Leg Press - Outdoor Gym Equipments,Parallel Bar - Outdoor Gym Equipment,Twister - Outdoor Gym Equi
Rural Development Department
VAISHALI, BIHAR
Progress
Quantity
6
Category
Leg Press - Outdoor Gym Equipments
Bid Type
Two Packet Bid
The invitation is issued by Samastipur District Panchayats under the Department Of Panchayati Raj for multiple outdoor gym equipment items, including Leg Press, Parallel Bar, Twister, Chest Press, Shoulder Builder/Arm Wheel, and Sit Up Board in Samastipur, Bihar (PIN 848101). The procurement emphasizes premium GI-frame construction with ISI marked GI pipes and compliance to IS 1239 and IS 1161 for all structural components, plus required installation. The package scope includes complete assembly, field installation, and a focus on safety and durability through certified materials and warranty provisions. A notable feature is the option clause allowing quantity variation up to 25% during contract execution, with delivery timelines adjustable accordingly. The absence of BOQ items suggests a broad equipment category procurement with standardized frames and safety standards as the primary differentiator. This tender targets local suppliers capable of manufacturing or assembling outdoor gym frames to order and deliver with quality assurances.
Outdoor gym equipment types: Leg Press, Parallel Bar, Twister, Chest Press, Shoulder Builder/Arm Wheel, Sit Up Board
Governing GI pipe standards: IS 1239; pipe class and nominal bore as per IS 1239/IS 1161
All GI pipes must be ISI marked
Foundation pipes with anchoring and MS Foundation Plate Thickness
Installation inclusive as part of supply with safety certifications
Option clause allows ±25% quantity variation during contract
Detailed Design Drawings must be approved within 7 days of award
Pre-dispatch inspection arranged by Buyer with potential external lab testing
Warranty terms are required but specific years are not disclosed
IS and material standards emphasize ISI GI pipes and IS 1239/1161 compliance
Not specified in data; bidders should anticipate standard advance/ milestone payments per Buyer terms and negotiated at contract signing.
Delivery period may be adjusted if quantity changes; minimum extension criteria defined by (increased quantity ÷ original quantity) × original delivery period with a 30-day minimum.
Not specified in data; penalties typically apply for late delivery or non-conformance as per Buyer terms.
Not under liquidation, bankruptcy, or court receivership
Demonstrable experience in supplying outdoor gym equipment or similar structural steel assemblies
GST registration and valid financial statements for the last 3 years
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Leg Press - Outdoor Gym Equipments (Q3) , Parallel Bar - Outdoor Gym Equipment (Q3) , Twister - Outdoor Gym Equipment (Q3) , Chest Press - Outdoor Gym Equipments (Q3) , Shoulder Builder / Arm Wheel - Outdoor Gym Equipment (Q3) , Sit Up Board - Outdoor Gym Equipment (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Rural Development Department
VAISHALI, BIHAR
Rural Development Department
KHAGARIA, BIHAR
Rural Development Department
KHAGARIA, BIHAR
Panchayati Raj Department
BEGUSARAI, BIHAR
Rural Development Department
SAMASTIPUR, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| TYPE | Type | Leg Press Double |
| CAPACITY | Maximum User Weight ( Kg ) | 100.0 |
| MATERIAL | Governing Specification for GI Pipes | BIS specification No IS 1161:2014, latest |
| MATERIAL | All the GI Pipes are ISI marked | No |
| MATERIAL | Main Central Pipe | 150mm Nominal Bore G.I. Pipe |
| MATERIAL | Main Central Pipe, Class as per IS 1239 | Heavy |
| MATERIAL | Moving Frame Pipe | 40mm Nominal bore G.I. pipe |
| MATERIAL | Moving Frame Pipe, Class as per IS 1239 | Heavy |
| MATERIAL | Foot Rest Frame/ Foot Rest Hinging Pipe | 25mm Nominal Bore G.I. Pipe |
| MATERIAL | Foot Rest Frame Pipe, Class as per IS 1239 | Not applicable for M.S. Plates |
| MATERIAL | Connecting Links | 40mm Nominal Bore G.I. Pipe |
| MATERIAL | Connecting Links Pipe, Class as per IS 1239 | Heavy |
| MATERIAL | MS Foundation Plate Thickness | 10.0 |
| MATERIAL | Foundation Pipes with anchoring | 750mm deep GI Pipe, supported with M.S. Angle 25 X 25 X 4mm |
| MATERIAL | Nominal Bore of Foundation Pipe | 150mm |
| MATERIAL | Foundation Pipe, Class as per IS 1239 | Heavy |
| MATERIAL | Bearings | Tapered Roller Bearing |
| MATERIAL | Seat and Back Rest | 3mm thick, HDPE with uniform bending radius to avoid sharp edges |
| OTHER REQUIREMENTS | Installation | Not Included |
| CERTIFICATION | Certfication ( Safety and Quality Requirements ) | No |
| WARRANTY | Warranty ( years ) | 3.0 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar outdoor gym equipment supplies
Financial statements for last 3 years
EMD/security deposit details
Technical bid/technical compliance certificates
OEM/authorized dealer authorizations
Any safety/quality certifications relevant to ISI GI pipe standards
Key insights about BIHAR tender market
Bidders should align with ISI GI pipe standards, IS 1239/IS 1161 material requirements, and installation scope. Prepare GST certificate, PAN, experience certificates, financials, OEM authorizations, and EMD documents. Ensure Detailed Design Drawings are approved within 7 days of award; delivery terms follow 25% quantity variation rules.
Submit GST registration, PAN, company financial statements for 3 years, experience certificates for similar outdoor gym projects, EMD, technical bid, OEM authorizations, and safety/quality certifications. Include ISI Mark certificates for GI pipes and IS 1239/IS 1161 compliance documentation.
Standards include IS 1239 for central and foundation pipes, IS 1161 for pipe material, and ISI marking for GI pipes. Equipment frames must comply with these standards, and safety certifications are required under the Safety and Quality Requirements clause.
Within 7 days of award, the bidder must submit Detailed Design Drawings for Buyer's approval. If modifications are requested, the seller must address them promptly; approval or modification list provided within 7 days to avoid schedule slippage.
The purchaser may increase or decrease the bid quantity by up to 25% at the time of contract and during the currency of the contract at contracted rates. Delivery period adjustments follow the same proportional logic with a minimum 30 days extension rule.
Installation is included as part of scope; pre-dispatch inspection by Buyer or external agency may be conducted. The address for delivery/installation will be provided by the Buyer; ensure on-site readiness and compliance with ISI standards and warranty terms.
Warranty details are specified as years but not disclosed in the data. Bidders should anticipate standard manufacturer warranties plus post-installation support as part of the contract, with potential AMC terms to be negotiated at award.
Provide ISI marking certificates for all GI pipes, and confirm compliance to IS 1239 and IS 1161 for all pipe sections, including main central, moving frame, and foundation pipes. Attach certification documents in the technical bid package.
Planning And Development Department
📍 SIWAN, BIHAR
Planning And Development Department
📍 ROHTAS, BIHAR
Siwan District Panchayats
📍 GOPALGANJ, BIHAR
Samastipur District Panchayats
📍 SAMASTIPUR, BIHAR
Gopalganj District Panchayats
📍 GOPALGANJ, BIHAR
Sign up now to access all documents
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS