 mm open bracket Make colon Supreme slash Sintex slashSMS close bracket

60 nos Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

15-Mar-2026, 12:00 pm

End

16-Mar-2026, 12:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
J. B. ASSOCIATES   Under PMA
-09-03-2026 08:49:35
2
M/S AMIT TRADERS   Under PMA
-09-03-2026 09:07:06
3
S. B. TRADING COMPANY   Under PMA
-09-03-2026 10:27:40
4
SUNWIN ENERGY AND INFRA PRIVATE LIMITED   Under PMA
-08-03-2026 12:52:50
5
SUNWIN INFRATECH PRIVATE LIMITED   Under PMA
-08-03-2026 14:39:51
6
SWASTIK ENTERPRISE   Under PMA
-08-03-2026 11:07:25

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1SWASTIK ENTERPRISE(MSE,MII)   Under PMA Winner ₹97,37,576Item Categories : Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells,Copper Wire 1 Sq mm open
L2SUNWIN ENERGY AND INFRA PRIVATE LIMITED (MSE,MII)   Under PMA₹1,02,02,763Item Categories : Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells,Copper Wire 1 Sq mm open
L3SUNWIN INFRATECH PRIVATE LIMITED (MSE,MII)   Under PMA₹1,03,49,581Item Categories : Copper Wire 1 point 5 Sq mm open bracket Make colon Finolex slash Havells,Copper Wire 1 Sq mm open

🎉 L1 Winner

SWASTIK ENTERPRISE(MSE,MII)   Under PMA

Final Price: ₹97,37,576

Similar Tenders

5 found

Copper Tubular Inline Connector, Size 25 Sq. mm, CAT No. CB-24,copper lug 4-6 Sq. mm with 10 mm hol

Nlc India Limited

📍 CUDDALORE, TAMIL NADU

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Yantra India Limited Cable Procurement Tender Kolkata for 95/35/25/16 SQ.MM Armoured Copper Cables 2026

Yantra India Limited

EMD: ₹5,932
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Copper Trailing/Rubber Cable 4CX35Sqmm for Mines Electrical

Hindustan Copper Limited

📍 BALAGHAT, MADHYA PRADESH

EMD: ₹37,000
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

Copper Band Blank (5.9 mm) for Shell 125 MM HE 1A as per Drg. No. SK-10085 Rev. ‘ A’

Advanced Weapons And Equipment India Limited

📍 KANPUR NAGAR, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

1.5 mm copper flat cable,6 mm copper flat cable,10 mm copper flat cable

N/a

📍 SHAHJAHANPUR, UTTAR PRADESH

EMD: ₹28,750
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM