Satara District Panchayats Off-Grid Solar PV Power Plant Tender 2025 - ISI/ISO Standards, 25% Option
Satara District Panchayats
SATARA, MAHARASHTRA
Bid Publish Date
03-Jan-2026, 8:21 pm
Bid End Date
13-Jan-2026, 9:00 pm
EMD
₹6,400
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Rural Development Department, Uttar Pradesh, invites bids for Solar Photovoltaic Water Pumping Systems (V2) compliant with MNRE specifications, to be deployed in KHERI, UP 261501. The procurement scope includes solar pumping systems with specified PV array power, motor pump-set capacity, dynamic head, and daily water output. The opportunity is defined by a 25% flexibility in quantity and a structured delivery timeline linked to the original delivery period, ensuring supplier adaptability. Mandatory compliance with ISO 9001:2015 and ISO 14001:2015, along with tax and anti-corruption documentation, shapes bidder eligibility. This tender emphasizes standardization, environmental management, and auditable documentation. Unique factors include the option clause on quantity and extended delivery within contract terms, requiring robust project planning and supply chain readiness.
Solar PV Water Pumping System (V2) as per MNRE specification
Model Number of SPV Water Pumping System
Power of Solar PV Array (WP)
Motor Pump-Set Capacity (HP)
Shut Off Dynamic Head (m)
Water Output (L/day)
EMD amount ₹6,400 must accompany bid
Bidder must provide IT returns for three financial years
ISO 9001:2015 and ISO 14001:2015 certifications required
Quantity can vary by ±25% during contract
Delivery linked to original delivery order date with option extension
Payment terms are not explicitly provided; bidders should request clarification during bid process and ensure compliance with standard government procurement payment practices
Delivery period commences from the last date of the original delivery order; additional time formula (increased quantity/original quantity) × original delivery period, minimum 30 days
Not explicitly stated; bidders should confirm LD provisions and performance guarantees during bid clarification
Must hold ISO 9001:2015 certification
Must hold ISO 14001:2015 certification
Must not be blacklisted and provide No Relationship Certificate
Satara District Panchayats
SATARA, MAHARASHTRA
Latur District Panchayats
LATUR, MAHARASHTRA
Latur District Panchayats
LATUR, MAHARASHTRA
Satara District Panchayats
SATARA, MAHARASHTRA
Satara District Panchayats
SATARA, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameter | Type of Solar Pumping System | Shallow Well (Surface) Solar Pumping Systems with D.C. Motor /PMSM/SRM, Shallow Well (Surface) Solar Pumping Systems with A.C. Induction Motor, Solar Deep Well (Submersible) Pumping Systems with D.C. Motor /PMSM/SRM, Solar Deep Well (Submersible) Pumping Systems with A.C. Induction Motor |
| Performance Parameter | Model Number of SPV Water Pumping System | Model-1, Model-2, Model-3, Model-4, Model-5, Model-6, Model-7, Model-8, Model-9, Model-10, Model-11, Model-12, Model-13, Model-14, Model-15, Model-16, Model-17, Model-18, Model-19, Model-20, Model-21, Model-22, Model-23, Model-24, Model-25, Model-26, Model-27, Model-28, Model-29, Model-30, Model-31, Model-32, Model-33, Model-34, Model-35, Model-36, Model-37, Model-38, Model-39 |
| Performance Parameter | Power of Solar Photovoltaic (PV) Array [in Watt-peak(Wp)] | 900, 1800, 2700, 4800, 6750, 9000, 11250, 18000, 20250, 22500, 13500, 15750, 1200, 3000 |
| Performance Parameter | Motor Pump-Set Capacity (in HP) | 1, 2, 3, 5, 7.5, 10, 12.5, 20, 22.5, 25, 15, 17.5 |
| Performance Parameter | Shut Off Dynamic Head (in meters) | 12, 25, 45, 100, 150, 70, 180, 225, 300, 375 |
| Performance Parameter | Water Output (in Liters per day) | 42000 (from a total head of 30 meters), 42000 (from a total head of 70 meters), 43200 (from a total head of 100 meters), 45000 (from a total head of 70 meters), 45600 (from a total head of 30 meters), 50400 (from a total head of 100 meters), 60750 (from a total head of 100 meters), 63000 (from a total head of 30 meters), 63000 (from a total head of 50 meters), 67200 (from a total head of 70 meters), 68400 (from a total head of 30 meters), 69000 (from a total head of 50 meters), 70875 (from a total head of 100 meters), 72000 (from a total head of 70 meters), 75375 (from a total head of 150 meters), 81000 (from a total head of 100 meters), 81000 (from a total head of 250 meters), 84375 (from a total head of 150 meters), 89100 (from a total head of 10 meters), 90000 (from a total head of 200 meters), 90000 (from a total head of 250 meters), 90450 (from a total head of 150 meters), 91125 (from a total head of 250 meters), 94500 (from a total head of 70 meters), 94500 (from a total head of 100 meters), 95625 (from a total head of 120 meters), 99000 (from a total head of 10 meters), 99000 (from a total head of 200 meters), 100800 (from a total head of 50 meters), 105000 (from a total head of 30 meters), 101250 (from a total head of 70 meters), 101250 (from a total head of 100 meters), 101250 (from a total head of 150 meters), 101250 (from a total head of 200 meters), 101250 (from a total head of 250 meters), 105525 (from a total head of 150 meters), 106875 (from a total head of 120 meters), 110400 (from a total head of 50 meters), 111375 (from a total head of 200 meters), 112500 (from a total head of 200 meters), 114000 (from a total head of 30 meters), 114750 (from a total head of 120 meters), 118125 (from a total head of 100 meters), 118125 (from a total head of 150 meters), 120600 (from a total head of 150 meters), 121500 (from a total head of 100 meters), 123750 (from a total head of 200 meters), 126000 (from a total head of 70 meters), 128250 (from a total head of 120 meters), 132300 (from a total head of 20 meters), 133875 (from a total head of 120 meters), 135000 (from a total head of 70 meters), 135000 (from a total head of 150 meters), 135675 (from a total head of 150 meters), 141750 (from a total head of 50 meters), 141750 (from a total head of 100 meters), 148500 (from a total head of 20 meters), 149625 (from a total head of 120 meters), 150750 (from a total head of 150 meters), 151875 (from a total head of 150 meters), 153000 (from a total head of 120 meters), 155250 (from a total head of 50 meters), 157500 (from a total head of 70 meters), 162000 (from a total head of 100 meters), 165375 (from a total head of 100 meters), 168000 (from a total head of 30 meters), 168750 (from a total head of 70 meters), 168750 (from a total head of 150 meters), 171000 (from a total head of 120 meters), 172125 (from a total head of 120 meters), 178200 (from a total head of 10 meters), 182250 (from a total head of 100 meters), 182400 (from a total head of 30 meters), 189000 (from a total head of 50 meters), 189000 (from a total head of 70 meters), 189000 (from a total head of 100 meters), 191250 (from a total head of 120 meters), 192375 (from a total head of 120 meters), 198000 (from a total head of 10 meters), 202500 (from a total head of 70 meters), 202500 (from a total head of 100 meters), 207000 (from a total head of 50 meters), 212625 (from a total head of 100 meters), 213750 (from a total head of 120 meters), 220500 (from a total head of 70 meters), 235200 (from a total head of 20 meters), 236250 (from a total head of 30 meters), 236250 (from a total head of 50 meters), 236250 (from a total head of 70 meters), 236250 (from a total head of 100 meters), 252000 (from a total head of 70 meters), 256500 (from a total head of 30 meters), 264000 (from a total head of 20 meters), 267300 (from a total head of 10 meters), 270000 (from a total head of 70 meters), 283500 (from a total head of 50 meters), 283500 (from a total head of 70 meters), 297000 (from a total head of 10 meters), 303750 (from a total head of 70 meters), 315000 (from a total head of 30 meters), 315000 (from a total head of 70 meters), 330750 (from a total head of 20 meters), 330750 (from a total head of 50 meters), 337500 (from a total head of 70 meters), 342000 (from a total head of 30 meters), 371250 (from a total head of 20 meters), 378000 (from a total head of 50 meters), 393750 (from a total head of 30 meters), 441000 (from a total head of 20 meters), 425250 (from a total head of 50 meters), 465750 (from a total head of 50 meters), 472500 (from a total head of 30 meters), 472500 (from a total head of 50 meters), 475200 (from a total head of 10 meters), 495000 (from a total head of 20 meters), 517500 (from a total head of 50 meters), 528000 (from a total head of 10 meters), 551250 (from a total head of 20 meters), 551250 (from a total head of 30 meters), 630000 (from a total head of 30 meters), 661500 (from a total head of 20 meters ), 668250 (from a total head of 10 meters), 742500 (from a total head of 10 meters), 990000 (from a total head of 10 meters), 1113750 (from a total head of 10 meters), 1237500 (from a total head of 10 meters), 618750 (from a total head of 20 meters), 427500 (from a total head of 30 meters), 258750 (from a total head of 50 meters), 742500 (from a total head of 20 meters), 513000 (from a total head of 30 meters), 310500 (from a total head of 50 meters), 598500 (from a total head of 30 meters), 362250 (from a total head of 50 meters), 684000 (from a total head of 30 meters), 414000 (from a total head of 50 meters) |
Discover companies most likely to bid on this tender
GST certificate
PAN card
IT Returns (FY 2022-23, 2023-24, 2024-25)
EMD hard copy
ISO 9001:2015 certification
ISO 14001:2015 certification
No Relationship Certificate
Affidavit of bidding firm not blacklisted
Affidavit of non-conflict/anti-corruption
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, IT returns for FY 2022-23, 2023-24, 2024-25, and EMD ₹6,400 with bid. Ensure ISO 9001:2015 and ISO 14001:2015 certificates, and affidavit of non-blacklisting. Quantity may vary ±25%, delivery as per original order date with extension rules.
Required documents include GST and PAN with stamp, IT returns for three fiscal years, EMD hard copy, ISO 9001:2015, ISO 14001:2015, No Relationship Certificate, and bidding firm anti-blacklist affidavit. All papers should accompany the bid package.
The tender specifies MNRE V2 performance parameters: model number, PV array power (WP), motor pump-set capacity (HP), shut-off head (m), and water output (L/day). Comply with MNRE V2 guidelines and ensure IS 550-based or equivalent efficiency standards where specified.
Quantity may be increased up to 25% of bid quantity at contract placement and during currency at contracted rates. Delivery time scales with (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Eligibility requires ISO 9001:2015 and ISO 14001:2015 certifications, non-blacklist affidavits, and submission of IT Returns for three financial years. EMD ₹6,400 must be provided; PAN and GST with stamp are mandatory.
The ATC does not specify LD details; bidders should confirm penalties or LD provisions during bid clarification. Expect standard performance-bond or LD clauses for delivery delays and non-compliance with MNRE V2 parameters.
Delivery is based on the last date of the original delivery order with possible extensions. Ensure planning accommodates the 30-day minimum extension and prepare supply chain milestones aligned to the original and extended delivery periods.
ISO 9001:2015 ensures quality management, and ISO 14001:2015 guarantees environmental management. Both are mandatory per ATC and elevate supplier credibility for government procurement of solar pumping systems.
E-nagar Palika Government Of Madhya Pradesh
📍 TIKAMGARH, MADHYA PRADESH
Department Of Posts
📍 NORTH DELHI, DELHI
Hindustan Copper Limited
📍 JHUNJHUNU, RAJASTHAN
Bharat Petroleum Corporation Ltd
📍 PALAKKAD, KERALA
Hqids
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS