TenderDekho Logo
GEM

Indian Army Shock Absorber, Gear Lever, Throttle Cable & More Tender 2026 – Department Of Military Affairs, India

Bid Publish Date

05-Jul-2026, 10:03 am

Bid End Date

15-Jul-2026, 11:00 am

Progress

Issue05-Jul-2026, 10:03 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

18

Category

SHOCK ABSORBER

Bid Type

Two Packet Bid

Key Highlights

  • Specific brand/OEM requirements: BIS licence, type test certificates, approval certificates
  • Technical standards: BIS certification and product-specific approvals
  • Special clauses: 25% quantity variation during award and contract currency
  • Warranty/AMCs: Sample-based pre-approval; post-approval supply as per contract
  • Penalty/LD: Major deviations may lead to sample rework or termination
  • Delivery: Original delivery period with potential extensions calculated by formula
  • Delivery location: National military procurement; location not disclosed in data
  • Eligibility: Upload required BIS/type-test certificates with bid

Categories 8

Tender Overview

The opportunity is issued by the Indian Army under the Department Of Military Affairs for a multi-item procurement package including SHOCK ABSORBER, GEAR LEVER WITH RUBBER, THROTTLE CABLE, OIL SEAL GEAR SHAFT, KICK SHAFT SEAL, BRAKE SHOE ASSY REAR, CHAIN AND SPROCKET KIT. The BOQ lists 7 total items, with no explicit unit quantities disclosed in the available data. The contract permits up to 25% quantity variation at the time of award and during the currency of the contract, at contracted rates. Delivery timing follows the original delivery period, with extension calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. The buyer reserves the right to modify delivery timelines accordingly. The tender will require advance sample approvals and strict adherence to supplied specifications. Location unspecified; procurement targets national security equipment supply for the Indian Army. This is a niche, standards-driven defense supply project with emphasis on sample conformity, supplier certifications, and post-award sample verification.

Technical Specifications & Requirements

  • 7 total items in the BOQ cover mechanical and hydraulic components: SHOCK ABSORBER, GEAR LEVER WITH RUBBER, THROTTLE CABLE, OIL SEAL GEAR SHAFT, KICK SHAFT SEAL, BRAKE SHOE ASSY REAR, CHAIN AND SPROCKET KIT.
  • No explicit performance specs or measurements are published in the provided data; however, the buyer mandates advance sample approval before bulk manufacturing, with a five-day window for submission and a five-day approval/modification cycle.
  • Certificates and compliance are required per the buyer’s terms, including BIS licences, type test certificates, and approval certificates as prescribed in the product specification in the bid document.
  • The bidder must prepare for potential quantity adjustments up to 25% during contract execution, maintaining contracted rates.
  • Emphasis on timely delivery, sample conformity, and adherence to unspecified military-grade standards; bidders should anticipate additional security and compliance checks once technical details are formalized.

Terms, Conditions & Eligibility

  • EMD/Performance security: Not explicitly disclosed in the extract; bidders must meet standard bid security requirements per the ATC/Corrigendum.
  • Delivery terms: Original delivery period governs; extended delivery period calculated using the option clause formula, with a minimum of 30 days; extension may apply during contract currency.
  • Sample approval: Successful Bidder shall submit 1 advance sample within 5 days of award, with buyer response in 5 days; delay may reset delivery without LD.
  • Documents: Upload BIS licences, type test certificates, and all prescribed certificates with the bid as per Product Specification and Any ATC/Corrigendum.
  • Compliance: Bid submissions must meet all terms in the Buyer Added Terms; non-compliance may lead to rejection.
  • Quality/Modification: Major deviations may trigger fresh samples or contract termination; bulk supply must align with approved sample.

Key Specifications

  • Item names from BOQ: SHOCK ABSORBER, GEAR LEVER WITH RUBBER, THROTTLE CABLE, OIL SEAL GEAR SHAFT, KICK SHAFT SEAL, BRAKE SHOE ASSY REAR, CHAIN AND SPROCKET KIT

  • Estimated value: Not disclosed; quantity unspecified in provided data

  • Delivery terms: 30+ days minimum extension via option clause

  • Standards: BIS licence and type test certificates; product specification dictates compliance

  • Supply terms: Advance sample before bulk manufacturing; 5-day submission and 5-day approval cycle

Terms & Conditions

  • Option clause permits up to 25% quantity variation at contract award and during currency

  • Advance sample approval required within 5 days of award; modifications within 5 days

  • Mandatory BIS/type-test and approval certificates with bid submission

  • Delivery period recalculated for extended quantities; minimum 30 days extension

Important Clauses

Payment Terms

Not explicitly stated; follow standard government procurement payment terms and ATC/Corrigendum specifics.

Delivery Schedule

Original delivery period governs; extended time calculated by (increased quantity ÷ original quantity) × original delivery period, with minimum 30 days.

Penalties/Liquidated Damages

Not specified; deviations from approved samples may trigger contract termination; penalties may apply per buyer's discretion.

Bidder Eligibility

  • Demonstrated experience supplying mechanical/hydraulic components for defense/military programs

  • Valid BIS licence and ability to provide type test certificates

  • Ability to submit advance sample within 5 days of award and comply with modification timeline

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SHOCK ABSORBER , GEAR LEVER WITH RUBBER , THROTTLE CABLE , OIL SEAL GEAR SHAFT , KICK SHAFT SEAL , BRAKE SHOE ASSY REAR , CHAIN AND SPROCKET KIT

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

AMBALA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AMBALAAMBALA--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9562289.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SHOCKER ABSORBER,CHAIN AND SPROCKET KIT,BRAKE SHOE ASSY,SPRING,BEARING BALL,OIL SEAL,ASSY FUEL FILT

Indian Army

AMBALA, HARYANA

Posted: 29 May 2026
Closed: 8 June 2026
GEM

Indian Army Gear Lever Kit & Related Components Tender Ambala Haryana 2026 ISO 9001 Compliant

Indian Army

AMBALA, HARYANA

Posted: 18 June 2026
Closed: 29 June 2026
GEM

Shock Absorber Lever Action,Brake Actuator,Air Compressor,Propeller Shaft Sprocket Bolt,Nut Slotted

Indian Army

AMBALA, HARYANA

Posted: 3 June 2026
Closed: 13 June 2026
GEM

Indian Army Gear Lever Kit & Automotive Parts Tender 2025 – OEM Supply, Delhi/NCR Region, 25% Quantity Variation

Indian Army

SRINAGAR, JAMMU & KASHMIR

Posted: 16 December 2025
Closed: 26 December 2025
GEM

Indian Army Department Of Military Affairs Wheel Bolt and Spare Parts Tender 2026 - ISI/AAA/TRTL Standards 2026

Indian Army

GURDASPUR, PUNJAB

Posted: 6 January 2026
Closed: 17 January 2026
GEM

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

SHOCK ABSORBER

RE

2 nos Delivery: 15 days
#2

GEAR LEVER WITH RUBBER

RE

1 nos Delivery: 15 days
#3

THROTTLE CABLE

RE

1 nos Delivery: 15 days
#4

OIL SEAL GEAR SHAFT

RE

4 nos Delivery: 15 days
#5

KICK SHAFT SEAL

RE

8 nos Delivery: 15 days
#6

BRAKE SHOE ASSY REAR

RE

1 set Delivery: 15 days
#7

CHAIN AND SPROCKET KIT

RE

1 set Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (relevant to defense/military supply)

4

Financial statements (balance sheet, P&L)

5

EMD/Security deposit documents (as per bid)

6

Technical bid documents

7

OEM authorizations (if applicable)

8

BIS licence and type test certificates

9

Approval certificates and any product-specific certifications

10

ATC/Corrigendum compliance documents

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid for Indian Army shock absorber and gear lever tender 2026?

Bidders must submit BIS licences, type test certificates, and approval certificates with the bid, plus GST, PAN, experience and financial statements. Ensure advance sample is ready within 5 days of award, and comply with the 25% variation clause. Prepare for delivery timelines and contract-specific terms.

What documents are required for Indian Army procurement bidding 2026?

Submit GST certificate, PAN, experience certificates in defense supply, financial statements, EMD, technical bid, OEM authorizations, BIS/type-test certificates, and any product-specific approvals as per ATC/Corrigendum; ensure all certificates are current and applicable.

What are the delivery terms for this Indian Army tender 2026?

Delivery follows the original delivery period; if quantity increases, the extended delivery time is calculated as (increased quantity ÷ original quantity) × original period, with a minimum of 30 days; extensions may occur during currency of the contract.

What standards and certifications are needed for this defense procurement?

Mandatory BIS licence and type test certificates; approval certificates as prescribed in the product specification; ensure ISI/BIS standards and defense-specific compliance are met for each item in the BOQ.

How does the 25% quantity variation clause affect delivery commitments?

The purchaser may increase/decrease quantity by up to 25% at award and during the contract, with rates fixed; delivery periods adjust according to the option formula, ensuring minimum 30 days extension when necessary.

What is required for advance sample approval in this tender?

Submit 1 advance sample within 5 days of award; buyer replies within 5 days with approvals or modification lists; bulk supply must follow approved sample; delays from buyer can reset delivery without LD.

Which items are included in the BOQ for this Indian Army tender 2026?

The BOQ includes 7 items: SHOCK ABSORBER, GEAR LEVER WITH RUBBER, THROTTLE CABLE, OIL SEAL GEAR SHAFT, KICK SHAFT SEAL, BRAKE SHOE ASSY REAR, and CHAIN AND SPROCKET KIT; exact quantities not disclosed in the provided data.

What happens if samples fail to meet contract specifications?

If samples show major deviations, the buyer may require fresh samples or terminate the contract after notifying deviations; bulk supply must comply with approved sample to commence.

Similar Tenders

5 found

Shock Absorber,Suspension Bush Kit,Tapped Roller Bearing Front,Tapped Bearing Rear,Brake Shoes Lini

Indian Army

📍 KUPWARA, JAMMU & KASHMIR

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Hand brake cable,Oil seal,Pressure plate,Clutch plate,Hub bearing,Hub assy,Combination switch,Brake

Armed Forces Tribunal

📍 BARAMULLA, JAMMU & KASHMIR

Est: ₹65,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Indian Army Clutch Master Cyl incl. Drag Link Steering, Wiper Motor & Brake Components Tender West Kameng Arunachal Pradesh ISO 9001 2026

Indian Army

📍 WEST KAMENG, ARUNACHAL PRADESH

Est: ₹35,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Indian Army Vehicle Spare Parts Tender Bikaner Rajasthan 2026 IS 550 Aa/AAA TRTL Certified Parts

Indian Army

📍 BIKANER, RAJASTHAN

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

BRAKE PAD,OIL FILTER,IGNATION COIL ASSY,AIR FILTER,SPARK PLUG,CABLE COMP CLUTCH,CABLE ASSY SPEEDOME

Indian Army

📍 EAST SIKKIM, SIKKIM

Est: ₹2.3 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM