Organization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department, serving Uttar Pradesh. Location: Mainpuri, Uttar Pradesh 205001. Product/Service: No specific item details provided; procurement relates to general goods under GeM framework with 82 BoQ items listed (N/A specifics). Estimated Value: ₹7,000,000; EMD: ₹70,000. Unique terms include a 25% quantity option at contract award and during currency, plus a delivery-time computation formula. The contract allows flexible volume changes and extended delivery timelines while maintaining contracted rates. A notable clause permits submission of a Fixed Deposit Receipt (FDR) as performance security in lieu of a conventional PBG, with hard-copy delivery within 15 days of award. These factors shape bid strategy and risk assessment for suppliers.
Technical Specifications & Requirements
EMD: ₹70,000; payment/guarantee method per GeM GTC and ATC.
Estimated contract value: ₹7,000,000.
Option clause: Purchaser may increase/decrease quantity up to 25% of bid/contract quantity.
Delivery timeline: Calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extended periods permissible during option exercise.
Security options: FDR acceptable as performance security; FDR must be named to the Purchaser and delivered within 15 days of award.
BoQ: 82 items listed; detailed specifications not provided in tender data.
ATC note: Hard-copy FDR submission required; scanned copy uploaded in place of PBG.
Delivery/installation scope: To be governed by contract terms and delivery orders issued post-award.
Terms, Conditions & Eligibility
Delivery terms: As per contract with option-based quantity adjustments; base delivery period defined in original order.
EMD & security: ₹70,000 EMD; FDR alternative allowed with documentary requirements; hard copy due within 15 days of award.
PBG/FDR hybrid: FDR may be used in place of PBG; ensure proper endorsement on the back and official covering letter.
Quantity flexibility: Up to 25% increase/decrease; extended delivery time calculations apply.
Documentation: Upload scanned FDR; provide original hard copy to buyer within 15 days; comply with GeM GTC ATC terms.
Bid compliance: Bidders must adhere to all ATC terms and option clause application during contract execution.
Key Specifications
Procurement category: general goods under GeM with 82 BoQ items
EMD amount: ₹70,000
Estimated contract value: ₹7,000,000
Quantity variation: ±25% across contract lifecycle
Security: FDR acceptable as performance security
Delivery timeline: calculated via formula with minimum 30 days
Submission: scanned FDR uploaded; original hard copy due within 15 days
Terms & Conditions
EMD amount and alternate FDR-based security acceptance
25% quantity variation rights for purchaser
Delivery period computation with minimum 30 days
Hard-copy FDR due within 15 days of award
Important Clauses
Delivery & Option Clause
Purchaser may adjust quantity by up to 25% at award and during contract, with calculated extended delivery time; minimum 30 days, original delivery period if less.
Performance Security
FDR allowed in lieu of PBG; FDR must be endorsed and payable to SUPERINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE MAINPURI; scanned copy uploaded, original within 15 days.
Payment & Compliance
Payment terms follow GeM/GTC ATC; ensure submission of required documents (GST, PAN, experience, financials) with bid; adherence to option clause during contract execution.
Bidder Eligibility
Past experience in supplying similar general goods to electricity distribution entities
Demonstrated financial stability with auditable statements
Compliance with GeM GTC and ATC terms, including EMD/FDR submission
Additional Tender Data
Commercial Details
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Authority Records
ENERGY DEPARTMENT
BID & GeM Expert Consultancy
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Bid Preparation
GeM Registration
Document Filing
Free consultation · 24h response
BID & GeM Expert Consultancy
We'll contact you within 24 hours
Enquiry Submitted!
Our expert will contact you within 24 hours.
Documents 5
GeM-Bidding-9492899.pdf
Main Document
BOQ Document
BOQ
BOQ Document
BOQ
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Past Similar Tenders
(Historical Results)
5 found
Government Tender Published for Supply of 145 KV Male and female contact 33 KV CT clamp and 145 KV Outdoor Bushing Terminal Clamp at 132 KV Substation Minto Park and Teliarganj Prayagraj under ETD-II Prayagraj in PRAYAGRAJ, UTTAR PRADESH
UP Power Transmission Corp.Ltd (Operation)
PRAYAGRAJ, UTTAR PRADESH
Posted:
3 February 2026
Closed:
16 February 2026
EPROCURE
Government Tender Published for supply of 11 kv and 33 kv jointing kits of different sizes in MEERUT, UTTAR PRADESH
Paschimanchal Vidyut Vitran Nigam Ltd.
MEERUT, UTTAR PRADESH
Posted:
18 May 2026
Closed:
29 May 2026
EPROCURE
Open Tender for SUPPLY OF 11 KV CROSS ARM V TYPE in DEHRADUN, UTTARAKHAND
N/A
DEHRADUN, UTTARAKHAND
Posted:
15 April 2023
Closed:
2 May 2023
EPROCURE
Tender Notice for Supply and Delivery of 11 KV TOP ADAPTOR for PCC pole 8M long, DEAD END CLAMP for LT ABC, FIXED CONTACT SET FOR 33KV CR TYPE ISL under Islampur Division in DINAJPUR UTTAR, WEST BENGAL
WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD
DINAJPUR UTTAR, WEST BENGAL
Posted:
6 March 2026
Closed:
18 March 2026
EPROCURE
Invitation to Bid - Procurement of Clamps for CS pipes and 90/10 Cu-Ni/Copper Pipes for P17A in MUMBAI, MAHARASHTRA
N/A
MUMBAI, MAHARASHTRA
Posted:
20 July 2018
Closed:
8 August 2018
EPROCURE
Tender Results
Loading results...
Bill of Quantities (BOQ)
82 Items Sign in to view GEM price trendsSign in for GEM prices
#1
Supply of 11 KV V type cross arm Clamp with bolts and nuts
Clamp For 11 KV V type cross arm with bolts and nuts
604 no
Delivery: 180 days
#2
Supply of Three Phase Distribution Box Clamp with Nut and Bolts
Three Phase Distribution Box Clamp with Nut and Bolts
50 no
Delivery: 180 days
#3
Supply of Connecting Cable for DB 1x35 Sq.mm.
Connecting Cable for Distribution Box 1x35 Sq.mm.
200 m
Delivery: 180 days
#4
Supply of L.T. Fuse Set Protection Box with all Accessories
L.T. Fuse Set Protection Box with all Accessories
59 no
Delivery: 180 days
#5
Supply of Tinned Copper Fuse Wire Different Size
Tinned Copper Fuse Wire Different Size
20 kg
Delivery: 180 days
#6
Supply of HDPE PIPE 140 MM.
HDPE PIPE 140 MM.
350 m
Delivery: 180 days
#7
Supply of Stone Pad 300x300x75
Stone Pad 300x300x75
666 no
Delivery: 180 days
#8
Supply of Holding Clamp for Doulble Pole Unit with Nut and Bolts
Holding Clamp for Doulble Pole Unit with Nut and Bolts
85 no
Delivery: 180 days
#9
Supply of MS Angle 75x75x6x2028mm with clamp and Bolt and nut
MS Angle 75x75x6x2028mm with clamp and Bolt and nut T or F base
34 no
Delivery: 180 days
#10
Supply of T Off Chhanel T off Clamp with Nut and Bolts
T Off Chhanel and T off Clamp with Nut and Bolts
17 no
Delivery: 180 days
#11
Supply of Top Chhanel 125x65x240
Top Chhanel 125x65x240
20 no
Delivery: 180 days
#12
Supply of Dropper Channel 100x50x2028 mm
Dropper Channel 100x50x2028 mm.
17 no
Delivery: 180 days
#13
Supply of Danger Board With Clamp and Nut and Bolt
Danger Board With Clamp and Nut and Bolt
150 no
Delivery: 180 days
#14
Supply of G.I. Patti Clamp Nut and Bolts as per Norms
Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
34 no
Delivery: 180 days
#15
Supply of L.T. Tail Less unit with all respective material
L.T. Tail Less unit with all respective material Angel, Patti and other Material
56 no
Delivery: 180 days
#16
Supply of Copper L Pieace 62x225x12mm.
Copper L Pieace 62x225x12mm.
68 no
Delivery: 180 days
#17
Supply of 11 KV F Clamp with Nut and Bolts
11 KV F Clamp with Nut and Bolts
604 no
Delivery: 180 days
#18
Supply of Suspension Clamp
Suspension Clamp
50 no
Delivery: 180 days
#19
Supply of Dead End Clamp
Dead End Clamp
20 no
Delivery: 180 days
#20
Supply of Eye i Hook
Eye i Hook
10 no
Delivery: 180 days
#21
Supply of Eye bolts for Guarding
Eye bolts for Guarding
30 no
Delivery: 180 days
#22
Supply of J hook
J hook
50 no
Delivery: 180 days
#23
Supply of LT Clamp For PCC or STP with Bolts and Nuts
LT Clamp For PCC or STP with Bolts and Nuts
50 no
Delivery: 180 days
#24
Supply of Pearcing Connector
Pearcing Connector
200 no
Delivery: 180 days
#25
Supply of Alluminium LUG 120 Sq.mm.
Alluminium LUG 120 Sq.mm.
576 no
Delivery: 180 days
#26
Supply of Alluminium LUG 240 Sq.mm.
Alluminium LUG 240 Sq.mm.
204 no
Delivery: 180 days
#27
Supply of Alluminium LUG 400 Sq.mm.
Alluminium LUG 400 Sq.mm.
132 no
Delivery: 180 days
#28
Supply of Nut bolts and washers Off Size
Nut bolts and washers Off Size
10 kg
Delivery: 180 days
#29
Supply of Guarding Angel
Guarding Angel
30 no
Delivery: 180 days
#30
Supply of Guarding Angel Clamp
Guarding Angel Clamp
30 no
Delivery: 180 days
#31
Supply of M.S. Angel Iron 65x65x6 mm. 2700 mm Long Bracing
M.S. Angel Iron 65x65x6 mm. 2700 mm Long Bracing with 4 Nos Clamp with Nut and Bolts
1 no
Delivery: 180 days
#32
Carriage of 13 M STP Pole SP55 Galvanised from ESC MNP
13 M STP Pole SP55 Galvanised
3 no
Delivery: 180 days
#33
Carriage of 8.5 M PCC Pole from ESC MNP
8.5 M PCC Pole
666 no
Delivery: 180 days
#34
Carriage of V Type Cross Arm for 11 KV from ESC MNP
V Type Cross Arm for 11 KV
604 no
Delivery: 180 days
#35
Carriage of 11 KV Pin Insulator with Pin from ESC MNP
11 KV Pin Insulator with Pin
1,917 no
Delivery: 180 days
#36
Carriage of Disc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS from ESC MNP
Disc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS
141 no
Delivery: 180 days
#37
Carriage of 11 KV Fuse Set from ESC MNP
11 KV Fuse Set
17 no
Delivery: 180 days
#38
Carriage of 11 KV TPMO with Polymer Insulator from ESC MNP
11 KV TPMO with Polymer Insulator
17 no
Delivery: 180 days
#39
Carriage of Complete Stay 9GI Stay Rod 20x1800 mm etc material from ESC MNP
Complete Stay 9GI Stay Rod 20x1800 mm stay wire 7 and 8 SWG 10 KG Stay Clamp Bolt nut and washer
40 no
Delivery: 180 days
#40
Carriage of Distribution Transformer 25 KVA from ESC MNP
Distribution Transformer 25 KVA
6 no
Delivery: 180 days
#41
Carriage of Distribution Transformer 63 KVA from ESC MNP
Distribution Transformer 63 KVA
5 no
Delivery: 180 days
#42
Carriage of Distribution Transformer 100 KVA from ESC MNP
Distribution Transformer 100 KVA
6 no
Delivery: 180 days
#43
Carriage of Distribution Transformer 250 KVA from ESC MNP
Distribution Transformer 250 KVA
17 no
Delivery: 180 days
#44
Carriage of ACSR weasel Conductor from ESC MNP
ACSR weasel Conductor or Insulated Conductor as provided by Department
144 km
Delivery: 180 days
#45
Carriage of M S Earthing Rod 20 x2540 mm from ESC MNP
M S Earthing Rod 20 x2540 mm
708 no
Delivery: 180 days
#46
Carriage of LT AL. XLPE CABLE SIZE 1x240 Sq.mm. from ESC MNP
LT AL. XLPE CABLE SIZE 1x240 Sq.mm.
1,300 m
Delivery: 180 days
#47
Carriage of LT XLPE CABLE 1X120 Sq.mm. FOR DTR from ESC MNP
LT XLPE CABLE 1X120 Sq.mm. FOR DTR
50 m
Delivery: 180 days
#48
Carriage of LT XLPE CABLE 1X400 Sq.mm. FOR DTR from ESC MNP
LT XLPE CABLE 1X400 Sq.mm. FOR DTR
476 m
Delivery: 180 days
#49
Carriage of LT XLPE Cable Size 3.5x70 or 35 Sq.mm. from ESC MNP
LT XLPE Cable Size 3.5x70 or 35 Sq.mm.
150 m
Delivery: 180 days
#50
Carriage of LT AB Cable 3x120 1x95 1x16 Sq.mm. from ESC MNP
LT AB Cable 3x120 1x95 1x16 Sq.mm.
500 m
Delivery: 180 days
#51
Carriage of LT AB Cable 3x50 1x35 1x16 Sq.mm. from ESC MNP
LT AB Cable 3x50 1x35 1x16 Sq.mm.
1,000 m
Delivery: 180 days
#52
Carriage of LT AB Cable 3x95 1x70 1x16 Sq.mm. from ESC MNP
LT AB Cable 3x95 1x70 1x16 Sq.mm.
1,000 m
Delivery: 180 days
#53
Carriage of 33 KV XLPE Cable 3x300 Sq.mm. from ESC MNP
33 KV XLPE Cable 3x300 Sq.mm.
430 m
Delivery: 180 days
#54
Carriage of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. from ESC MNP
33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm.
8 no
Delivery: 180 days
#55
Carriage of 33 KV Straight Through Size 3x300 Sq.mm. from ESC MNP
33 KV Straight Through Size 3x300 Sq.mm.
2 no
Delivery: 180 days
#56
Carriage of G.I. Wire 6 or 8 SWG for Guarding from ESC MNP
G.I. Wire 6 or 8 SWG for Guarding
835 kg
Delivery: 180 days
#57
Carriage of Three Phase Distribution Box from ESC MNP
Three Phase Distribution Box
50 no
Delivery: 180 days
#58
Erection of Fixing of LT Fuse Set Protection Box with all respective Accessories As per Norms
Fixing of L.T. Fuse Set Protection Box with all respective Accessories As per Norms
59 no
Delivery: 180 days
#59
Execution of Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
34 no
Delivery: 180 days
#60
Erection of L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.
L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.
56 no
Delivery: 180 days
#61
Laying of ACSR weasel Conductor
Laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. ACSR weasel Conductor or Insulated Conductor as provided by Department
144 km
Delivery: 180 days
#62
Laying of LT AB Cable 3x120 1x95 1x16 Sq.mm.
Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x120 1x95 1x16 Sq.mm.
500 m
Delivery: 180 days
#63
Laying of LT AB Cable 3x50 1x35 1x16 Sq.mm.
Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x50 1x35 1x16 Sq.mm
1,000 m
Delivery: 180 days
#64
Laying of LT AB Cable 3x95 1x70 1x16 Sq.mm.
Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x95 1x70 1x16 Sq.mm.
1,000 m
Delivery: 180 days
#65
Mounting of Three Phase Distribution Box
Mounting of Three Phase Distribution Box with Clamp nut & Bolts and Make Proper Connection with Connecting Cable.
50 no
Delivery: 180 days
#66
Erection of Double pole structure 8.5 Mtr PCC Pole
Erection of Double pole structure 8.5 Mtr PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 34 Nos Pole At Different Location Under Concern Division.
17 no
Delivery: 180 days
#67
Erection of single pole structure 8.5 Mtrs PCC Pole
Erection of single pole structure 8.5 Mtrs PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. At Different Location Under Concern Division.
632 no
Delivery: 180 days
#68
Erection of TRI pole structure 33 KV 13 Mtr ST Pole
Erection of TRI pole structure 33 KV 13 Mtr ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 3 Nos Pole At Different Location Under Concern Division.
1 no
Delivery: 180 days
#69
Grouting of PCC or STP POLE
Grouting of PCC or STP POLE Long As per Respo Norms with Material Cement, Sand, Blast Stone with the ratio 0.268 Cu.m. each will be provided by conractor
669 no
Delivery: 180 days
#70
Grouting of Stay
Grouting of Stay As per Respo Norms Cement, Sand, Blast Stone material will be provided by conractor
40 no
Delivery: 180 days
#71
Earthing of pole
Earthing of pole by M S Earthing Rod 20 x2540 mm with 6 SWG earthing wire etc and make Proper Connection.
669 no
Delivery: 180 days
#72
Guarding of 11 KV Line
Guarding of 11 KV Line with Gaurding Angel, Clamp Eye Bolts and Gaurding G.I. Wire 6 or 8 SWG 30 SPAN
28 no
Delivery: 180 days
#73
Fencing of 250 KVA Distribution Transformers
Fencing of Distribution Transformers with Enamel in proper alignment as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
17 no
Delivery: 180 days
#74
Plinth for 250 KVA Transformer
Plinth for 250 KVA Transformer Proper Size As per Resspo Norms
17 no
Delivery: 180 days
#75
Installation of 11by0.4 KV TF 25 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 25 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
6 no
Delivery: 180 days
#76
Installation of 11by0.4 KV TF 63 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 63 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
5 no
Delivery: 180 days
#77
Installation of 11by0.4 KV TF 100 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 100 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
6 no
Delivery: 180 days
#78
Installation of 11by0.4 KV TF 250 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 250 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
17 no
Delivery: 180 days
#79
Laying of 33 KV XLPE Cable 3x300 Sq.mm.
Laying of Following Cable by HDD Method with HDPE Pipe (140 mm.) including digging and restoring along with Brick and Sand including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 33 KV XLPE Cable 3x300 Sq.mm.
380 m
Delivery: 180 days
#80
Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.
Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.
8 no
Delivery: 180 days
#81
Dismentlling, Received Back and Safe Carriage of Jarjar G.I. Wire and Weasel Conducter including with rolling from Pit Site to ESC, Mainpuri
Dismentlling of Jarjar G.I. Wire and Weasel Conducter including with rolling Received Back and Safe Carriage from Pit Site to ESC, Mainpuri
1,300 kg
Delivery: 180 days
#82
Received Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri
Received Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri ( 17 Nos 100 KVA)
17 no
Delivery: 180 days
Item #
Title
Description
Quantity
Unit
Consignee
Delivery (Days)
Price Trends
1
Supply of 11 KV V type cross arm Clamp with bolts and nuts
Clamp For 11 KV V type cross arm with bolts and nuts
604
no
edcmainpuriconsignee
180
2
Supply of Three Phase Distribution Box Clamp with Nut and Bolts
Three Phase Distribution Box Clamp with Nut and Bolts
50
no
edcmainpuriconsignee
180
3
Supply of Connecting Cable for DB 1x35 Sq.mm.
Connecting Cable for Distribution Box 1x35 Sq.mm.
200
m
edcmainpuriconsignee
180
4
Supply of L.T. Fuse Set Protection Box with all Accessories
L.T. Fuse Set Protection Box with all Accessories
59
no
edcmainpuriconsignee
180
5
Supply of Tinned Copper Fuse Wire Different Size
Tinned Copper Fuse Wire Different Size
20
kg
edcmainpuriconsignee
180
6
Supply of HDPE PIPE 140 MM.
HDPE PIPE 140 MM.
350
m
edcmainpuriconsignee
180
7
Supply of Stone Pad 300x300x75
Stone Pad 300x300x75
666
no
edcmainpuriconsignee
180
8
Supply of Holding Clamp for Doulble Pole Unit with Nut and Bolts
Holding Clamp for Doulble Pole Unit with Nut and Bolts
85
no
edcmainpuriconsignee
180
9
Supply of MS Angle 75x75x6x2028mm with clamp and Bolt and nut
MS Angle 75x75x6x2028mm with clamp and Bolt and nut T or F base
34
no
edcmainpuriconsignee
180
10
Supply of T Off Chhanel T off Clamp with Nut and Bolts
T Off Chhanel and T off Clamp with Nut and Bolts
17
no
edcmainpuriconsignee
180
11
Supply of Top Chhanel 125x65x240
Top Chhanel 125x65x240
20
no
edcmainpuriconsignee
180
12
Supply of Dropper Channel 100x50x2028 mm
Dropper Channel 100x50x2028 mm.
17
no
edcmainpuriconsignee
180
13
Supply of Danger Board With Clamp and Nut and Bolt
Danger Board With Clamp and Nut and Bolt
150
no
edcmainpuriconsignee
180
14
Supply of G.I. Patti Clamp Nut and Bolts as per Norms
Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
34
no
edcmainpuriconsignee
180
15
Supply of L.T. Tail Less unit with all respective material
L.T. Tail Less unit with all respective material Angel, Patti and other Material
56
no
edcmainpuriconsignee
180
16
Supply of Copper L Pieace 62x225x12mm.
Copper L Pieace 62x225x12mm.
68
no
edcmainpuriconsignee
180
17
Supply of 11 KV F Clamp with Nut and Bolts
11 KV F Clamp with Nut and Bolts
604
no
edcmainpuriconsignee
180
18
Supply of Suspension Clamp
Suspension Clamp
50
no
edcmainpuriconsignee
180
19
Supply of Dead End Clamp
Dead End Clamp
20
no
edcmainpuriconsignee
180
20
Supply of Eye i Hook
Eye i Hook
10
no
edcmainpuriconsignee
180
21
Supply of Eye bolts for Guarding
Eye bolts for Guarding
30
no
edcmainpuriconsignee
180
22
Supply of J hook
J hook
50
no
edcmainpuriconsignee
180
23
Supply of LT Clamp For PCC or STP with Bolts and Nuts
LT Clamp For PCC or STP with Bolts and Nuts
50
no
edcmainpuriconsignee
180
24
Supply of Pearcing Connector
Pearcing Connector
200
no
edcmainpuriconsignee
180
25
Supply of Alluminium LUG 120 Sq.mm.
Alluminium LUG 120 Sq.mm.
576
no
edcmainpuriconsignee
180
26
Supply of Alluminium LUG 240 Sq.mm.
Alluminium LUG 240 Sq.mm.
204
no
edcmainpuriconsignee
180
27
Supply of Alluminium LUG 400 Sq.mm.
Alluminium LUG 400 Sq.mm.
132
no
edcmainpuriconsignee
180
28
Supply of Nut bolts and washers Off Size
Nut bolts and washers Off Size
10
kg
edcmainpuriconsignee
180
29
Supply of Guarding Angel
Guarding Angel
30
no
edcmainpuriconsignee
180
30
Supply of Guarding Angel Clamp
Guarding Angel Clamp
30
no
edcmainpuriconsignee
180
31
Supply of M.S. Angel Iron 65x65x6 mm. 2700 mm Long Bracing
M.S. Angel Iron 65x65x6 mm. 2700 mm Long Bracing with 4 Nos Clamp with Nut and Bolts
1
no
edcmainpuriconsignee
180
32
Carriage of 13 M STP Pole SP55 Galvanised from ESC MNP
13 M STP Pole SP55 Galvanised
3
no
edcmainpuriconsignee
180
33
Carriage of 8.5 M PCC Pole from ESC MNP
8.5 M PCC Pole
666
no
edcmainpuriconsignee
180
34
Carriage of V Type Cross Arm for 11 KV from ESC MNP
V Type Cross Arm for 11 KV
604
no
edcmainpuriconsignee
180
35
Carriage of 11 KV Pin Insulator with Pin from ESC MNP
11 KV Pin Insulator with Pin
1,917
no
edcmainpuriconsignee
180
36
Carriage of Disc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS from ESC MNP
Disc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS
141
no
edcmainpuriconsignee
180
37
Carriage of 11 KV Fuse Set from ESC MNP
11 KV Fuse Set
17
no
edcmainpuriconsignee
180
38
Carriage of 11 KV TPMO with Polymer Insulator from ESC MNP
11 KV TPMO with Polymer Insulator
17
no
edcmainpuriconsignee
180
39
Carriage of Complete Stay 9GI Stay Rod 20x1800 mm etc material from ESC MNP
Complete Stay 9GI Stay Rod 20x1800 mm stay wire 7 and 8 SWG 10 KG Stay Clamp Bolt nut and washer
40
no
edcmainpuriconsignee
180
40
Carriage of Distribution Transformer 25 KVA from ESC MNP
Distribution Transformer 25 KVA
6
no
edcmainpuriconsignee
180
41
Carriage of Distribution Transformer 63 KVA from ESC MNP
Distribution Transformer 63 KVA
5
no
edcmainpuriconsignee
180
42
Carriage of Distribution Transformer 100 KVA from ESC MNP
Distribution Transformer 100 KVA
6
no
edcmainpuriconsignee
180
43
Carriage of Distribution Transformer 250 KVA from ESC MNP
Distribution Transformer 250 KVA
17
no
edcmainpuriconsignee
180
44
Carriage of ACSR weasel Conductor from ESC MNP
ACSR weasel Conductor or Insulated Conductor as provided by Department
144
km
edcmainpuriconsignee
180
45
Carriage of M S Earthing Rod 20 x2540 mm from ESC MNP
M S Earthing Rod 20 x2540 mm
708
no
edcmainpuriconsignee
180
46
Carriage of LT AL. XLPE CABLE SIZE 1x240 Sq.mm. from ESC MNP
LT AL. XLPE CABLE SIZE 1x240 Sq.mm.
1,300
m
edcmainpuriconsignee
180
47
Carriage of LT XLPE CABLE 1X120 Sq.mm. FOR DTR from ESC MNP
LT XLPE CABLE 1X120 Sq.mm. FOR DTR
50
m
edcmainpuriconsignee
180
48
Carriage of LT XLPE CABLE 1X400 Sq.mm. FOR DTR from ESC MNP
LT XLPE CABLE 1X400 Sq.mm. FOR DTR
476
m
edcmainpuriconsignee
180
49
Carriage of LT XLPE Cable Size 3.5x70 or 35 Sq.mm. from ESC MNP
LT XLPE Cable Size 3.5x70 or 35 Sq.mm.
150
m
edcmainpuriconsignee
180
50
Carriage of LT AB Cable 3x120 1x95 1x16 Sq.mm. from ESC MNP
LT AB Cable 3x120 1x95 1x16 Sq.mm.
500
m
edcmainpuriconsignee
180
51
Carriage of LT AB Cable 3x50 1x35 1x16 Sq.mm. from ESC MNP
LT AB Cable 3x50 1x35 1x16 Sq.mm.
1,000
m
edcmainpuriconsignee
180
52
Carriage of LT AB Cable 3x95 1x70 1x16 Sq.mm. from ESC MNP
LT AB Cable 3x95 1x70 1x16 Sq.mm.
1,000
m
edcmainpuriconsignee
180
53
Carriage of 33 KV XLPE Cable 3x300 Sq.mm. from ESC MNP
33 KV XLPE Cable 3x300 Sq.mm.
430
m
edcmainpuriconsignee
180
54
Carriage of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. from ESC MNP
33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm.
8
no
edcmainpuriconsignee
180
55
Carriage of 33 KV Straight Through Size 3x300 Sq.mm. from ESC MNP
33 KV Straight Through Size 3x300 Sq.mm.
2
no
edcmainpuriconsignee
180
56
Carriage of G.I. Wire 6 or 8 SWG for Guarding from ESC MNP
G.I. Wire 6 or 8 SWG for Guarding
835
kg
edcmainpuriconsignee
180
57
Carriage of Three Phase Distribution Box from ESC MNP
Three Phase Distribution Box
50
no
edcmainpuriconsignee
180
58
Erection of Fixing of LT Fuse Set Protection Box with all respective Accessories As per Norms
Fixing of L.T. Fuse Set Protection Box with all respective Accessories As per Norms
59
no
edcmainpuriconsignee
180
59
Execution of Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
34
no
edcmainpuriconsignee
180
60
Erection of L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.
L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.
56
no
edcmainpuriconsignee
180
61
Laying of ACSR weasel Conductor
Laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. ACSR weasel Conductor or Insulated Conductor as provided by Department
144
km
edcmainpuriconsignee
180
62
Laying of LT AB Cable 3x120 1x95 1x16 Sq.mm.
Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x120 1x95 1x16 Sq.mm.
500
m
edcmainpuriconsignee
180
63
Laying of LT AB Cable 3x50 1x35 1x16 Sq.mm.
Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x50 1x35 1x16 Sq.mm
1,000
m
edcmainpuriconsignee
180
64
Laying of LT AB Cable 3x95 1x70 1x16 Sq.mm.
Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x95 1x70 1x16 Sq.mm.
1,000
m
edcmainpuriconsignee
180
65
Mounting of Three Phase Distribution Box
Mounting of Three Phase Distribution Box with Clamp nut & Bolts and Make Proper Connection with Connecting Cable.
50
no
edcmainpuriconsignee
180
66
Erection of Double pole structure 8.5 Mtr PCC Pole
Erection of Double pole structure 8.5 Mtr PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 34 Nos Pole At Different Location Under Concern Division.
17
no
edcmainpuriconsignee
180
67
Erection of single pole structure 8.5 Mtrs PCC Pole
Erection of single pole structure 8.5 Mtrs PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. At Different Location Under Concern Division.
632
no
edcmainpuriconsignee
180
68
Erection of TRI pole structure 33 KV 13 Mtr ST Pole
Erection of TRI pole structure 33 KV 13 Mtr ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 3 Nos Pole At Different Location Under Concern Division.
1
no
edcmainpuriconsignee
180
69
Grouting of PCC or STP POLE
Grouting of PCC or STP POLE Long As per Respo Norms with Material Cement, Sand, Blast Stone with the ratio 0.268 Cu.m. each will be provided by conractor
669
no
edcmainpuriconsignee
180
70
Grouting of Stay
Grouting of Stay As per Respo Norms Cement, Sand, Blast Stone material will be provided by conractor
40
no
edcmainpuriconsignee
180
71
Earthing of pole
Earthing of pole by M S Earthing Rod 20 x2540 mm with 6 SWG earthing wire etc and make Proper Connection.
669
no
edcmainpuriconsignee
180
72
Guarding of 11 KV Line
Guarding of 11 KV Line with Gaurding Angel, Clamp Eye Bolts and Gaurding G.I. Wire 6 or 8 SWG 30 SPAN
28
no
edcmainpuriconsignee
180
73
Fencing of 250 KVA Distribution Transformers
Fencing of Distribution Transformers with Enamel in proper alignment as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
17
no
edcmainpuriconsignee
180
74
Plinth for 250 KVA Transformer
Plinth for 250 KVA Transformer Proper Size As per Resspo Norms
17
no
edcmainpuriconsignee
180
75
Installation of 11by0.4 KV TF 25 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 25 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
6
no
edcmainpuriconsignee
180
76
Installation of 11by0.4 KV TF 63 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 63 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
5
no
edcmainpuriconsignee
180
77
Installation of 11by0.4 KV TF 100 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 100 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
6
no
edcmainpuriconsignee
180
78
Installation of 11by0.4 KV TF 250 KVA
Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 250 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
17
no
edcmainpuriconsignee
180
79
Laying of 33 KV XLPE Cable 3x300 Sq.mm.
Laying of Following Cable by HDD Method with HDPE Pipe (140 mm.) including digging and restoring along with Brick and Sand including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 33 KV XLPE Cable 3x300 Sq.mm.
380
m
edcmainpuriconsignee
180
80
Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.
Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.
8
no
edcmainpuriconsignee
180
81
Dismentlling, Received Back and Safe Carriage of Jarjar G.I. Wire and Weasel Conducter including with rolling from Pit Site to ESC, Mainpuri
Dismentlling of Jarjar G.I. Wire and Weasel Conducter including with rolling Received Back and Safe Carriage from Pit Site to ESC, Mainpuri
1,300
kg
edcmainpuriconsignee
180
82
Received Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri
Received Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri ( 17 Nos 100 KVA)
17
no
edcmainpuriconsignee
180
🤖 AI-Powered Bidder Prediction
Discover companies most likely to bid on this tender
Live AI
Historical Data
Required Documents
1
GST registration certificate
2
PAN card
3
Experience certificates (relevant past projects)
4
Financial statements (audited if available)
5
EMD submission document (or FDR in lieu as per ATC)
6
Technical bid documents and compliance certificates
7
OEM authorizations (if applicable)
8
scanned copy of FDR (in place of PBG) uploaded
9
Original hard copy of FDR to be delivered within 15 days of award
Frequently Asked Questions
Key insights about UTTAR PRADESH tender market
How to bid in tender in Mainpuri Uttar Pradesh for UPPCL procurement 2026
Bidders should first ensure GST and PAN are valid, then prepare EMD of ₹70,000 or alternative FDR per ATC. Upload scanned FDR if using security, and include audited financials, experience certificates, OEM authorizations if required. Adhere to 25% quantity option and delivery-time calculations as per contract terms.
What documents are required for the Mainpuri UPPCL tender submission
Submit GST certificate, PAN, experience certificates, financial statements, EMD document or FDR, technical compliance certificates, OEM authorizations if applicable, and scanned FDR with a hard copy to be delivered within 15 days of award; ensure GeM ATC compliance.
What is the EMD amount for the Mainpuri procurement and payment terms
EMD is ₹70,000. Alternative is an FDR as per ATC terms; ensure FDR is endorsed to SUPERINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE MAINPURI and uploaded; original FDR to be delivered within 15 days after award.
What are the delivery terms and the 25% option clause for this tender
The purchaser may increase or decrease quantity up to 25% at award and during contract. Delivery period will adjust using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
What is the contract value and BOQ details for the Mainpuri tender
Estimated contract value is ₹7,000,000. BoQ contains 82 items, though item-specific specifications are not provided in the tender data; bidders should prepare for a broad goods procurement with standard compliance requirements.
How to submit the FDR if opting for security for this UPPCL tender
Upload scanned FDR copy in place of PBG, ensure endorsement on the back, prepare covering letter, and deliver the original hard copy within 15 days of award to the Superintending Engineer, Mainpuri.
What standards or certifications are required for this UPPCL Mainpuri bid
Tender data does not specify item-level standards; bidders should rely on GeM GTC ATC framework and seek OEM authorizations if needed, ensuring financial and technical readiness and readiness for delivery scheduling under the 25% option clause.
When is the delivery schedule applicable under the option clause in this tender
Delivery schedule applies from the last date of the original delivery order; if extended due to option exercise, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Similar Tenders
5 found
Supply of JOINTING KIT SUITABLE FOR 3.5CX240 SQMM LT CABLE,Supply of 11 KV CABLE JOINTING KIT SUITA