Rubber Square gasket 5mm,Magnetic Sheet 300mmx300mmx2mm,Card Board Gaskets,SHEET,NEOPRENE,THK 4MM,C
Hindustan Petroleum Corporation Ltd
DHARMAPURI, TAMIL NADU
Bid Publish Date
22-Nov-2025, 5:55 pm
Bid End Date
17-Dec-2025, 12:00 pm
EMD
₹2,74,410
Value
₹1,37,20,508
Location
Progress
Quantity
100
Category
Supply of materials as per IS standard for complete epoxy painting single coat primer double coat paint of each transformer
Bid Type
Two Packet Bid
North Eastern Electric Power Corporation Limited (Hydro Power division) invites bids for the supply of comprehensive transformer maintenance materials and associated components. The scope includes gaskets, O rings, Teflon, washers, bushings, PTFE tape, epoxy painting supplies (single coat primer, double coat paint on each transformer), Buchholz relays, MOG, Breathers with silica gel, oil temperature and winding temperature indicators, pressure relief valves, HT/LT/neutral bushings, OCTC, prismatic gauges, WTI CT, aircell, complete marshalling box with new parts, radiators, valves, HV turret CT, LV turret base plate, support insulator, radiator assembly, hardware, site overhauling charges for a 12.5 MVA transformer, and NABL-lab oil testing. Estimated value: ₹13,72,0508; EMD: ₹274,410. Location: WEST TRIPURA, TRIPURA - 799001. 24-item BOQ indicated. No explicit specifications provided beyond IS standard painting and transformer components. Unique inclusion of NABL oil testing and complete transformer overhaul scope differentiates this tender.
BOQ contains 24 items including gaskets, O rings, Teflon, washers, bushings, sealants, and associated transformer components
Epoxy painting scope: single coat primer + double coat paint per transformer
NABL-approved oil testing requirement for transformer oil
Site overhauling charges for a 12.5 MVA transformer
HV/LV bushings, neutral bushing, radiator valves, radiators, marshalling box with new parts
EMD: ₹274,410 must accompany bid; bid security terms per ATC
Estimated contract value: ₹13,72,0508; final value subject to BOQ
NABL oil testing and IS-standard painting requirements form core scope
Payment terms to be defined in ATC; bidders should verify milestones and tender payment schedule
Delivery timelines to be specified in ATC; site overhauling of 12.5 MVA transformer included
LD terms, warranties, and AMC specifics to be confirmed in ATC
Experience in supplying transformer maintenance components or similar electrical equipment
Demonstrated ability to perform on-site transformer overhaul or related works
Financial stability with requisite turnover or balance sheet strength
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply of gaskets, O ring, Teflon, washer, Bushing seal, Teflon tape,Flex-kwik, Devgun putty , Supply of materials as per IS standard for complete epoxy painting single coat primer double coat paint of each transformer , Bucholz Relay , MOG , Breather with silica gel , Oil Temperature Indicator , Winding Temperature Indicator , Pressure Relief Valve , HT Bushing , LT Bushing , Neutral Bushing , OCTC , Prismatic Gauge , WTI CT , Aircell , Complete Marshalling box with all new parts , Radiator valves , HV Turret CT , LV Turret Base Plate , Support Insulator , Radiator , Hardware , Site overhauling charges for 12.5MVA Transformer , Oil Testing from NABL Approved Lab
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
DHARMAPURI, TAMIL NADU
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Indian Army
DHEMAJI, ASSAM
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
DIMAPUR, NAGALAND
Tender Results
Loading results...
Supply of gaskets, O ring, Teflon, washer, Bushing seal, Teflon tape,Flex-kwik, Devgun putty
Supply of gaskets, O ring, Teflon, washer, Bushing seal, Teflon tape,Flex-kwik, Devgun putty
Supply of materials as per IS standard for complete epoxy painting single coat primer double coat paint of each transformer
Supply of materials as per IS standard for complete epoxy painting single coat primer double coat paint of each transformer (i.e. main tank, conservator, radiators etc.)
Bucholz Relay
Bucholz Relay
MOG
MOG
Breather with silica gel
Breather with silica gel. (10 KG)
Oil Temperature Indicator
Oil Temperature Indicator (OTI) with PT-100 Sensor
Winding Temperature Indicator
Winding Temperature Indicator (WTI) with PT-100 Sensor
Pressure Relief Valve
Pressure Relief Valve (PRV)
HT Bushing
HT Bushing
LT Bushing
LT Bushing
Neutral Bushing
Neutral Bushing
OCTC
OCTC
Prismatic Gauge
Prismatic Gauge
WTI CT
WTI CT
Aircell
Aircell
Complete Marshalling box with all new parts
Complete Marshalling box with all new parts
Radiator valves
Radiator valves (10 Nos. each)
HV Turret CT
HV Turret CT
LV Turret Base Plate
LV Turret Base Plate
Support Insulator
Support Insulator
Radiator
Radiator
Hardware
Hardware (GI Nut Bolts & Washers)
Site overhauling charges for 12.5MVA Transformer
Site overhauling charges for 12.5MVA Transformer
Oil Testing from NABL Approved Lab
Oil Testing from NABL Approved Lab
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of gaskets, O ring, Teflon, washer, Bushing seal, Teflon tape,Flex-kwik, Devgun putty | Supply of gaskets, O ring, Teflon, washer, Bushing seal, Teflon tape,Flex-kwik, Devgun putty | 4 | nos | storeswingagtccpp | 150 | |
| 2 | Supply of materials as per IS standard for complete epoxy painting single coat primer double coat paint of each transformer | Supply of materials as per IS standard for complete epoxy painting single coat primer double coat paint of each transformer (i.e. main tank, conservator, radiators etc.) | 4 | nos | storeswingagtccpp | 150 | |
| 3 | Bucholz Relay | Bucholz Relay | 4 | nos | storeswingagtccpp | 150 | |
| 4 | MOG | MOG | 4 | nos | storeswingagtccpp | 150 | |
| 5 | Breather with silica gel | Breather with silica gel. (10 KG) | 4 | nos | storeswingagtccpp | 150 | |
| 6 | Oil Temperature Indicator | Oil Temperature Indicator (OTI) with PT-100 Sensor | 4 | nos | storeswingagtccpp | 150 | |
| 7 | Winding Temperature Indicator | Winding Temperature Indicator (WTI) with PT-100 Sensor | 4 | nos | storeswingagtccpp | 150 | |
| 8 | Pressure Relief Valve | Pressure Relief Valve (PRV) | 4 | nos | storeswingagtccpp | 150 | |
| 9 | HT Bushing | HT Bushing | 4 | nos | storeswingagtccpp | 150 | |
| 10 | LT Bushing | LT Bushing | 8 | nos | storeswingagtccpp | 150 | |
| 11 | Neutral Bushing | Neutral Bushing | 4 | nos | storeswingagtccpp | 150 | |
| 12 | OCTC | OCTC | 1 | nos | storeswingagtccpp | 150 | |
| 13 | Prismatic Gauge | Prismatic Gauge | 4 | nos | storeswingagtccpp | 150 | |
| 14 | WTI CT | WTI CT | 1 | nos | storeswingagtccpp | 150 | |
| 15 | Aircell | Aircell | 4 | nos | storeswingagtccpp | 150 | |
| 16 | Complete Marshalling box with all new parts | Complete Marshalling box with all new parts | 4 | nos | storeswingagtccpp | 150 | |
| 17 | Radiator valves | Radiator valves (10 Nos. each) | 4 | sets | storeswingagtccpp | 150 | |
| 18 | HV Turret CT | HV Turret CT | 4 | nos | storeswingagtccpp | 150 | |
| 19 | LV Turret Base Plate | LV Turret Base Plate | 2 | nos | storeswingagtccpp | 150 | |
| 20 | Support Insulator | Support Insulator | 12 | nos | storeswingagtccpp | 150 | |
| 21 | Radiator | Radiator | 4 | nos | storeswingagtccpp | 150 | |
| 22 | Hardware | Hardware (GI Nut Bolts & Washers) | 4 | sets | storeswingagtccpp | 150 | |
| 23 | Site overhauling charges for 12.5MVA Transformer | Site overhauling charges for 12.5MVA Transformer | 4 | nos | eciwingagtccpp | 330 | |
| 24 | Oil Testing from NABL Approved Lab | Oil Testing from NABL Approved Lab | 4 | nos | eciwingagtccpp | 330 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar transformer maintenance / supply projects
Financial statements (audited) or turnover evidence
EMD submission receipt of ₹274,410
Technical bid documents showing compliance with IS painting standards
OEM authorizations or authorized distributor certificates for supplied items
Any NABL oil testing certifications or lab partner details (if required)
Extended Deadline
17-Dec-2025, 12:00 pm
Opening Date
17-Dec-2025, 12:30 pm
Extended Deadline
10-Dec-2025, 12:00 pm
Opening Date
10-Dec-2025, 12:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | TELAWNE CROMPTEK ELECTRICALS PRIVATE LIMITED Under PMA | - | 16-12-2025 16:54:36 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | TELAWNE CROMPTEK ELECTRICALS PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply of gaskets, O ring, Teflon, washer, Bushing seal, Teflon tape,Flex-kwik, Devgun putty,Supply |
Key insights about TRIPURA tender market
Bidders must submit GST, PAN, experience certificates, and financial statements along with EMD ₹274,410. Ensure IS-standard painting compliance and NABL oil testing readiness. Review ATC for itemized BOQ details, OEM authorizations, and site-overhaul terms for the 12.5 MVA transformer.
Required documents include GST registration, PAN, experience certificates of similar work, financial statements, EMD receipt, technical bid, OEM authorizations, and potential NABL oil testing certificates. Ensure bid pack aligns with IS painting standards and site-overhaul scope for 12.5 MVA transformer.
The EMD is ₹274,410. Submit via online payment or bank guarantee as per ATC. Ensure validity through bid submission and attach EMD receipt in the technical bid folder, along with other required bid security documents.
The tender requires epoxy painting per IS standard for transformer surfaces, including a single coat primer and a double coat finish. Confirm exact IS numbers in the ATC and ensure surface preparation, curing times, and coating thickness meet specified guidelines.
Delivery timelines are defined in the ATC. Bidders should anticipate on-site delivery and installation schedules accompanying site-overhaul of a 12.5 MVA transformer, with testing and commissioning as part of after-sales support.
NABL oil testing is required for transformer oil as part of quality assurance. Bidders must either provide testing services or partner with NABL-lab accredited facilities to certify oil quality before or after commissioning, with results packaged in bid documentation.
Indian Coast Guard
📍 CHENNAI, TAMIL NADU
Border Security Force (bsf)
📍 KACHCHH, GUJARAT
Border Security Force (bsf)
📍 JAISALMER, RAJASTHAN
Indian Navy
📍 VISAKHAPATNAM, ANDHRA PRADESH
Indian Coast Guard
📍 SOUTH ANDAMAN, ANDAMAN & NICOBAR
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS