TenderDekho Logo
GEM

Uttar Pradesh Power Corporation Limited Mainpuri Procurement Tender 2026 - 7,000,000 INR EMD ₹70,000 25% Quantity Option

Bid Publish Date

20-Jun-2026, 7:49 pm

Bid End Date

06-Jul-2026, 8:00 pm

EMD

₹70,000

Value

₹70,00,000

Progress

Issue20-Jun-2026, 7:49 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

21191

Category

Carriage of ACSR weasel Conductor from ESC MNP

Bid Type

Two Packet Bid

Key Highlights

  • 25% quantity variation clause during both initial and currency of contract
  • FDR as permissible alternative to performance guarantee (PBG) with specified endorsement
  • Delivery period scales with quantity changes, minimum 30 days
  • Hard-copy FDR to be submitted within 15 days of award
  • BoQ comprises 82 items; no item-specific specifications provided
  • GeM GTC ATC compliance required for submission and security documents

Categories 85

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department, serving Uttar Pradesh. Location: Mainpuri, Uttar Pradesh 205001. Product/Service: No specific item details provided; procurement relates to general goods under GeM framework with 82 BoQ items listed (N/A specifics). Estimated Value: ₹7,000,000; EMD: ₹70,000. Unique terms include a 25% quantity option at contract award and during currency, plus a delivery-time computation formula. The contract allows flexible volume changes and extended delivery timelines while maintaining contracted rates. A notable clause permits submission of a Fixed Deposit Receipt (FDR) as performance security in lieu of a conventional PBG, with hard-copy delivery within 15 days of award. These factors shape bid strategy and risk assessment for suppliers.

Technical Specifications & Requirements

  • EMD: ₹70,000; payment/guarantee method per GeM GTC and ATC.
  • Estimated contract value: ₹7,000,000.
  • Option clause: Purchaser may increase/decrease quantity up to 25% of bid/contract quantity.
  • Delivery timeline: Calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extended periods permissible during option exercise.
  • Security options: FDR acceptable as performance security; FDR must be named to the Purchaser and delivered within 15 days of award.
  • BoQ: 82 items listed; detailed specifications not provided in tender data.
  • ATC note: Hard-copy FDR submission required; scanned copy uploaded in place of PBG.
  • Delivery/installation scope: To be governed by contract terms and delivery orders issued post-award.

Terms, Conditions & Eligibility

  • Delivery terms: As per contract with option-based quantity adjustments; base delivery period defined in original order.
  • EMD & security: ₹70,000 EMD; FDR alternative allowed with documentary requirements; hard copy due within 15 days of award.
  • PBG/FDR hybrid: FDR may be used in place of PBG; ensure proper endorsement on the back and official covering letter.
  • Quantity flexibility: Up to 25% increase/decrease; extended delivery time calculations apply.
  • Documentation: Upload scanned FDR; provide original hard copy to buyer within 15 days; comply with GeM GTC ATC terms.
  • Bid compliance: Bidders must adhere to all ATC terms and option clause application during contract execution.

Key Specifications

  • Procurement category: general goods under GeM with 82 BoQ items

  • EMD amount: ₹70,000

  • Estimated contract value: ₹7,000,000

  • Quantity variation: ±25% across contract lifecycle

  • Security: FDR acceptable as performance security

  • Delivery timeline: calculated via formula with minimum 30 days

  • Submission: scanned FDR uploaded; original hard copy due within 15 days

Terms & Conditions

  • EMD amount and alternate FDR-based security acceptance

  • 25% quantity variation rights for purchaser

  • Delivery period computation with minimum 30 days

  • Hard-copy FDR due within 15 days of award

Important Clauses

Delivery & Option Clause

Purchaser may adjust quantity by up to 25% at award and during contract, with calculated extended delivery time; minimum 30 days, original delivery period if less.

Performance Security

FDR allowed in lieu of PBG; FDR must be endorsed and payable to SUPERINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE MAINPURI; scanned copy uploaded, original within 15 days.

Payment & Compliance

Payment terms follow GeM/GTC ATC; ensure submission of required documents (GST, PAN, experience, financials) with bid; adherence to option clause during contract execution.

Bidder Eligibility

  • Past experience in supplying similar general goods to electricity distribution entities

  • Demonstrated financial stability with auditable statements

  • Compliance with GeM GTC and ATC terms, including EMD/FDR submission

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9492899.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Government Tender Published for Supply of 145 KV Male and female contact 33 KV CT clamp and 145 KV Outdoor Bushing Terminal Clamp at 132 KV Substation Minto Park and Teliarganj Prayagraj under ETD-II Prayagraj in PRAYAGRAJ, UTTAR PRADESH

UP Power Transmission Corp.Ltd (Operation)

PRAYAGRAJ, UTTAR PRADESH

Posted: 3 February 2026
Closed: 16 February 2026
EPROCURE

Government Tender Published for supply of 11 kv and 33 kv jointing kits of different sizes in MEERUT, UTTAR PRADESH

Paschimanchal Vidyut Vitran Nigam Ltd.

MEERUT, UTTAR PRADESH

Posted: 18 May 2026
Closed: 29 May 2026
EPROCURE

Open Tender for SUPPLY OF 11 KV CROSS ARM V TYPE in DEHRADUN, UTTARAKHAND

N/A

DEHRADUN, UTTARAKHAND

Posted: 15 April 2023
Closed: 2 May 2023
EPROCURE

Tender Notice for Supply and Delivery of 11 KV TOP ADAPTOR for PCC pole 8M long, DEAD END CLAMP for LT ABC, FIXED CONTACT SET FOR 33KV CR TYPE ISL under Islampur Division in DINAJPUR UTTAR, WEST BENGAL

WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD

DINAJPUR UTTAR, WEST BENGAL

Posted: 6 March 2026
Closed: 18 March 2026
EPROCURE

Invitation to Bid - Procurement of Clamps for CS pipes and 90/10 Cu-Ni/Copper Pipes for P17A in MUMBAI, MAHARASHTRA

N/A

MUMBAI, MAHARASHTRA

Posted: 20 July 2018
Closed: 8 August 2018
EPROCURE

Bill of Quantities (BOQ) 82 Items Sign in for GEM prices

#1

Supply of 11 KV V type cross arm Clamp with bolts and nuts

Clamp For 11 KV V type cross arm with bolts and nuts

604 no Delivery: 180 days
#2

Supply of Three Phase Distribution Box Clamp with Nut and Bolts

Three Phase Distribution Box Clamp with Nut and Bolts

50 no Delivery: 180 days
#3

Supply of Connecting Cable for DB 1x35 Sq.mm.

Connecting Cable for Distribution Box 1x35 Sq.mm.

200 m Delivery: 180 days
#4

Supply of L.T. Fuse Set Protection Box with all Accessories

L.T. Fuse Set Protection Box with all Accessories

59 no Delivery: 180 days
#5

Supply of Tinned Copper Fuse Wire Different Size

Tinned Copper Fuse Wire Different Size

20 kg Delivery: 180 days
#6

Supply of HDPE PIPE 140 MM.

HDPE PIPE 140 MM.

350 m Delivery: 180 days
#7

Supply of Stone Pad 300x300x75

Stone Pad 300x300x75

666 no Delivery: 180 days
#8

Supply of Holding Clamp for Doulble Pole Unit with Nut and Bolts

Holding Clamp for Doulble Pole Unit with Nut and Bolts

85 no Delivery: 180 days
#9

Supply of MS Angle 75x75x6x2028mm with clamp and Bolt and nut

MS Angle 75x75x6x2028mm with clamp and Bolt and nut T or F base

34 no Delivery: 180 days
#10

Supply of T Off Chhanel T off Clamp with Nut and Bolts

T Off Chhanel and T off Clamp with Nut and Bolts

17 no Delivery: 180 days
#11

Supply of Top Chhanel 125x65x240

Top Chhanel 125x65x240

20 no Delivery: 180 days
#12

Supply of Dropper Channel 100x50x2028 mm

Dropper Channel 100x50x2028 mm.

17 no Delivery: 180 days
#13

Supply of Danger Board With Clamp and Nut and Bolt

Danger Board With Clamp and Nut and Bolt

150 no Delivery: 180 days
#14

Supply of G.I. Patti Clamp Nut and Bolts as per Norms

Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms

34 no Delivery: 180 days
#15

Supply of L.T. Tail Less unit with all respective material

L.T. Tail Less unit with all respective material Angel, Patti and other Material

56 no Delivery: 180 days
#16

Supply of Copper L Pieace 62x225x12mm.

Copper L Pieace 62x225x12mm.

68 no Delivery: 180 days
#17

Supply of 11 KV F Clamp with Nut and Bolts

11 KV F Clamp with Nut and Bolts

604 no Delivery: 180 days
#18

Supply of Suspension Clamp

Suspension Clamp

50 no Delivery: 180 days
#19

Supply of Dead End Clamp

Dead End Clamp

20 no Delivery: 180 days
#20

Supply of Eye i Hook

Eye i Hook

10 no Delivery: 180 days
#21

Supply of Eye bolts for Guarding

Eye bolts for Guarding

30 no Delivery: 180 days
#22

Supply of J hook

J hook

50 no Delivery: 180 days
#23

Supply of LT Clamp For PCC or STP with Bolts and Nuts

LT Clamp For PCC or STP with Bolts and Nuts

50 no Delivery: 180 days
#24

Supply of Pearcing Connector

Pearcing Connector

200 no Delivery: 180 days
#25

Supply of Alluminium LUG 120 Sq.mm.

Alluminium LUG 120 Sq.mm.

576 no Delivery: 180 days
#26

Supply of Alluminium LUG 240 Sq.mm.

Alluminium LUG 240 Sq.mm.

204 no Delivery: 180 days
#27

Supply of Alluminium LUG 400 Sq.mm.

Alluminium LUG 400 Sq.mm.

132 no Delivery: 180 days
#28

Supply of Nut bolts and washers Off Size

Nut bolts and washers Off Size

10 kg Delivery: 180 days
#29

Supply of Guarding Angel

Guarding Angel

30 no Delivery: 180 days
#30

Supply of Guarding Angel Clamp

Guarding Angel Clamp

30 no Delivery: 180 days
#31

Supply of M.S. Angel Iron 65x65x6 mm. 2700 mm Long Bracing

M.S. Angel Iron 65x65x6 mm. 2700 mm Long Bracing with 4 Nos Clamp with Nut and Bolts

1 no Delivery: 180 days
#32

Carriage of 13 M STP Pole SP55 Galvanised from ESC MNP

13 M STP Pole SP55 Galvanised

3 no Delivery: 180 days
#33

Carriage of 8.5 M PCC Pole from ESC MNP

8.5 M PCC Pole

666 no Delivery: 180 days
#34

Carriage of V Type Cross Arm for 11 KV from ESC MNP

V Type Cross Arm for 11 KV

604 no Delivery: 180 days
#35

Carriage of 11 KV Pin Insulator with Pin from ESC MNP

11 KV Pin Insulator with Pin

1,917 no Delivery: 180 days
#36

Carriage of Disc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS from ESC MNP

Disc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS

141 no Delivery: 180 days
#37

Carriage of 11 KV Fuse Set from ESC MNP

11 KV Fuse Set

17 no Delivery: 180 days
#38

Carriage of 11 KV TPMO with Polymer Insulator from ESC MNP

11 KV TPMO with Polymer Insulator

17 no Delivery: 180 days
#39

Carriage of Complete Stay 9GI Stay Rod 20x1800 mm etc material from ESC MNP

Complete Stay 9GI Stay Rod 20x1800 mm stay wire 7 and 8 SWG 10 KG Stay Clamp Bolt nut and washer

40 no Delivery: 180 days
#40

Carriage of Distribution Transformer 25 KVA from ESC MNP

Distribution Transformer 25 KVA

6 no Delivery: 180 days
#41

Carriage of Distribution Transformer 63 KVA from ESC MNP

Distribution Transformer 63 KVA

5 no Delivery: 180 days
#42

Carriage of Distribution Transformer 100 KVA from ESC MNP

Distribution Transformer 100 KVA

6 no Delivery: 180 days
#43

Carriage of Distribution Transformer 250 KVA from ESC MNP

Distribution Transformer 250 KVA

17 no Delivery: 180 days
#44

Carriage of ACSR weasel Conductor from ESC MNP

ACSR weasel Conductor or Insulated Conductor as provided by Department

144 km Delivery: 180 days
#45

Carriage of M S Earthing Rod 20 x2540 mm from ESC MNP

M S Earthing Rod 20 x2540 mm

708 no Delivery: 180 days
#46

Carriage of LT AL. XLPE CABLE SIZE 1x240 Sq.mm. from ESC MNP

LT AL. XLPE CABLE SIZE 1x240 Sq.mm.

1,300 m Delivery: 180 days
#47

Carriage of LT XLPE CABLE 1X120 Sq.mm. FOR DTR from ESC MNP

LT XLPE CABLE 1X120 Sq.mm. FOR DTR

50 m Delivery: 180 days
#48

Carriage of LT XLPE CABLE 1X400 Sq.mm. FOR DTR from ESC MNP

LT XLPE CABLE 1X400 Sq.mm. FOR DTR

476 m Delivery: 180 days
#49

Carriage of LT XLPE Cable Size 3.5x70 or 35 Sq.mm. from ESC MNP

LT XLPE Cable Size 3.5x70 or 35 Sq.mm.

150 m Delivery: 180 days
#50

Carriage of LT AB Cable 3x120 1x95 1x16 Sq.mm. from ESC MNP

LT AB Cable 3x120 1x95 1x16 Sq.mm.

500 m Delivery: 180 days
#51

Carriage of LT AB Cable 3x50 1x35 1x16 Sq.mm. from ESC MNP

LT AB Cable 3x50 1x35 1x16 Sq.mm.

1,000 m Delivery: 180 days
#52

Carriage of LT AB Cable 3x95 1x70 1x16 Sq.mm. from ESC MNP

LT AB Cable 3x95 1x70 1x16 Sq.mm.

1,000 m Delivery: 180 days
#53

Carriage of 33 KV XLPE Cable 3x300 Sq.mm. from ESC MNP

33 KV XLPE Cable 3x300 Sq.mm.

430 m Delivery: 180 days
#54

Carriage of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. from ESC MNP

33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm.

8 no Delivery: 180 days
#55

Carriage of 33 KV Straight Through Size 3x300 Sq.mm. from ESC MNP

33 KV Straight Through Size 3x300 Sq.mm.

2 no Delivery: 180 days
#56

Carriage of G.I. Wire 6 or 8 SWG for Guarding from ESC MNP

G.I. Wire 6 or 8 SWG for Guarding

835 kg Delivery: 180 days
#57

Carriage of Three Phase Distribution Box from ESC MNP

Three Phase Distribution Box

50 no Delivery: 180 days
#58

Erection of Fixing of LT Fuse Set Protection Box with all respective Accessories As per Norms

Fixing of L.T. Fuse Set Protection Box with all respective Accessories As per Norms

59 no Delivery: 180 days
#59

Execution of Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms

Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms

34 no Delivery: 180 days
#60

Erection of L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.

L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.

56 no Delivery: 180 days
#61

Laying of ACSR weasel Conductor

Laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. ACSR weasel Conductor or Insulated Conductor as provided by Department

144 km Delivery: 180 days
#62

Laying of LT AB Cable 3x120 1x95 1x16 Sq.mm.

Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x120 1x95 1x16 Sq.mm.

500 m Delivery: 180 days
#63

Laying of LT AB Cable 3x50 1x35 1x16 Sq.mm.

Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x50 1x35 1x16 Sq.mm

1,000 m Delivery: 180 days
#64

Laying of LT AB Cable 3x95 1x70 1x16 Sq.mm.

Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x95 1x70 1x16 Sq.mm.

1,000 m Delivery: 180 days
#65

Mounting of Three Phase Distribution Box

Mounting of Three Phase Distribution Box with Clamp nut & Bolts and Make Proper Connection with Connecting Cable.

50 no Delivery: 180 days
#66

Erection of Double pole structure 8.5 Mtr PCC Pole

Erection of Double pole structure 8.5 Mtr PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 34 Nos Pole At Different Location Under Concern Division.

17 no Delivery: 180 days
#67

Erection of single pole structure 8.5 Mtrs PCC Pole

Erection of single pole structure 8.5 Mtrs PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. At Different Location Under Concern Division.

632 no Delivery: 180 days
#68

Erection of TRI pole structure 33 KV 13 Mtr ST Pole

Erection of TRI pole structure 33 KV 13 Mtr ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 3 Nos Pole At Different Location Under Concern Division.

1 no Delivery: 180 days
#69

Grouting of PCC or STP POLE

Grouting of PCC or STP POLE Long As per Respo Norms with Material Cement, Sand, Blast Stone with the ratio 0.268 Cu.m. each will be provided by conractor

669 no Delivery: 180 days
#70

Grouting of Stay

Grouting of Stay As per Respo Norms Cement, Sand, Blast Stone material will be provided by conractor

40 no Delivery: 180 days
#71

Earthing of pole

Earthing of pole by M S Earthing Rod 20 x2540 mm with 6 SWG earthing wire etc and make Proper Connection.

669 no Delivery: 180 days
#72

Guarding of 11 KV Line

Guarding of 11 KV Line with Gaurding Angel, Clamp Eye Bolts and Gaurding G.I. Wire 6 or 8 SWG 30 SPAN

28 no Delivery: 180 days
#73

Fencing of 250 KVA Distribution Transformers

Fencing of Distribution Transformers with Enamel in proper alignment as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.

17 no Delivery: 180 days
#74

Plinth for 250 KVA Transformer

Plinth for 250 KVA Transformer Proper Size As per Resspo Norms

17 no Delivery: 180 days
#75

Installation of 11by0.4 KV TF 25 KVA

Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 25 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.

6 no Delivery: 180 days
#76

Installation of 11by0.4 KV TF 63 KVA

Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 63 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.

5 no Delivery: 180 days
#77

Installation of 11by0.4 KV TF 100 KVA

Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 100 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.

6 no Delivery: 180 days
#78

Installation of 11by0.4 KV TF 250 KVA

Installation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 250 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.

17 no Delivery: 180 days
#79

Laying of 33 KV XLPE Cable 3x300 Sq.mm.

Laying of Following Cable by HDD Method with HDPE Pipe (140 mm.) including digging and restoring along with Brick and Sand including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 33 KV XLPE Cable 3x300 Sq.mm.

380 m Delivery: 180 days
#80

Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.

Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.

8 no Delivery: 180 days
#81

Dismentlling, Received Back and Safe Carriage of Jarjar G.I. Wire and Weasel Conducter including with rolling from Pit Site to ESC, Mainpuri

Dismentlling of Jarjar G.I. Wire and Weasel Conducter including with rolling Received Back and Safe Carriage from Pit Site to ESC, Mainpuri

1,300 kg Delivery: 180 days
#82

Received Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri

Received Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri ( 17 Nos 100 KVA)

17 no Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (relevant past projects)

4

Financial statements (audited if available)

5

EMD submission document (or FDR in lieu as per ATC)

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable)

8

scanned copy of FDR (in place of PBG) uploaded

9

Original hard copy of FDR to be delivered within 15 days of award

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid in tender in Mainpuri Uttar Pradesh for UPPCL procurement 2026

Bidders should first ensure GST and PAN are valid, then prepare EMD of ₹70,000 or alternative FDR per ATC. Upload scanned FDR if using security, and include audited financials, experience certificates, OEM authorizations if required. Adhere to 25% quantity option and delivery-time calculations as per contract terms.

What documents are required for the Mainpuri UPPCL tender submission

Submit GST certificate, PAN, experience certificates, financial statements, EMD document or FDR, technical compliance certificates, OEM authorizations if applicable, and scanned FDR with a hard copy to be delivered within 15 days of award; ensure GeM ATC compliance.

What is the EMD amount for the Mainpuri procurement and payment terms

EMD is ₹70,000. Alternative is an FDR as per ATC terms; ensure FDR is endorsed to SUPERINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE MAINPURI and uploaded; original FDR to be delivered within 15 days after award.

What are the delivery terms and the 25% option clause for this tender

The purchaser may increase or decrease quantity up to 25% at award and during contract. Delivery period will adjust using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What is the contract value and BOQ details for the Mainpuri tender

Estimated contract value is ₹7,000,000. BoQ contains 82 items, though item-specific specifications are not provided in the tender data; bidders should prepare for a broad goods procurement with standard compliance requirements.

How to submit the FDR if opting for security for this UPPCL tender

Upload scanned FDR copy in place of PBG, ensure endorsement on the back, prepare covering letter, and deliver the original hard copy within 15 days of award to the Superintending Engineer, Mainpuri.

What standards or certifications are required for this UPPCL Mainpuri bid

Tender data does not specify item-level standards; bidders should rely on GeM GTC ATC framework and seek OEM authorizations if needed, ensuring financial and technical readiness and readiness for delivery scheduling under the 25% option clause.

When is the delivery schedule applicable under the option clause in this tender

Delivery schedule applies from the last date of the original delivery order; if extended due to option exercise, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

Similar Tenders

5 found

Supply of JOINTING KIT SUITABLE FOR 3.5CX240 SQMM LT CABLE,Supply of 11 KV CABLE JOINTING KIT SUITA

Uttar Pradesh Power Corporation Limited (uppcl)

📍 MAINPURI, UTTAR PRADESH

EMD: ₹1.5 L
Est: ₹1.5 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Supply of various types of clamp for 220 KV Switchyard at STPS

Gujarat State Electricity Corporation Limited

📍 JAMNAGAR, GUJARAT

⏰ Deadline: 3 days left
🛒 Type: Goods
View NPROCURE

Open Tender for Procurement of Back Clamp for PSC 9.0 Mtr.300 Kgs Pole in SALEM, TAMIL NADU

TNEB Limited

📍 SALEM, TAMIL NADU

EMD: ₹5,000
⏰ Deadline: 4 weeks left
🛒 Type: Goods
View EPROCURE

Procurement of C-clamp for Coal Handling Plant

Bokaro Power Supply Company Private Limited

📍 BOKARO, JHARKHAND

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Government Tender Published for SUPPLY OF HT AND LT BI METALLIC CLAMP FOR DISTRIBUTION TRANSFORMER in UJJAIN, MADHYA PRADESH

Madhya Pradesh Paschim Kshetra Vidyut Vitran Company Ltd

📍 UJJAIN, MADHYA PRADESH

EMD: ₹40,000
Est: ₹52.3 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View EPROCURE