Drone Battery
Indian Army
DODA, JAMMU & KASHMIR
Progress
Quantity
1
Bid Type
Two Packet Bid
The procurement is led by the Armed Forces Tribunal under the Department of Defence for a Drone 5'' with battery targeted in Sonitpur, Assam. The scope covers Supply, Installation, Testing, Commissioning of the drones and Training of operators. The tender notes a flexible quantity clause allowing up to 25% variation at contract; no BOQ items are listed, indicating a potentially consolidated or single-supply requirement. An emphasis on post-award sample approval and bulk supply alignment with an approved sample is included, with clear conditions on delays and modifications. Unique conditions include an OEM/Authorized Seller requirement for imported products and in-country aftersales support, plus a defined advance sample cycle. The contract framework suggests a turnkey delivery from order to field deployment, with emphasis on compliance and timely delivery, though exact quantities and values remain undisclosed.
Product/service names: Drone 5'' with battery; scope includes supply, installation, testing, commissioning and operator training
Quantities/values: Not disclosed; EMD/estimated value not provided
Standards/Certifications: Not specified in tender data
Delivery/Installation: Includes on-site installation and operator training; advance sample approval required
Experience: Implied requirement for OEM/Authorized Seller with in-country support for imported products
Potential 25% quantity variation at contract placement and during the currency of contract
Imported drone must have an Indian-registered OEM or authorized seller for aftersales support
Advance sample must be submitted within 5 days of award; approval or modification within 5 days
Not explicitly stated; terms may follow standard government procurement norms for supply, installation, testing, commissioning and training
Delivery period will commence after the original delivery order; extension calculations apply based on quantity changes with a minimum 30 days
Not specified; sample approval delays may reframe delivery timelines without LD; contract termination possible for major deviations
OEM or Authorized Seller of OEM for imported drones must have registered office in India
Capability to provide aftersales support in India
Ability to fulfill supply, installation, testing, commissioning and operator training scope
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Drone 5'' with battery
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
PATIALA, PUNJAB
Indian Army
PATIALA, PUNJAB
Indian Army
NAINITAL, UTTARAKHAND
Indian Army
PANCHKULA, HARYANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about ASSAM tender market
Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD documents, technical bid documents, and OEM authorization letters for imported products; ensure Indian office for aftersales support if applicable and provide sample submission proof within 5 days of award.
The purchaser may increase or decrease the contracted quantity by up to 25% at contract placement and during the currency of the contract at contracted rates; delivery timeline shifts are calculated by the formula stated, with a minimum of 30 days added for extended delivery.
The successful bidder must submit 1 advance sample within 5 days of award; buyer will approve or specify modifications within 5 days; bulk supply must align with approved sample, else delivery timelines may be adjusted without LD.
Scope includes Supply, Installation, Testing, Commissioning of drones and Training of operators; delivery period follows original or extended schedule with the option clause; delays in sample approval may shift delivery without LD.
Yes. Imported drones must have an OEM or Authorized Seller with a registered office in India to provide aftersales support; ensure documentation demonstrating this capability is included with bid submission.
Eligibility includes ability to supply, install, test and train; compliance with OEM authorization requirements for imported products; demonstration of in-country aftersales support; submission of all mandatory documents listed in tender terms.
Advance sample submission must occur within 5 days of award; delivery timelines depend on original delivery order and option-variant calculations with a minimum 30 days; delays in sample approval can shift delivery without LD, while major deviations may lead to contract termination.
The scope includes Supply, Installation, Testing, Commissioning of the Drone 5'' with battery and Training of operators; the contract requires alignment to an approved sample and may include on-site setup and operator handover.
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Armed Forces Tribunal
📍 SONITPUR, ASSAM
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Director General Of National Cadet Corps (dgncc)
📍 BARAMULLA, JAMMU & KASHMIR
Indian Army
📍 COOCH BEHAR, WEST BENGAL
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS