Inflatable Tent
North Central Railway
AGRA, UTTAR PRADESH
Bid Publish Date
08-Jul-2026, 11:35 pm
Bid End Date
13-Jul-2026, 10:00 am
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Border Security Force (BSF) seeks an inflatable tent with permanent arch integration for operations in Baramulla, Jammu & Kashmir (193101). The project covers inflatable tent structures including frame, canopy, and skin, with design drawings, erection time, and sample approvals. Key differentiators include permanent arch attachment to tent cover and floor, and a requirement for warranty and tensile strength compliance. The contract may allow up to 25% quantity variation and requires OEM/authorized seller support in India for imported items. This procurement targets a reliable, IS 550 compliant fabric and robust after-sales service, suitable for rapid deployment in field conditions.
Tent size: outer dimensions (Length x Width x Ridge height x minimum arc diameter)
Permanent arch attachment to tent cover and floor
Operating working pressure of inflatable structure
Tensile strength: warp and weft directions of arch fabric
Tent frame material: aluminium pipes and MS pegs
Accessories: foot pump, packing weight details
Warranty: guaranty certificate provided with each tent
Delivery period may extend with option clause up to original delivery period; minimum 30 days for extended time
OEM turnover criteria: last 3 years turnover must meet bid document requirement
Advance sample approval required prior to bulk supply; in-case of imported items, India-based OEM support required
Contract terms allow revised delivery timelines based on quantity variations up to 25%; payment terms to be detailed in actual RFP
Delivery begins after order and sample approval; extended time calculations apply as per option clause
LD/penalties subject to contract terms; exact rates not specified in available data
OEM or OEM-authorized bidder with demonstrated turnover meeting last 3-year average
Experience in supplying inflatable tents or related field deployment shelters
Compliance with IS 550 fabric standards and tensile strength requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Inflatable Tent (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
North Central Railway
AGRA, UTTAR PRADESH
West Central Railway
KATNI, MADHYA PRADESH
Indian Army
HYDERABAD, TELANGANA
Indian Army
DIMAPUR, NAGALAND
Indian Army
DIMAPUR, NAGALAND
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Tent size (outer side dimension of the tent) (Length X Width X Height at ridge X Minimum Diameter of the inflatable arc) | 24 Feet X 10 Feet X 7 feet X 28 Cm |
| GENERIC | Tent structure | Two doors and four windows – doors and windows can be rolled up (if required) and are equipped with a mosquito net – the door and window closing mechanism will be fitted with heavy duty nylon zips and Velcro taps (for tent 24 feet length), Two doors and two windows – doors and windows can be rolled up (if required) and are equipped with a mosquito net – the door and window closing mechanism will be fitted with heavy duty nylon zips and Velcro taps (for tent of 14 feet length) |
| GENERIC | Design/drawing of inflatable tent | As per drawing – uploaded at GeM drawing (for 24 feet length) |
| GENERIC | Maximum time required for complete erection of tent | 10 to 12 minutes with the help of two persons (for 24 feet length) |
| GENERIC | Each tent supplied with | 10 numbers MS pegs –12 numbers Polyester rope (3.5 mtr each) – 8 numbers. Aluminium pipes – electric air blower – foot pump – hammer – repair kit for the stability of the inflated tent during torrential rain and thunderstorm (for 14 feet length), 12 numbers MS pegs –12 numbers Polyester rope (3.5 mtr each) – 12 numbers Aluminium pipes – electric air blower – 2 numbers foot pump – hammer – repair kit for the stability of the inflated tent during torrential rain and thunderstorm (for 24 feet length) |
| GENERIC | Structure design (tent frame and tent skin) NOTE : ARCHES WILL BE PERMANENTLY ATTACHED TO THE TENT COVER AND FLOOR | Three numbers of individual inflatable air chambers (arch) made out of one side hypalon coated polyester fabric and inside neoprene coated having minimum 1000 GSM ± 50 GSM and the canopy will be one sided PU coated polyester fabric and the floor fabric will be both sides PVC coated polyester fabric (for 14 feet length) |
| GENERIC | Colour | As per buyer’s choice |
| GENERIC | Operating working pressure of the tent | 2.5 psi (pounds per square inch) and there will be no leakage on the joints, As per requirement |
| GENERIC | Approval of Advance sample before Bulk Supply | After award of contract - Seller shall have to get proto type Advance sample approved from Buyer before manufacturing / starting Bulk supplies - Buyer shall approve / provide list of modifications required within 10 days of offer of advance sample - If there is delay in approval of advance sample from Buyer side - the delivery period shall be regularized for the period of delay in sample approval |
| MATERIAL | Tent frame material | One side hypalon coated polyester fabric and inside neoprene coated having minimum 1150 GSM ± 50 GSM (for 24 feet length) |
| ACCESSORIES MATERIAL | All measure item standards | As per requirement |
| ACCESSORIES MATERIAL | Aluminium pipes | 12 numbers Pipe having length of 1.7 mtr to 1.8 mtr – Outer dia 31 mm minimum with 2 mm Wall thickness(for 24 feet length) |
| ACCESSORIES MATERIAL | MS peg | 12 numbers having 300 mm length with 18 mm dia conforming to IS 1875 – latest (for 24 feet length) |
| ACCESSORIES MATERIAL | Foot pump | 2 numbers (for 24 feet length) |
| DIMENSION | Windows dimension (minimum) | As per requirement |
| PACKING | Total weight of product (including packing accessories) | 90 Kgs (for 24 feet length) |
| WARRANTY AND GUARANTY | Guaranty certificate will be provided along with each tent | Yes |
| CERTIFICATION | Tensile strength of the arch fabric in warp direction | 395 Kgs minimum (for 24 feet length) |
| CERTIFICATION | Tensile strength of the arch fabric in weft direction | 395 Kgs minimum (for 24 feet length) |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements for last 3 years or CA certificate showing turnover
OEM authorization or Authorized Seller certificate (for imported items)
Experience certificates for similar inflatable tents
Technical compliance certificates and design drawings
Advance sample approval documentation (if applicable)
Any ISI/BIS/ISO certifications or equivalent
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit GST, PAN, audited turnover for last 3 years, OEM authorization for imported items, and experience certificates; provide design drawings and advance sample approval; ensure IS 550 fabric compliance and tensile strength data for warp/weft.
Required documents include GST certificate, PAN, turnover certificates, OEM/authorized seller proof for imports, technical compliance certificates, design drawings, and advance sample approval. Include experience in similar shelters and warranty commitments.
Tensile strength must be reported for warp and weft directions; IS 550 compliant fabric is preferred; provide fabric test reports and warranty details for the arch fabric used in the tent system.
The purchaser may vary quantity by up to 25% during contract and extended periods; additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Advance sample approval is mandatory before bulk supply; submit sample for evaluation and obtain sign-off prior to full-scale manufacturing and delivery.
Each tent must include a guaranty certificate; warranty terms cover fabric and frame components, with India-based after-sales service for imported items as per OEM requirements.
Imported tents require an OEM or Authorized Seller with a registered India office to provide after-sales support; submit the OEM authorization as part of bid submission.
Delivery timelines align to original and extended periods; ensure schedule aligns with sample approval outcomes and option- clause-driven quantity adjustments; coordinate with BSF procurement for delivery milestones.
Department Of Animal Husbandry Srinagar
📍 SRINAGAR, JAMMU & KASHMIR
National Disaster Response Force (ndrf)
Central Reserve Police Force (crpf)
N/a
📍 EAST SIKKIM, SIKKIM
Indian Air Force
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS