ER6150B-RO-201-DT-01-06C,TYPE TESTING,A,B,C
Indian Navy
Bid Publish Date
01-Nov-2025, 9:17 am
Bid End Date
09-Dec-2025, 4:00 pm
Progress
Quantity
5
Category
EY6050B-YSC7509E
Bid Type
Two Packet Bid
Organization: Indian Navy (Department Of Military Affairs) pursuing a contract related to TRAINING CHARGES and TYPE TESTING services, with work to be performed at the consignee premises in Visakhapatnam, Andhra Pradesh. The procurement references 5 BOQ items, but explicit quantities and total estimated value are not disclosed. Key differentiator is the requirement to secure Detailed Design Drawings approval within 21 days of award, and potential modification cycles within 15 days. The contract accommodates delivery delays caused by Buyer approval with no LD impact. This tender emphasizes OEM-led installation and a flexible quantity clause (up to 50% variation).
Product/service names: TRAINING CHARGES, TYPE TESTING
Delivery at: CWH, VISAKHAPATANAM, ANDHRA PRADESH 530008
Data Sheet uploaded; ensure no mismatch with technical parameters
OEM-led installation and commissioning by OEM-certified resource
7 years residual market life requirement for offered products
Up to 50% quantity variation at purchase and during currency
Detailed Design Drawings to be approved within 21 days of award
Installation/Testing by OEM or OEM-certified personnel
Delivery terms adjustable for Buyer-approved delays with no LD
GST reimbursement terms aligned with actuals or applicable rates, whichever is lower, up to quoted GST. No LD specified for drawing approval delays; delivery period re-fixed accordingly.
Delivery to consignee premises in Visakhapatnam, with installation and commissioning as per scope. Delays in buyer approval lead to re-fixed delivery timeline.
Not explicitly stated; potential LD terms may be defined post-approval; contract allows +/-50% quantity variation at different stages.
Not under liquidation, court receivership, or similar proceedings
Offer products with minimum 7 years residual market life
Capability for OEM-led installation and commissioning by OEM-certified personnel
Indian Navy
Indian Navy
All India Radio
PAPUM PARE, ARUNACHAL PRADESH
All India Radio
PAPUM PARE, ARUNACHAL PRADESH
Airports Authority Of India
AMRITSAR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | EY6050B-YSC7509E | ANCHOR WINDLASS | 1 | no | cwh_sss_sh09 | 180 |
| 2 | OBS | ONBOARD SPARES AS PER PARA 1(AD) OF ATC | 1 | set | cwh_sss_sh09 | 180 |
| 3 | TRAINING CHARGES | TRAINING CHARGES AS PER PARA 1(AB) OF ATC | 1 | job | cwh_sss_sh09 | 180 |
| 4 | TYPE TESTING | TYPE TESTING CHARGES (IF ANY) | 1 | no | cwh_sss_sh09 | 180 |
| 5 | A | NOT REQUIRED | 1 | no | cwh_sss_sh09 | 180 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
Data Sheet of offered products
End User Certificate in Buyer’s standard format (if requested)
Undertaking confirming non-liquidation status
Any OEM authorisation or reseller certification for installation services
Extended Deadline
09-Dec-2025, 4:00 pm
Opening Date
09-Dec-2025, 4:30 pm
To bid, prepare detailed design drawings within 21 days of award, upload the product data sheet, and ensure OEM-led installation capability. Submit PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure 7-year product life and non-obsolescence; address GST reimbursement terms and potential quantity variations.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and Data Sheet showing offered product specifications. Provide End User Certificate on the buyer format if requested. Include vendor eligibility undertaking and OEM authorisation for installation and commissioning by certified personnel.
Technical specs require a Data Sheet aligned with drawings approved within 21 days of award, and modification list within 15 days. Installation and testing must be done by OEM-certified staff; ensure 7-year market life and non-obsolescence before award.
Delivery period is contingent on approval timelines for Detailed Design Drawings. If buyer delays approvals, the delivery date is refixed and no liquidated damages apply for the approval delay; subsequent delivery aligns with approved drawings and scope.
GST is bidder’s responsibility; reimbursement will be provided as actuals or applicable rates, whichever is lower, capped at the quoted GST percentage. Ensure GSTIN validity and timely tax compliance documentation with bid.
Bidder must demonstrate OEM certification or OEM-authorised reseller status for installation, testing, and commissioning. Provide relevant authorisations and evidence of capability to deploy trained personnel; ensure product has minimum 7-year market life and no obsolescence prior to contract term.
The purchaser may increase or decrease quantity up to 50% at contract placement and during currency, with delivery measured from the last-date delivery for the contracted quantity. Plan supply chain to absorb partial volume fluctuations.
Data Sheets must be uploaded with bids and match the actual product specifications. Any unexplained mismatch can lead to bid rejection; ensure parameter alignment with drawings and approved design.
Indian Navy
Indian Navy
Indian Navy
Indian Navy
Indian Navy
Access all tender documents at no cost
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS