Schedule - 1 - 1000 KVA, 3.3 KV/433V, DRY TYPE TRANSFORMER,Schedule - 2 - 2500 KVA, 11 KV/3.3KV, DR
Moil Limited
BALAGHAT, MADHYA PRADESH
Bid Publish Date
27-Jun-2026, 4:28 pm
Bid End Date
18-Jul-2026, 3:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Hindustan Copper Limited. Product: Dry Type Transformer, 500KVA, 3.3 kV/433 V, indoor type. Location: Balaghat, Madhya Pradesh 481001. Estimated Value: Not disclosed. EMD: Not disclosed. Tender scope centers on supply of an indoor dry-type transformer with specified rating, under Buyer added terms enabling quantity variations up to 25% and extended delivery windows. The ATC emphasizes strict adherence to technical and contractual terms and references a supply-ordained delivery period computed from the original period, with minimum 30 days. The BOQ shows zero items, indicating a straight-forward single-item procurement. The tender includes buyer-specific ATC documents and an option clause essential for bidders to price adjustments during contract execution. Unique aspect: no BOQ items and a robust option clause governing quantity and timing. This tender suits electrical equipment suppliers with experience in medium-voltage dry-type transformers and alignment to internal procurement standards.
Dry Type Transformer
Rating: 500KVA
Voltage: 3.3 kV / 433 V
Configuration: indoor type
Delivery/extension terms governed by option clause; 30-day minimum extension
EMD/price details not disclosed
EMD amount and exact payment terms are not disclosed in the data; bidders should seek clarification during pre-bid.
Option Clause permits 25% quantity variation and extended delivery with a defined time formula; bidders must plan flexible capacity.
Delivery schedule hinges on last date of original order; extended time may be calculated, minimum 30 days guaranteed.
Experience in supplying medium-voltage dry-type transformers (indoor) of similar rating
Financial capacity to support bid and potential variations under 25% quantity clause
Registration under GST with valid certificate and tax compliance
Ability to meet internal delivery terms and ATC requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Dry Type Transformer, 500KVA, 3.3 kV/433 volts, indoor type as per detailed description
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Moil Limited
BALAGHAT, MADHYA PRADESH
Hindustan Copper Limited
Cochin Shipyard Ltd
ERNAKULAM, KERALA
Munitions India Limited
PUNE, MAHARASHTRA
Munitions India Limited
PUNE, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing prior supply of similar transformers
Financial statements for the last 1-2 years
EMD submission proof (if applicable per undisclosed amount)
Technical bid documents showing compliance with ATC
OEM authorization / manufacturer authorization (if bidding as authorized dealer)
Key insights about MADHYA PRADESH tender market
Bidders should prepare technical bid demonstrating compliance with the 500KVA indoor dry-type transformer (3.3 kV/433 V). Include OEM authorizations, GST, PAN, financials, and experience certificates. Submit per ATC terms; address the 25% quantity option and extended delivery provisions.
Required documents include GST certificate, PAN, experience certificates for similar transformers, financial statements, OEM authorization, and technical bid detailing compliance with the ATC. EMD documentation should be provided if applicable and available per procurement rules.
Technical scope specifies a 500KVA dry-type transformer with indoor installation capability, rated at 3.3 kV primary and 433 V secondary. While explicit standards are not listed, bidders must ensure compliance with internal ATC and supply per the defined rating.
The option clause allows up to 25% quantity variation and a corresponding delivery time extension calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, unless the original period is shorter.
EMD amount is not disclosed in the current data. Payment terms are not specified; bidders should await detailed terms in the ATC and terms section, and ensure compliance with standard government procurement finance cycles.
Bidders must quote strictly per technical specification and Buyer Added ATC. Prepare bid documents showing adherence to the ATC, including any OEM authorizations, quality tests, and delivery terms. Ensure the quote reflects the option clause pricing if applicable.
Hindustan Copper Limited
📍 BALAGHAT, MADHYA PRADESH
📍 TELANGANA
Directorate of Urban Affairs
📍 THRISSUR, KERALA
📍 Maharashtra
Bhakra Beas Management Board
📍 MANDI, HIMACHAL PRADESH
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS