TenderDekho Logo
GEM

Indian Army Department Of Military Affairs LV3 LV7 Vehicle Spare Parts Tender 2026 Rajasthan

Bid Publish Date

17-Jun-2026, 10:05 am

Bid End Date

27-Jun-2026, 11:00 am

Location

JODHPUR , RAJASTHAN

Progress

Issue17-Jun-2026, 10:05 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

24

Category

LV3 R90 SEAL RING

Bid Type

Two Packet Bid

Tender Overview

The procurement is issued by the Indian Army under the Department Of Military Affairs for several vehicle spare parts portions including LV3 R90 SEAL RING, LV7 TATA STORME COMPRESSOR ASY, LV7 TATA STORME EXPENSIVE VALVE, LV7 MARUTI MOTOR ASY STARTING, and LV7 TATA AIR CLEANER FILTER. The tender scope shows multiple item categories with no explicit quantity or value published in the BOQ, but provides a framework for quantity adjustment up to 25% at contract award and during the contract period. The terms emphasize compliance with turnover criteria, past project experience, and a requirement to submit a product sample before the bid deadline. Bidders should prepare to demonstrate financial stability and prior experience in supplying or servicing similar military vehicle components, with delivery timelines aligned to the option clause. The tender highlights a strong focus on accountability, verifiable experience, and documented performance in line with government procurement norms.

Technical Specifications & Requirements

  • No explicit product specifications published; bidders should rely on item naming to infer scope: LV3 LV7 vehicle components and filters.
  • Key administrative requirements include turnover data for the last three financial years, with audited balances or CA/Cost Accountant certificates.
  • Past experience can be evidenced via contract copies, client execution certificates, or third-party validation notes.
  • An ATC clause requires submission of a sample before the bid submission deadline.
  • The option clause allows quantity fluctuation up to 25% at order and during the contract, with recalculated delivery periods based on the original delivery window. Definitions of delivery commence from the last date of the original order.

Terms, Conditions & Eligibility

  • EMD amount is not specified in the data; bidders should verify whether an EMD is applicable and the amount.
  • Turnover: minimum average annual turnover over the last three years must meet bid document criteria, supported by audited statements or CA certificate.
  • Experience: proof may include contract copies with invoices, client execution certificates, or equivalent documents.
  • Sample submission: bidder must provide a sample prior to bid closing; material acceptance is at the purchaserโ€™s discretion.
  • Delivery terms align with the option clause; extended delivery time calculations are tied to quantity changes and original delivery period, with a minimum of 30 days.
  • Additional ATC clauses may apply, and acceptance/ rejection rights are reserved by the purchaser.

Key Specifications

  • Product/service names from tender: LV3 R90 SEAL RING, LV7 TATA STORME COMPRESSOR ASY, LV7 TATA STORME EXPENSIVE VALVE, LV7 MARUTI MOTOR ASY STARTING, LV7 TATA AIR CLEANER FILTER

  • Quantity/value: not disclosed; quantity may be adjusted up to 25% during contract

  • Standards/certifications: Not specified inBOQ; bidders should confirm compliance with any applicable BIS/IS/ISO requirements per item category

  • Delivery: timeline recalculated based on original delivery period; minimum 30 days

  • Experience: proof through contracts, client certificates, third-party notes

  • Sample: mandatory submission before bid closing

  • ATC: bidder must follow additional terms; acceptance/rejection reserved by purchaser

Terms & Conditions

  • Option clause permits +/-25% quantity adjustment at contract award and during currency

  • Turnover must meet three-year average criteria with audited or CA-certified evidence

  • Past project experience must be proven via specified documents or equivalents

  • Sample submission is mandatory prior to bid deadline

  • Delivery timelines recalculated based on original delivery period; minimum 30 days

  • Purchaser reserves right to accept or reject material per ATC

Important Clauses

Payment Terms

Not specified in data; bidders should seek explicit terms in final bid documents

Delivery Schedule

Delivery periods may extend with option quantity; extended time formula: (Increased quantity รท Original quantity) ร— Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in data; bidders must review final ATC for LD provisions

Bidder Eligibility

  • Minimum average turnover as per bid document for last three financial years

  • Evidence of past experience in supplying or servicing similar components

  • Capability to submit required sample before bid deadline

  • Compliance with organizational procurement norms and approval from Indian Army

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

LV3 R90 SEAL RING , LV7 TATA STORME COMPRESSOR ASSY , LV7 TATA STORME EXPENSIVE VALVE , LV7 MARUTI MOTOR ASSY STARTING , LV7 TATA AIR CLEANER FILTER

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support โ€” bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation ยท 24h response

Documents 4

GeM-Bidding-9478705.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

LV7 MARUTI BEARING,LV7 TATA STORME STRG OIL SEAL R KIT,LV7 SCORPIO INJECTOR NOZZLE,LV7 TATA STORME

Indian Army

JODHPUR, RAJASTHAN

Posted: 5 June 2026
Closed: 15 June 2026
GEM

LV7 TATA STORME ASSY KIT LINED SHOE,LV7 TATA STORME FILTER FUEL,LV7 TATA STORME BELT TENSNOR,LV7 T

Indian Army

JODHPUR, RAJASTHAN

Posted: 27 February 2026
Closed: 9 March 2026
GEM

LV7 TATA STORME WATER SEPRATOR,LV7 TATA STORME AIR FILTER,LV7 TATA STORME INTERCOOLER,LV7 T 815 EQU

Indian Army

JODHPUR, RAJASTHAN

Posted: 27 February 2026
Closed: 9 March 2026
GEM

Indian Army Department Of Military Affairs LV7 Vehicle Spare Parts Tender 2026 - Maruti Valve Guide, Scorpio Head Light, Tata Storme Hoses & More

Indian Army

JODHPUR, RAJASTHAN

Posted: 6 June 2026
Closed: 16 June 2026
GEM

LV7 TATA STORME OIL FILTER,LV7 TATA STORME WIPER BLADE REAR,LV7 TATA STORME RUBBER HOSE UC PIPE,LV7

Indian Army

JODHPUR, RAJASTHAN

Posted: 25 August 2025
Closed: 4 September 2025
GEM

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

LV3 R90 SEAL RING

LV3 R90 SEAL RING

20 nos Delivery: 15 days
#2

LV7 TATA STORME COMPRESSOR ASSY

LV7 TATA STORME COMPRESSOR ASSY

1 nos Delivery: 15 days
#3

LV7 TATA STORME EXPENSIVE VALVE

LV7 TATA STORME EXPENSIVE VALVE

1 mtr Delivery: 15 days
#4

LV7 MARUTI MOTOR ASSY STARTING

LV7 MARUTI MOTOR ASSY STARTING

1 nos Delivery: 15 days
#5

LV7 TATA AIR CLEANER FILTER

LV7 TATA AIR CLEANER FILTER

1 nos Delivery: 15 days

๐Ÿค– AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for the last three financial years or CA/Cost Accountant certificate indicating turnover

4

Past experience proof: contract copies with invoices and client execution certificates or equivalent

5

Sample submission before bid deadline

6

OEM authorization or supplier certifications if applicable

7

Any other documents specified under ATC (if provided in terms)

Frequently Asked Questions

How to bid for Indian Army vehicle parts tender in 2026?

Bidders should ensure turnover proof for three years, provide contract-based experience documents, submit the required sample before bid closing, and comply with ATC clauses. Confirm that the supplied LV3 LV7 parts meet any applicable standards and be prepared for quantity adjustments up to 25%.

What documents are required for Indian Army LV3 LV7 parts tender 2026?

Submit GST certificate, PAN, audited financial statements or CA certificate showing turnover, past experience proofs (contracts and client certificates), sample, OEM authorizations if applicable, and any ATC-specified documents. Ensure all documents are current and properly scanned for online upload.

What are the delivery requirements for Army vehicle spares tender 2026?

Delivery is linked to the option clause; quantity may increase up to 25% and delivery time recalculated as (Increased quantity รท Original quantity) ร— Original delivery period, with a minimum of 30 days. Deliverables must align with purchaserโ€™s acceptance criteria.

What is the EMD requirement for this Indian Army procurement?

EMD details are not specified in the provided terms; bidders must verify the exact amount or confirm if EMD is required in the final bid documents and prepare payment accordingly.

Which past-experience proofs are acceptable for Army vehicle parts?

Acceptable proofs include contract copies with invoices and bidder self-certification, execution certificates from clients, or third-party inspection notes. These documents demonstrate successful delivery of similar spares to military or government clients.

What samples must be submitted for the Army spares bid in 2026?

A physical or validated digital sample of the LV3 LV7 components must be delivered before bid closing as per ATC. Samples enable evaluation of conformity to specifications and fit-for-purpose performance in military applications.

What standards are required for the LV7 Tata Storme parts bid?

No explicit standards are published in the tender; bidders should prepare to provide conformity statements and ensure parts are traceable to suppliers with clear documentation, aligning with IS or ISO where applicable to automotive spares.

When is the bid submission deadline for Indian Army vehicles spares?

Deadline dates are not provided in the data; bidders must check the final bid documents or consult the procurement portal for exact submission timelines and any late bid penalties.

Similar Tenders

5 found

LV7 TATA STORME CAP,LV3 R72 GASKET,LV7 TMB CE BUSH,LV2 ICVS SLEEVE SEAL CUPLER,LV7 T 815 RESISTOR,E

Indian Army

๐Ÿ“ JODHPUR, RAJASTHAN

โฐ Deadline: 2 weeks left
๐Ÿ›’ Type: Goods
View GEM
Urgent

Clutch plate ALS,Pressure plate ALS,Pressure plate TATA,Wiper blades TATA,Fuel filter main body TAT

Indian Army

๐Ÿ“ POONCH, JAMMU & KASHMIR

โฐ Deadline: 6 days left
๐Ÿ›’ Type: Goods
View GEM

Indian Army Department of Military Affairs Dehradun Air Filter and Clutch Components Tender 2026 ISO 9001 BIS

Indian Army

๐Ÿ“ DEHRADUN, UTTARAKHAND

โฐ Deadline: 2 weeks left
๐Ÿ›’ Type: Goods
View GEM
Urgent

Piston Ring Set,Eng Gaskit,Oil Filter,Turbocharger Assy,De-reation Assy,Valve Seal

Indian Army

๐Ÿ“ KARGIL, JAMMU & KASHMIR

Est: โ‚น38,652
โฐ Deadline: 6 days left
๐Ÿ›’ Type: Goods
View GEM

Oil Filter assy,Chain Sprocket Kit,Hose,Regulator Veh Window,Voltage regulator 24V,Assy Kit for wip

Indian Army

๐Ÿ“ JALPAIGURI, WEST BENGAL

Est: โ‚น96,561
โฐ Deadline: 2 weeks left
๐Ÿ›’ Type: Goods
View GEM

Explore More Opportunities

Quick Access