Rourkela Steel Plant HITACHI Card Control Boards HMD/HME Tender Odisha 2026
Rourkela Steel Plant
SUNDERGARH, ODISHA
Bid Publish Date
27-Jun-2026, 11:08 am
Bid End Date
09-Jul-2026, 6:00 pm
Location
Progress
Quantity
3
Category
CARD, ELECTRONIC, ASSY, WMOD008090, INDUCTOT
Bid Type
Two Packet Bid
The opportunity is issued by Rourkela Steel Plant under the Steel Authority of India Limited for the supply of Electronic Card Assemblies (HF Welder Control Board, PCB DC-2 & PCB DC-1). This PAC buying case requires the OEM or their authorized dealers to bid, with a scope limited to the supply of goods. The delivery window is 12 weeks (90 days) from PO placement, and pricing must remain firm till delivery. A 12-month warranty from installation or 18 months from supply is mandated, with a 12-week delivery commitment. The packaging must protect goods in transit, and joint inspection will occur at RSP stores. The procurement emphasizes Make in India compliance (self-certified documents in Annexure A(I)), and a bid declaration seal is required in lieu of EMD. Unique terms include RPN considerations and a strict supplier authorization requirement. The tender is based in Sundargarh, Odisha and targets electronic card assemblies for machine parts with exact identifications. The customer demands adequate documentation and supplier seals to validate bids, along with a clear anti-banning guideline present on the SAIL tender site. This is a high-precision electronics component procurement with direct supplier responsibility and formal post-delivery verification.
Electronic Card Assemblies: HF Welder Control Board, PCB DC-2, PCB DC-1
Delivery window: 12 weeks from PO, 90 days
Warranty: 12 months from installation or 18 months from supply
Price: Firm from PO to delivery
Inspection items: Name Plate details, Machine Part No., ID Number
OEM-only eligibility; authorized dealer acceptance with authorization letter if needed
12-week delivery window with firm pricing until delivery
12-month installation-based warranty or 18-month supply-based warranty
GST invoices must be uploaded on GeM with GST payment confirmation; no EMD; bid declaration substitute
Delivery within 12 weeks (90 days) from PO date; ensure packaging for transit protection
RPN clause applies for non-performance with 14-30 days notice to rectify; penalties via SIC policy
OEM or authorized dealers only
Non-OEM bidders must provide an OEM authorization letter
Make in India documentation and self-certifications required
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CARD, ELECTRONIC, ASSY, WMOD008090, INDUCTOT , CARD, ELECTRONIC, ASSY, WMOD008071, INDUCTOT , CARD, ELECTRONIC, ASSY, WMOD008061, INDUCTOT
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Rourkela Steel Plant
SUNDERGARH, ODISHA
Indian Institute Of Astrophysics (iia)
BANGALORE, KARNATAKA
Centre For Development Of Advanced Computing (c-dac)
Bharat Dynamics Limited
National Fertilizers Limited (nfl)
GUNA, MADHYA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Bid declaration seal on bid declaration format (in lieu of EMD)
Self-certified Make in India component documentation (Annexure A(I))
OEM authorization letter for non-OEM bidders
GST registration certificate and GST invoice copy uploaded on GeM
Technical compliance certificates (as applicable to electronic cards)
Experience certificates and financial statements (as per eligibility)
PAN card copy and GST details; corporate details
Inspection readiness documents and product identifications (Name Plate, Machine Part No., ID)
Key insights about ODISHA tender market
Bidders must be OEM or authorized dealers with bid authorization for non-OEM; submit bid declaration seal in place of EMD, Annexure A(I) Make in India documents, GST registration, and GeM GST invoice uploads. Delivery is 12 weeks from PO with firm pricing; warranty terms are 12 months post-installation or 18 months from supply.
Required documents include bid declaration seal, OEM authorization (if not OEM), Make in India Annexure A(I), GST registration and GST invoice copy, PAN, financial statements, experience certificates, and technical compliance certificates for electronic cards. Ensure GeM portal uploads for GST payment evidence.
The scope covers Electronic Card assemblies: HF Welder Control Board, PCB DC-2, PCB DC-1. Specific performance metrics are not listed, but joint inspection is mandatory, name plate, machine part number and ID verification at Central Stores, MM, RSP. Ensure OEM compliance and Make in India certifications per Annexure A(I).
Delivery must be completed within 12 weeks from the date of PO, i.e., approximately 90 days. Pack items securely to prevent transit damage and align with the 12-month installation-based warranty or 18-month supply warranty, whichever is earlier.
Warranty spans 12 months from installation or 18 months from supply date, whichever occurs earlier. This applies to all items under procurement, with verification during post-delivery inspection at RSP stores and adherence to the RPN clause for non-performance.
Bidders must provide OEM authorization if not the OEM, and Make in India self-certifications per Annexure A(I). GST compliance is mandatory, with invoice copies uploaded on GeM. Ensure ISO/industry certifications applicable to electronic card assemblies and proper inspection readiness documentation.
Hindustan Aeronautics Limited (hal)
📍 KORAPUT, ODISHA
Indian Army
📍 KANGRA, HIMACHAL PRADESH
National Fertilizers Limited (nfl)
📍 BATHINDA, PUNJAB
N/a
📍 RAMPUR, UTTAR PRADESH
Indian Army
📍 RANCHI, JHARKHAND
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS