Digital Multimeter
Hindustan Aeronautics Limited (hal)
LUCKNOW, UTTAR PRADESH
Bid Publish Date
25-Jun-2026, 4:42 pm
Bid End Date
06-Jul-2026, 9:00 am
Location
Progress
Quantity
2
Bid Type
Single Packet Bid
North Eastern Railway invites bids for Digital Multimeter (Q3) in GORAKHPUR, UTTAR PRADESH. Quantity: 2. Submission Deadline: 06-07-2026 09: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Digital Multimeter (Q3)
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Aeronautics Limited (hal)
LUCKNOW, UTTAR PRADESH
Bharat Dynamics Limited
HYDERABAD, TELANGANA
Durgapur Steel Plant
Indian Space Research Organization
THIRUVANANTHAPURAM, KERALA
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| MEASUREMENTS | DC Voltage Range | 1000.0 |
| MEASUREMENTS | DC Voltage Accuracy | 0.005 |
| MEASUREMENTS | DC Voltage resolution | 0.001 |
| MEASUREMENTS | AC Voltage Range | 1000.0 |
| MEASUREMENTS | AC Voltage Accuracy | 0.5 |
| MEASUREMENTS | AC Voltage resolution | 0.001 |
| MEASUREMENTS | DC Current Range | 10.0 |
| MEASUREMENTS | DC Current Accuracy | 0.05 |
| MEASUREMENTS | DC Current resolution | 0.001 |
| MEASUREMENTS | AC Current Range | 10.0 |
| MEASUREMENTS | AC Current Accuracy | 0.5 |
| MEASUREMENTS | AC Current resolution | 0.001 |
| MEASUREMENTS | Resistance Range | 500.0 |
| MEASUREMENTS | Resistance Accuracy | 0.08 |
| MEASUREMENTS | Resistance resolution | 0.01 |
| MEASUREMENTS | Capacitance Range ( Micro farad ) | .01 to 1000 |
| MEASUREMENTS | Capacitance Accuracy ( % ) | 1.5 |
| MEASUREMENTS | Capacitance resolution ( nF ) | 0.001 |
| MEASUREMENTS | Frequency Range ( KHz ) | 1000 |
| MEASUREMENTS | Frequency Accuracy ( % ) | 0.1 |
| MEASUREMENTS | Frequency resolution ( Hz ) | 0.001 |
| MEASUREMENTS | Temperature Range ( Degree C ) | -50 to 1000 |
| MEASUREMENTS | Temperature Accuracy ( % ) | 1.5 |
| MEASUREMENTS | Temperature resolution ( Degree C ) | 0.1 |
| FEATURES | Type | Hand Held |
| FEATURES | Display (Digits) | 4.5 |
| FEATURES | Measurement Type | True RMS |
| FEATURES | Counts | 50000, 60000, 70000, 80000, 90000, 100000, 200000, 20000000 Or higher |
| OTHER FEATURES | Continuity test and Diode test | Available |
| SAFETY | Safety Rating | Category III 600 V of IEC 61010. |
| POWER REQUIREMENTS | Power Requirements | Battery Operated |
| POWER REQUIREMENTS | if Battery Operated, then Type of Battery | Non- Rechargeable (Alkaline) |
| POWER REQUIREMENTS | if rechargeable , then chemistry of the battery | NA |
| POWER REQUIREMENTS | if Non-rechargeable , then size of the battery / cell | 9-V rectangular battery |
| POWER REQUIREMENTS | number of non- rechargeable the battery / cell | 1 |
| POWER REQUIREMENTS | Suitable charger / adaptor provided | NA |
| WARRANTY | Warranty | 3.0 |
| OPERATING CONDITION | Minimum Operating Temperature | -20.0 |
| OPERATING CONDITION | Maximum Operating Condition | 55.0 |
| OPERATING CONDITION | Operating Humidity (RH) | 90.0 |
| TEST REPORT DETAILS | The equipment supplied with calibration certificate | YES |
| TEST REPORT DETAILS | conformity to Dry Heat for 16 hrs at a specified maximum temp in accordance with IS:9000/part-3/section-5/1977 latest | Yes |
| TEST REPORT DETAILS | conformity to Cold Test for 4 hrs at a specified minimum temp in accordance with IS:9000/part-2/section-4/1977 latest | Yes |
| TEST REPORT DETAILS | conformity to Damp Heat (Cyclic)Test for 2 Cycles of 24 hrs each at a temp of 40 degree C & 95% RH | Yes |
| TEST REPORT DETAILS | Availability of Test Reports from Central Govt/NABL/ILAC approved accredited lab to prove conformity to the specification | Yes |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Oil India Limited
๐ DIBRUGARH, ASSAM
Office Of Dg (aero)
๐ BANGALORE, KARNATAKA
South East Central Railway
๐ BILASPUR, CHHATTISGARH
Hindustan Aeronautics Limited (hal)
๐ SULTANPUR, UTTAR PRADESH
Indian Space Research Organization
๐ AHMEDABAD, GUJARAT
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS