Cassette AC 2Tr,Cassette AC 3Tr,Hi wall Split AC 1.5 Tr,Installation of cassette AC,Installation of
State Bank Of India (sbi)
Progress
Quantity
326
Category
4 Ton Inverter Cassette AC
Bid Type
Two Packet Bid
Public procurement opportunity for Indian Institute Of Technology (iit) 4 Ton Inverter Cassette AC, 3 Ton Inverter Cassette AC, One and Half Ton Split AC, Installation of One and half Ton Split AC, Installation of 4 Ton Cassette AC, Installation of 3 Ton Cassette AC, Copper refrigerant piping, Insulated Copper Refrigerant Piping, Providing and Laying of Cable, Drain Pipe Installation, Outdoor Unit Stand for Cassette AC, Outdoor Unit Stand for Hi Wall Split AC, Transportation and Shifting of AC Units, AC Installation Civil Works, False Ceiling Modification Work in SOUTH WEST DELHI, DELHI. Quantity: 326 issued by. Submission Deadline: 04-07-2026 17: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
4 Ton Inverter Cassette AC , 3 Ton Inverter Cassette AC , One and Half Ton Split AC , Installation of One and half Ton Split AC , Installation of 4 Ton Cassette AC , Installation of 3 Ton Cassette AC , Copper refrigerant piping , Insulated Copper Refrigerant Piping , Providing and Laying of Cable , Drain Pipe Installation , Outdoor Unit Stand for Cassette AC , Outdoor Unit Stand for Hi Wall Split AC , Transportation and Shifting of AC Units , AC Installation Civil Works , False Ceiling Modification Work
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
State Bank Of India (sbi)
State Bank Of India (sbi)
State Bank Of India (sbi)
LUCKNOW, UTTAR PRADESH
State Bank Of India (sbi)
LUCKNOW, UTTAR PRADESH
State Bank Of India (sbi)
LUCKNOW, UTTAR PRADESH
Tender Results
Loading results...
4 Ton Inverter Cassette AC
As per attached Sheet
3 Ton Inverter Cassette AC
As per attached Sheet
One and Half Ton Split AC
As per attached Sheet
Installation of One and half Ton Split AC
As per attached Sheet
Installation of 4 Ton Cassette AC
As per attached Sheet
Installation of 3 Ton Cassette AC
As per attached Sheet
Copper refrigerant piping
As per attached Sheet
Insulated Copper Refrigerant Piping
As per attached Sheet
Providing and Laying of Cable
As per attached Sheet
Drain Pipe Installation
As per attached Sheet
Outdoor Unit Stand for Cassette AC
As per attached Sheet
Outdoor Unit Stand for Hi Wall Split AC
As per attached Sheet
Transportation and Shifting of AC Units
As per attached Sheet
AC Installation Civil Works
As per attached Sheet
False Ceiling Modification Work
As per attached Sheet
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 4 Ton Inverter Cassette AC | As per attached Sheet | 5 | pcs | [email protected] | 60 | |
| 2 | 3 Ton Inverter Cassette AC | As per attached Sheet | 1 | pcs | [email protected] | 60 | |
| 3 | One and Half Ton Split AC | As per attached Sheet | 1 | pcs | [email protected] | 60 | |
| 4 | Installation of One and half Ton Split AC | As per attached Sheet | 1 | nos | [email protected] | 60 | |
| 5 | Installation of 4 Ton Cassette AC | As per attached Sheet | 5 | nos | [email protected] | 60 | |
| 6 | Installation of 3 Ton Cassette AC | As per attached Sheet | 1 | nos | [email protected] | 60 | |
| 7 | Copper refrigerant piping | As per attached Sheet | 80 | rmt | [email protected] | 60 | |
| 8 | Insulated Copper Refrigerant Piping | As per attached Sheet | 12 | rmt | [email protected] | 60 | |
| 9 | Providing and Laying of Cable | As per attached Sheet | 150 | rmt | [email protected] | 60 | |
| 10 | Drain Pipe Installation | As per attached Sheet | 60 | rmt | [email protected] | 60 | |
| 11 | Outdoor Unit Stand for Cassette AC | As per attached Sheet | 6 | nos | [email protected] | 60 | |
| 12 | Outdoor Unit Stand for Hi Wall Split AC | As per attached Sheet | 1 | nos | [email protected] | 60 | |
| 13 | Transportation and Shifting of AC Units | As per attached Sheet | 1 | lot | [email protected] | 60 | |
| 14 | AC Installation Civil Works | As per attached Sheet | 1 | lot | [email protected] | 60 | |
| 15 | False Ceiling Modification Work | As per attached Sheet | 1 | lot | [email protected] | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
State Bank Of India (sbi)
📍 LUCKNOW, UTTAR PRADESH
National Commission For Minorities(ncm)
📍 NEW DELHI, DELHI
Principal Bench Gst Appellate Tribunal
📍 KAMRUP, ASSAM
Nhpc Limited
📍 KATHUA, JAMMU & KASHMIR
State Bank Of India (sbi)
📍 LUCKNOW, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC