Shock absorber front BP,Wiper blade,Fuel filter assy,Sensor water separator,Oil filter,Air filter,B
Indian Army
SRINAGAR, JAMMU & KASHMIR
Bid Publish Date
14-Jun-2026, 10:55 am
Bid End Date
25-Jun-2026, 11:00 am
Location
Progress
Quantity
22
Category
Front Shock Absorber
Bid Type
Two Packet Bid
The opportunity is with the Indian Army, Department Of Military Affairs, for procurement spanning a range of mechanical components including Front Shock Absorber, Oil Filter, Kit Pad Assy Front, Ball Joint, Cap Assy Fuel Tank, AC Condensor Fan, Armature Assy, Self Bush Set, Drive Assy, Deleted Wiper Arm Pentograph Type, Frt Brake PAD, Knob, Water Separator, Sedimeter Filter. The BOQ lists a total of 15 items in the scope; exact quantities and unit measures are not disclosed. Estimated contract value and EMD are not provided. The procurement targets standard military-grade components for vehicle and equipment platforms, reflecting the army’s standardization needs. A notable feature is the optional quantity clause allowing up to 25% quantity variation at contract, with delivery timelines adjusted accordingly. The tender emphasizes adherence to the purchaser’s delivery framework and option exercise timing from the original or extended delivery window.
Product/service names: Front Shock Absorber, Oil Filter, Kit Pad Assy Front, Ball Joint, Cap Assy Fuel Tank, AC Condensor Fan, Armature Assy, Self Bush Set, Drive Assy, Wiper Arm Pentograph Type, Frt Brake PAD, Knob, Water Separator, Sedimeter Filter
Quantities: 15 total items (exact values not disclosed)
Est. value/EMD: Not disclosed in tender data
Standards/certifications: Not specified; ATC exists for bidders to review
Delivery: Option-based quantity changes up to 25%; delivery period rules apply
25% quantity variation allowed at contract and during currency
Delivery period adjustments tied to original/extended period with 30-day minimum
ATC document governs specific bidder obligations and compliance
Not explicitly stated in data; refer to ATC for payment milestones and conditions
Delivery period calculated from last date of original delivery order; extended time based on (increased quantity/original quantity) × original period, minimum 30 days
Not specified in data; ATC should detail LDs or penalties
Eligibility for supplying automotive/mechanical assemblies to government—military procurement environment
Compliance with ATC provisions and option clause on quantity variations
Demonstrable ability to meet delivery timelines and security/clearance requirements as applicable to Indian Army contracts
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Front Shock Absorber , Oil Filter , Kit Pad Assy Front , Ball Joint , Cap Assy Fuel Tank , AC Condensor Fan , Armature Assy , Self Bush Set , Drive Assy , Deleted Wiper Arm Pentograph Type , Frt Brake PAD , Knob , Water Saparator , Sedimeter Filter
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
EAST SIKKIM, SIKKIM
Indian Army
JALPAIGURI, WEST BENGAL
Armed Forces Tribunal
LEH, JAMMU & KASHMIR
Indian Army
IMPHAL WEST, MANIPUR
Tender Results
Loading results...
Front Shock Absorber
Front Shock Absorber
Oil Filter
Oil Filter
Kit Pad Assy Front
Kit Pad Assy Front
Ball Joint
Ball Joint
Cap Assy Fuel Tank
Cap Assy Fuel Tank
AC Condensor Fan
AC Condensor Fan
Armature Assy
Armature Assy
Self Bush Set
Self Bush Set
Drive Assy
Drive Assy
Deleted Wiper Arm Pentograph Type
Deleted Wiper Arm Pentograph Type
Frt Brake PAD
Frt Brake PAD
Knob
Knob
Oil Filter
Oil Filter
Water Saparator
Water Saparator
Sedimeter Filter
Sedimeter Filter
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Front Shock Absorber | Front Shock Absorber | 1 | nos | tssclk193 | 30 | |
| 2 | Oil Filter | Oil Filter | 4 | nos | tssclk193 | 30 | |
| 3 | Kit Pad Assy Front | Kit Pad Assy Front | 1 | nos | tssclk193 | 30 | |
| 4 | Ball Joint | Ball Joint | 3 | nos | tssclk193 | 30 | |
| 5 | Cap Assy Fuel Tank | Cap Assy Fuel Tank | 1 | nos | tssclk193 | 30 | |
| 6 | AC Condensor Fan | AC Condensor Fan | 1 | nos | tssclk193 | 30 | |
| 7 | Armature Assy | Armature Assy | 1 | nos | tssclk193 | 30 | |
| 8 | Self Bush Set | Self Bush Set | 1 | nos | tssclk193 | 30 | |
| 9 | Drive Assy | Drive Assy | 1 | nos | tssclk193 | 30 | |
| 10 | Deleted Wiper Arm Pentograph Type | Deleted Wiper Arm Pentograph Type | 2 | nos | tssclk193 | 30 | |
| 11 | Frt Brake PAD | Frt Brake PAD | 1 | nos | tssclk193 | 30 | |
| 12 | Knob | Knob | 1 | nos | tssclk193 | 30 | |
| 13 | Oil Filter | Oil Filter | 2 | nos | tssclk193 | 30 | |
| 14 | Water Saparator | Water Saparator | 1 | nos | tssclk193 | 30 | |
| 15 | Sedimeter Filter | Sedimeter Filter | 1 | nos | tssclk193 | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar military/vehicular components (if specified in ATC)
Financial statements (audited) for last 2-3 years
EMD/Security deposit documentation as per ATC
Technical bid documents demonstrating compliance with broad automotive/mechanical assemblies
OEM authorizations or approvals (if required by ATC)
Any compliance certificates requested in the ATC document
Bidders must submit the required documents listed in the Terms. Review the ATC for compliance, understand the 25% option clause, and ensure capability to deliver 15 item categories with Army-standard quality expectations. Prepare financials, GST, PAN, and possible OEM authorizations as per ATC.
Submit GST certificate, PAN card, audited financial statements, experience certificates for similar work, and EMD documentation as per ATC. Include OEM authorizations if mandated, and technical bids showing per-item compliance for Front Shock Absorber and related assemblies.
The Purchaser may increase/decrease quantity up to 25% at contract signing and during the currency. Delivery time scales with increased quantity using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days added.
ATC document governs bidder obligations beyond base tender data. Review for payment milestones, delivery penalties, warranty or AMC expectations, and any facility clearances. Ensure full compliance with Army-specific terms before bid submission.
No explicit standards are published in the tender data. Respondents should align with typical military-grade automotive components and await ATC directives on IS/ISO or OEM requirements, ensuring compatibility with Front Shock Absorber, Oil Filter, and related assemblies.
Deadline details are not provided in the data. Bidders must consult the official portal and the ATC document for the precise submission date, mandatory documents, and submission format.
The BOQ comprises 15 item categories including Front Shock Absorber, Oil Filter, Kit Pad Front, Ball Joint, Cap Assy Fuel Tank, AC Condensor Fan, Armature Assy, Self Bush Set, Drive Assy, Wiper Arm Pentograph, Frt Brake PAD, Knob, Water Separator, Sedimeter Filter; exact quantities are not disclosed.
Eligibility includes regulatory registrations (GST, PAN), potential experience certificates for similar military/vehicular components, financial stability documented in audited statements, and compliance with ATC terms and the option clause for quantity adjustments.
Indian Army
📍 PITHORAGARH, UTTARAKHAND
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 TINSUKIA, ASSAM
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS